States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
South DakotaAvailable
North CarolinaAvailable
TennesseeAvailable
All states →
Projects
167 project guides — open the list

Solar Installation Requirements in North Carolina

North Carolina solar installation: no solar credential exists among the three boards (assembled absence, confidence reported), so the answer is the electrical ladder that actually governs — Limited ($60,000 AND ≤ 600 volts) vs Intermediate ($150,000) vs Unlimited (any value, plus the G.S. 87-43.2(a)(4) bonding-ability statement whose amount is withheld), the SP-SFD narrower alternative with rule .0800 disclosed as unread, 8 hours of CE half in person, and the Building classification for the mounting half above $40,000. Every claim sourced.

Verified 2026-10-094 sourced requirements3 credential linksIndexation gate: passed

01 The requirements, sourced

  • Electrical contracting licence — NCBEEC, ten classifications, separate licence per place of business — Electrical contracting in North Carolina is licensed by the NC State Board of Examiners of Electrical Contractors (Chapter 87 Article 4, 21 NCAC 18B) in ten classifications — Limited, Intermediate, Unlimited and seven Special Restricted — and rule .0403 states verbatim that 'a separate license certificate and license fee shall be required for each separate place of business'. One listed qualified individual holds each licence (except the same person holding different classifications at one place), business is conducted only in the exact licence name, and address changes must be reported within 30 days. S-NC-BEEC-LIC
  • Classification scopes — L ≤ $60,000 and ≤ 600 volts, I ≤ $150,000, U any value, seven Special Restricted phases — The NCBEEC licensing page defines the three full classifications verbatim: Limited — 'a single electrical contracting project of a value not in excess of sixty thousand dollars ($60,000) and on which the equipment or installation in the contract is rated at not more than 600 volts'; Intermediate — 'not in excess of one hundred fifty thousand dollars ($150,000)'; Unlimited — 'any electrical contracting project regardless of value'. The seven Special Restricted classifications (SP-SFD Residential Dwelling, SP-FA/LV Fire Alarm/Low-Voltage, SP-PH Plumbing/Heating/Air-Conditioning, SP-SP Swimming Pool, SP-WP Groundwater Pump, SP-ES Electric Sign, SP-EL Elevator) each cover 'only a limited phase of electrical contracting work' — the full per-class scopes live in rule .0800, which was not machine-readable this pass. S-NC-BEEC-LIC
  • $40,000 project-cost threshold for general contractor licensure (NCGS § 87-1) — Effective October 1, 2023, NCGS § 87-1 requires a valid North Carolina general contractor's license for any project that includes the construction of any building, highway, public utilities, grading or any improvement or structure where the cost of the undertaking is forty thousand dollars ($40,000) or more; any project that is less than forty thousand dollars ($40,000) does not require a valid general contractor's license in North Carolina (raised from the prior $30,000 threshold by HB 488). S-NC-LBGC-BUZZ
  • No standalone roofer/solar/painter/framer/handyman credential (assembled absence) — North Carolina issues NO standalone state credential titled roofer, solar installer, painter, framer or handyman: the state's construction-credential surface is exactly three boards — the NCLBGC's five general-contractor classifications (whose Building classification covers 'all building construction and demolition activity including … all residential building construction'), the NCBEEC's ten electrical classifications and the SBEPHFS's 31 plumbing/heating/fuel-piping/fire-sprinkler qualifications — all machine-read 2026-10-09. Work in those trades therefore rides the general-contractor threshold above $40,000 (Building classification, rule NC-GC-THRESHOLD), needs NO state credential below it, and picks up the electrical or plumbing licence only when those trades are touched. S-NC-LBGC-CLASS

02 Which credentials this project can touch

CredentialRelationRuleSource
Limited Electrical Contractor (NCBEEC)alternativeNC-ELEC-SCOPES-NC-BEEC-LIC
Building (NCLBGC general contractor)component basisNC-GC-THRESHOLDS-NC-LBGC-CLASS
Unlimited Electrical Contractor (NCBEEC)may requireNC-ELEC-LICENSES-NC-BEEC-LIC

Each row is one (project, classification, relation) triple the research record can source — the rendered sections and the seeded evidence can never disagree.

03 Deterministic rules applied

  • NC-ELEC-LICENSE
  • NC-ELEC-SCOPE
  • NC-GC-THRESHOLD
  • NC-NO-TRADE

04 Conflicts this project runs into

  • CONFLICT-NC-001 — NCBEEC annual licence fees: the board's Licensing page ($100/$150/$200/$100 per year) vs the board's own rule .0404 fee schedule ($95/$140/$190/$95) (unresolved)
  • CONFLICT-NC-002 — SBEPHFS examination application fee: 21 NCAC 50 .1101(c)'s $100 ($25 application + $75 examination) vs the board FAQ's $150 (unresolved)

Both are same-authority seams — the board's own page against the board's own rule text — and both stay unresolved on the fees page with both figures published.

05 What it costs

FeeAmountSource
Electrical examination review (optional, once)
Examinations page (machine-read 2026-10-09): exam review $25, once, monthly group sessions.
$25S-NC-BEEC-EXAM
General contractor licence — application fee, INTERMEDIATE
Laws book verbatim (snippet verified 2026-10-09): '$100.00 if the application is for an intermediate license'.
$100S-NC-LBGC-LAWS
General contractor licence — renewal fee cap, INTERMEDIATE ('not to exceed')
The '$100.00 …' that follows the unlimited cap in the laws book's renewal sentence (snippet verified 2026-10-09); the limited-renewal cap was not exposed and is withheld.
$100S-NC-LBGC-LAWS
Homeowners Recovery Fund fee — per single-family/modular permit unit
Rowan County's official page (machine-read 2026-10-09) publishes '$10.00 Homeowners Recovery Fund Fee' per unit and the $9 quarterly forwarding under NCGS § 87-15.6(b) / 21 NCAC 12A .0902 — read because the NCLBGC's own HRF page 403'd this fetcher (disclosed in the source). Charged by permit offices statewide; detached garages, bulkheads, piers and docks are excluded (§ 87-15.5(7)); apartment units pay nothing (FAQ).
$10S-NC-HRF-ROWAN
Limited electrical licence — annual fee (board LICENSING PAGE figure)
Licensing page verbatim (machine-read 2026-10-09): 'Limited License - $100/year'. CONFLICT-NC-001: the board's own rule .0404 schedule says $95.00 — both official figures are seeded and published beside each other.
$100S-NC-BEEC-LIC
Intermediate electrical licence — annual fee (board LICENSING PAGE figure)
Licensing page verbatim: 'Intermediate License - $150/year' (read 2026-10-09). CONFLICT-NC-001: rule .0404 says $140.00.
$150S-NC-BEEC-LIC
Unlimited electrical licence — annual fee (board LICENSING PAGE figure)
Licensing page verbatim: 'Unlimited License - $200/year' (read 2026-10-09). CONFLICT-NC-001: rule .0404 says $190.00.
$200S-NC-BEEC-LIC
Special Restricted electrical licence — annual fee (board LICENSING PAGE figure)
Licensing page verbatim: 'Special Restricted Licenses - $100/year' (read 2026-10-09). CONFLICT-NC-001: rule .0404 says $95.00.
$100S-NC-BEEC-LIC
Limited electrical licence — annual fee (rule .0404 SCHEDULE figure)
Rule .0404's fee schedule (machine-read 2026-10-09; .0404 amended eff. 2020-07-01) states $95.00 for the first tier. CONFLICT-NC-001: the board's licensing page says $100/year. No amendment record reconciling the two was found this pass.
$95S-NC-BEEC-0400
Intermediate electrical licence — annual fee (rule .0404 SCHEDULE figure)
Rule .0404 schedule figure $140.00 (read 2026-10-09). CONFLICT-NC-001: the licensing page says $150/year.
$140S-NC-BEEC-0400
Unlimited electrical licence — annual fee (rule .0404 SCHEDULE figure)
Rule .0404 schedule figure $190.00 (read 2026-10-09). CONFLICT-NC-001: the licensing page says $200/year.
$190S-NC-BEEC-0400
Special Restricted electrical licence — annual fee (rule .0404 SCHEDULE figure)
Rule .0404 schedule figure $95.00 for the Special Restricted tier (read 2026-10-09). CONFLICT-NC-001: the licensing page says $100/year.
$95S-NC-BEEC-0400
Electrical examination fee (PSI, paid with the application)
Examinations page verbatim (machine-read 2026-10-09): '$125.00 examination fee', PSI, 90-day Authorization Period; 'A minimum grade of 70 is required to pass'; a 90-day wait precedes any retest. The only unconflicted exam figure in the state.
$125S-NC-BEEC-EXAM
Electrical licence — late renewal administrative fee
Licensing page/rules .0405–.0406 verbatim (read 2026-10-09): '$25.00 … upon applications received after the expiration date'. Reinstatement stays possible for 12 months; beyond that, 500 hours of primary experience plus fees, the late fee and CE.
$25S-NC-BEEC-LIC
Electrical licence — duplicate certificate
Licensing page (machine-read 2026-10-09): duplicate certificate $15.
$15S-NC-BEEC-LIC
General contractor licence — application fee, LIMITED
Laws book verbatim (snippet verified 2026-10-09): '$75.00 if the application is for a limited license'. The unlimited counterpart was not exposed in any official snippet — unofficial mirrors say $125, which is NOT_VERIFIED and withheld.
$75S-NC-LBGC-LAWS
Restricted Limited Plumbing licence — annual
21 NCAC 50 .1102 verbatim (read 2026-10-09): $150 Restricted Limited Plumbing — the same price as the full contractor tier despite the shorter (9-month) experience gate.
$150S-NC-PHFS-1102
Licence issued WITHOUT Board examination
21 NCAC 50 .1102 verbatim (read 2026-10-09): $30 licence without Board examination — the administrative path distinct from the Neighbor State Recognition Act (REQ-NC-PLB-RECIPROCITY-001).
$30S-NC-PHFS-1102
Local-government inspector licence (with Code Officials Qualification Board credentials)
21 NCAC 50 .1102 verbatim (read 2026-10-09): $25 for a local-government inspector holding Code Officials Qualification Board credentials.
$25S-NC-PHFS-1102
Examination application fee — BOARD FAQ figure
FAQ verbatim (machine-read 2026-10-09): 'The examination application fee is $150.00 and is non-refundable.' CONFLICT-NC-002: rule .1101(c) (amended eff. 2023-03-01) says $100.00. The FAQ may predate the amendment, but no correction notice was found this pass — the inference is not asserted and neither figure is dropped.
$150S-NC-PHFS-FAQ
Fire sprinkler (installation / inspection / residential / maintenance technician) — annual
21 NCAC 50 .1102 verbatim (read 2026-10-09): $150 for the fire-sprinkler family — including the RESIDENTIAL installation tier a home addition touches.
$150S-NC-PHFS-1102
Technician licence listed second-or-later (or under a contractor) — annual
21 NCAC 50 .1102 verbatim (read 2026-10-09): $75 — the tiered technician fee for additional individuals on one firm's licence.
$75S-NC-PHFS-1102
General contractor licence — renewal fee cap, UNLIMITED ('not to exceed')
Laws book verbatim (snippet verified 2026-10-09): renewal 'not to exceed one hundred twenty-five dollars ($125.00) for an unlimited license, one hundred dollars …'. The exact amount CHARGED per limitation is not published on any page read — only the caps are seeded (research §O withheld).
$125S-NC-LBGC-LAWS
Plumbing/heating/fuel-piping contractor licence — annual
21 NCAC 50 .1102 (Cornell LII mirror, host disclosed; amended eff. 2020-07-01, machine-read 2026-10-09): $150 annual plumbing/heating/fuel-piping contractor licence, also new or renewed. Expiry December 31 each year.
$150S-NC-PHFS-1102
Examination application fee — RULE .1101 figure ($25 application + $75 examination)
21 NCAC 50 .1101(c) verbatim (Cornell LII mirror, host disclosed; amended eff. 2023-03-01, machine-read 2026-10-09): 'requires a fee of one hundred dollars ($100.00), consisting of an application fee of twenty-five dollars ($25.00) and an examination fee of seventy-five dollars ($75.00), which is nonrefundable'. CONFLICT-NC-002: the board's FAQ says $150.00 — both official figures are seeded.
$100S-NC-PHFS-1101

Municipal permit fees are LOCAL_AUTHORITY_REQUIRED and are not published here.