States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
All states →
Projects
152 project guides — open the list

Washington Contractor Registration Requirements

How contractor licensing actually works in Washington: a registration state, not a licence state. Every construction contractor must register with the Department of Labor & Industries under ch. 18.27 RCW — there is no examination, and the registration is backed by a $30,000 general / $15,000 specialty continuous surety bond, general-liability and workers'-compensation conditions. Layered over it are two separate trade-credential regimes: electrical (ch. 19.28 RCW) and plumbing (ch. 18.106 RCW), each with its own contractor licence, individual certificates, bonds and continuing education. Every claim below is traced to an official source with a verification date.

Verified 2026-10-0440 official sources39 requirements78 classifications3 documented conflictsIndexation gate: passed

01 The Washington model

Washington is not California, Florida, Arizona, Texas, Georgia, Nevada or Colorado. It is a registration jurisdiction: the state registers construction contractors to do business — it does not test them — and then regulates two trades on entirely separate statutory tracks:

REGISTRATION (ch. 18.27, no exam)+ELECTRICAL (ch. 19.28)+PLUMBING (ch. 18.106)≠LOCAL PERMITS (per job)
  • Every contractor must register — and it is NOT a licence — RCW 18.27.020 requires every contractor to register with L&I before advertising, bidding or working; unregistered work is a gross misdemeanor plus per-day and per-worksite infractions ($1,200–$10,000). The statute deliberately uses "registration", never licence. (Rule WA-REG-REQUIRED.) S-WA-18-27-020
  • No examination anywhere in the registration — a full read of the ch. 18.27 table of contents and the L&I registration steps shows no examination provision; a general or specialty contractor registers on bond, insurance, workers' compensation and business identity alone. (Rule WA-NO-EXAM.) S-WA-18-27-TOC
  • General vs specialty is decided by trade count — a "general" contractor works in more than one building trade or craft on a single job or permit, or superintends/consults; a "specialty" contractor works in one. The bond follows: $30,000 general, $15,000 specialty. (Rules WA-GC-SCOPE, WA-GC-BOND.) S-WA-18-27-010
  • Two trades live outside the registration — electrical (ch. 19.28) and plumbing (ch. 18.106) each require their own contractor licence and certified individuals; since 2021-07-01 a general contractor cannot even bid plumbing work. (Rules WA-ELEC-CONTRACTOR, WA-PLUMB-CONTRACTOR, WA-GC-NO-PLUMBING.) S-WA-LNI-PLUMB-CONTRACTOR
  • LOCAL permits are a separate system — RCW 18.27.130 preempts LOCAL contractor licences (with carve-outs for a general business licence and non-registrable contractors), but a city or county still issues the permit for the job and RCW 18.27.110 makes it verify your registration first. (Rule WA-NO-LOCAL-LICENSE.) S-WA-18-27-130
What this site does not claim

We do not publish a statewide electrical work-permit fee schedule, local permit fee amounts or city business-licence fees — each is named as NOT_VERIFIED or LOCAL_AUTHORITY_REQUIRED, never estimated. CONFLICT-WA-001 (plumbing renewal amounts), CONFLICT-WA-002 (electrical-only registration) and CONFLICT-WA-003 (the printed plumbing specialty) are unresolved and every side is shown below.

02 Who regulates

legislature
Washington State Legislature — RCW & WAC (app.leg.wa.gov)

The OFFICIAL host of the Revised Code of Washington and the Washington Administrative Code. Every RCW/WAC citation in this seed was read on app.leg.wa.gov on 2026-10-04 with HTTP 200 — no mirror was needed (unlike Phase 10 Colorado). Primary authority for the whole Washington model: ch. 18.27 RCW (registration), ch. 19.28 RCW (electrical), ch. 18.106 RCW (plumbing), ch. 296-200A / 296-46B / 296-400A WAC (the three program rule sets).

https://app.leg.wa.gov/
state agency
Washington Department of Revenue — Business Licensing Service (UBI)

Issues the Washington business license and the Uniform Business Identifier (UBI) — the business-registration layer that sits UNDER contractor registration ('When you receive your business license, you'll be assigned a Unified Business Identifier (UBI) number' — Apply for a business license, read 2026-10-04). Registration is required when, e.g., the business needs city/county/state endorsements, trades under a name other than the legal name, will hire employees within 90 days, collects sales tax, or has gross income of $12,000/year or more. Domestic corporations, partnerships, LLCs and LLPs must file with the Secretary of State BEFORE filing the Business License Application. DOR BLS also administers many CITY business licenses as endorsements on the same UBI (Vancouver: 'A business's state-issued Unified Business Identifier (UBI) is used to reference both its state business and its city business license' — read). An active DOR certificate of registration is an express DENIAL ground for contractor registration (RCW 18.27.030).

https://dor.wa.gov/
city
City of Spokane (municipal code & permit center)

LOCAL EXAMPLE — Spokane's permit-eligibility rule (research §M.2). SMC 17G.010.070: to be eligible for building permits one must be a contractor with a City of Spokane business license AND an active L&I contractor credential. FETCH LIMITATION: my.spokanecity.org returns a 302 self-redirect loop and static.spokanecity.org returns 403 to scripted fetches on 2026-10-04 — the SMC text was captured from the official domain's search-result snippet and is marked pending_verification at each citation (research header).

https://www.spokanecity.org/
city
City of Tacoma — Planning and Development Services

LOCAL EXAMPLE — Tacoma's credential + permit rules (research §M.3). Verbatim FAQ on tacoma.gov (read 2026-10-04): 'Yes, to do work in the City of Tacoma both a City business license and Washington State contractor's license are required.' 'Plumbing permits are required for all plumbing work including water service, drains, water mains, sewage disposal systems and related fixtures and appliances.' E-permits via Accela include Residential Roof Overlay and Commercial Strip and Re-roof; some permits require a bond before approval. (tacomapermits.org returns 403 to scripted fetches — the FAQ content was read on the official tacoma.gov domain instead.)

https://tacoma.gov/government/departments/planning-and-development-services/
city
City of Bellevue — Development Services

LOCAL EXAMPLE — Bellevue's state-first credential rule (research §M.5). Official FAQ (read 2026-10-04): 'Under state law, the City of Bellevue is obligated to provide written notification to all homeowners regarding the contractor registration requirements set forth in the Revised Codes of Washington (RCW), Chapter 18.27 … Any contractor conducting business in the city must be licensed by the State of Washington Department of Labor and Industries.' Construction permits require the Washington State contractor credential and a Bellevue business license before issuance (Permit Process Overview — official-domain snippet, pending_verification). No city contractor license exists (preemption, RCW 18.27.130).

https://bellevuewa.gov/
city
City of Vancouver (Washington)

LOCAL EXAMPLE — Vancouver's business-license + permit model (research §M.4). City business license ('endorsement') required if the business is physically located in city limits or its staff engage in business in city limits (incl. remote workers); administered THROUGH the WA DOR Business Licensing Service on the same UBI; fee exemptions at ≤$4,000 in-city gross (all city fees) and $4,000–$53,000 (city employee fee) (VMC Title 5; page read 2026-10-04). 'Residential Building Permits (RES) are required for the construction, alteration, addition, repair, or demolition of residential buildings and structures.' Home-based contractors may need a Home Occupation Permit (VMC 20.860).

https://www.cityofvancouver.us/
state agency
Washington State Department of Labor & Industries (L&I)

The single agency behind EVERY Washington construction credential layer researched here: Contractor Registration (ch. 18.27 RCW / ch. 296-200A WAC, 'Construction Contractors Must Be Registered … State law also requires construction contractors to be bonded and insured to protect the public' — Register page, read 2026-10-04), the Electrical Program (ch. 19.28 RCW / ch. 296-46B WAC; ElectricalProgram@Lni.wa.gov, 360-902-5269), Plumber Certification (ch. 18.106 RCW / ch. 296-400A WAC; Plumbers@Lni.wa.gov, 360-902-5207), elevator and other trade programs, and the workers' compensation STATE FUND ('Washington State does not allow private workers' compensation coverage. You must purchase your coverage from L&I or be a certified self-insured employer' — Do I Need a Workers' Comp Account?, read). Contractor Registration program: ContReg@Lni.wa.gov, 360-902-5226 option 2, toll-free 1-800-647-0982. Homeowner Recovery Fund: HRF@Lni.wa.gov, 360-902-5699. Official lookup = the Verify a Contractor, Tradesperson, or Business tool (lookupUrl; also secure.lni.wa.gov/verify/). Fees are set by rule (RCW 18.27.070/.075) and were raised effective 2026-07-01 by WSR 26-10-060 Order 25-30 (research §L).

https://www.lni.wa.gov/https://lni.wa.gov/licensing-permits/contractors/hiring-a-contractor/verify-contractor-tradesperson-business
city
City of Seattle — Seattle Department of Construction and Inspections (SDCI)

LOCAL EXAMPLE — Seattle's permit authority (research §M.1). Issues building, re-roof, mechanical, plumbing and (under the RCW 19.28.141 local-enforcement option) ELECTRICAL permits, and performs electrical inspections in-house ('Most permits require three electrical inspections: cover, service, and final' — Electrical Permit page, read 2026-10-04). Seattle does NOT license contractors (preempted by RCW 18.27.130) — permits require the STATE credential plus a Seattle business license. Notable verbatim thresholds: no permit for minor repairs/alterations ≤$6,000 in any 6-month period; re-roof exemption for 1- and two-family homes/townhouses when no envelope change; small solar PV <7.7 kW online without plan review.

https://www.seattle.gov/construction-and-inspections/https://cosaccela.seattle.gov/

The Department of Labor & Industries administers BOTH the contractor registration (ch. 18.27) and the electrical (ch. 19.28) and plumbing (ch. 18.106) credential programmes; the Washington Legislature publishes the RCW; the Department of Revenue issues the business licence and unified business identifier (UBI); and Seattle, Spokane, Tacoma, Vancouver and Bellevue document the local permit layer. All are official sources here; Spokane is recorded through search-result snippets with a disclosed limitation.

03 State vs local

Washington is not Colorado's "no state licence at all" model and not a state-plus-locals additive model. The state registers contractors and preempts local contractor licences; cities keep their permits and their general business licences:

QuestionState answerLocal answer
Contractor credentialRegistration under ch. 18.27 — one statewide credential, general or specialty (rule WA-REG-REQUIRED). S-WA-18-27-020None — RCW 18.27.130 bars a local contractor licence (rule WA-NO-LOCAL-LICENSE). A city may still require a general business licence. S-WA-18-27-130
Electrical / plumbingSeparate state contractor licences with certified individuals (ch. 19.28 / ch. 18.106). S-WA-LNI-ELEC-CONTRACTORLocal electrical/mechanical permits and inspections on top; the state credential is still the trade authority.
Building / trade permitA state credential is a precondition: RCW 18.27.110 makes the local permit issuer verify the registration before issuing (rule WA-PERMIT-VERIFY). S-WA-18-27-110The city/county owns the permit and the inspection — re-roof rules, mechanical permits and plan review vary by jurisdiction (five researched rows below).
Local business licenceDOR business licence + UBI is a state requirement (rule WA-BUSINESS-UBI). S-WA-DOR-BIZCities issue general business licences and right-of-way permits independent of the state registration.
What this site does not claim

Permit fee schedules, plan-review timelines and every jurisdiction beyond the five researched rows are LOCAL_AUTHORITY_REQUIRED. A city general business licence is not a contractor licence — RCW 18.27.130 says so.

04 Registration vs licence

The terminology is the point. Washington's ch. 18.27 credential is a registration — a business-authorisation regime keyed to a bond and insurance, not a tested licence. The word "licence" in Washington belongs to electrical and plumbing:

Construction contractor
REGISTERED
ch. 18.27 RCW — no exam, bond + GL + WC conditioned S-WA-18-27-020
Electrical contractor
LICENSED
ch. 19.28 RCW — $4,000 bond + designated certified master/administrator S-WA-LNI-ELEC-CONTRACTOR
Plumbing contractor
LICENSED
ch. 18.106 RCW — $6,000 bond + full-time certified plumber designated S-WA-LNI-PLUMB-CONTRACTOR
  • Registration is a prerequisite to sue — RCW 18.27.080 bars a contractor who was unregistered when contracted from maintaining an action; substantial compliance demands the application information, the bond and the insurance in force AT ALL TIMES. (Rule WA-REG-TO-SUE.) S-WA-18-27-080
  • Advertising carries the registration number — RCW 18.27.100 requires the current number on advertising, contracts and correspondence and forbids claiming to be "bonded and insured"; violations reach $10,000. (Rule WA-AD-NUMBER.) S-WA-18-27-100
  • Specialty contractors are constrained by trade — a specialty contractor may only do its registered specialty, may subcontract only work incidental to it, and may not itself hire subcontractors. (Rule WA-SC-LIMITS.) S-WA-18-27-010
  • An electrical-only business is a known open question — L&I's registration page says "all construction contractors" must register while its electrical page frames registration as additionally required "if other work" — an unresolved conflict shown in full below (CONFLICT-WA-002). (Rule WA-ELEC-ONLY-REG, NOT_DETERMINED.) S-WA-LNI-ELEC-CONTRACTOR

05 Credential model

Washington issues 6 credential shapes across the registration and the two trade regimes. The split matters: a registration lets a construction business operate; a trade licence lets an electrical or plumbing business operate; a trade certificate lets an individual work at the trade:

Credential
Contractor Registration (business — ch. 18.27 RCW; 'Every contractor shall register with the department' — RCW 18.27.020; general or specialty class; $30,000/$15,000 bond + general liability + DOR registration; NO examination — verified absence)
contractor_registration
Credential
Electrical / Telecommunications Contractor License (business — ch. 19.28 RCW; 'To engage in the business of the electrical construction trade, you must get an electrical contractor license from L&I'; general (01) or WAC 296-46B-920(2) specialty; $4,000 bond; designated certified master/administrator; 24 months)
electrical_contractor_license
Credential
Plumbing Contractor License (business — ch. 18.106 RCW; all plumbing contract work since 2021-07-01 must be performed by a licensed plumbing contractor; $6,000 bond + $50k/$100k/$200k insurance; full-time designated ('dedicated') certified plumber; 24 months; NOT required to hold ch. 18.27 registration for plumbing work — RCW 18.106.400(3))
plumbing_contractor_license
Credential
Electrician Certificate (individual — L&I; 'To work in the electrical construction trade in Washington, you must have a valid electrician certificate issued by L&I'; trainee, general journey level (01), 14 specialty categories, master, administrator; 3-year birthday renewal with 24 h CE)
electrician_certificate
Credential
Plumber Certificate (individual — L&I Plumber Certification; journey level PL01, residential PL02, residential service PL04, pump & irrigation PL03, domestic well PL03A, backflow PL30, medical gas MG01, trainee; 3-year birthday renewal with 24 h CE, trainee annually)
plumber_certificate
Credential
Business Registration / UBI (DOR Business Licensing Service — the layer UNDER contractor registration: 'When you receive your business license, you'll be assigned a Unified Business Identifier (UBI) number'; active DOR registration is an express denial ground for contractor registration per RCW 18.27.030; SOS filing first for corporations/LLCs/partnerships/LLPs)
business_registration
  • Registration for the business, certificates for the workers — the contractor registration is a business credential; electricians (01 journey, 02 residential, specialty, trainee) and plumbers (PL01 journey, PL02 residential, PL04 residential service, trainee, specialty) hold individual certificates. (Rules WA-ELEC-WORKER, WA-PLUMB-WORKER.) S-WA-LNI-ELECTRICIAN S-WA-18-106-020
  • Each trade business names a certified individual — an electrical contractor must designate a certified master electrician or electrical administrator; a plumbing contractor must designate a full-time certified plumber. (Rules WA-ELEC-CONTRACTOR, WA-PLUMB-CONTRACTOR.) S-WA-LNI-ELEC-CONTRACTOR
  • Business identity rides on DOR and SOS — a DOR business licence / UBI is required and an entity files with the Secretary of State; an inactive DOR certificate or invalid UBI is a denial ground. (Rule WA-BUSINESS-UBI.) S-WA-DOR-BIZ
  • Cross-trade incidents are narrowly excused — like-in-kind appliance replacement lets an electrical contractor's certified workers do the incidental plumbing, and vice versa (RCW 18.106.150(8) / 19.28.091(8)). (Rule WA-ELEC-PLUMB-INCIDENTAL.) S-WA-18-106-150

06 Classifications

These 78 rows are the complete STATE credential surface — the general/specialty registration classes, the WAC 296-200A-016 specialty list, and the electrical and plumbing credential stacks, each mapped to the credential that carries it. Local permit classes and city business licences are deliberately NOT seeded as state rows:

CodeCredentialClassificationSource
SPECIALTY-HVAC-Rcontractor registrationHeating, Ventilation, Air-Conditioning and Refrigeration (HVAC/R) (specialty)S-WA-WAC-296-200A-016
SPECIALTY-METAL-FABRICATION-SHEET-METALcontractor registrationMetal Fabrication/Sheet Metal (specialty)S-WA-WAC-296-200A-016
SPECIALTY-APPLIANCES-EQUIPMENTcontractor registrationAppliances, Equipment (specialty)S-WA-WAC-296-200A-016
SPECIALTY-AWNINGS-CANOPIEScontractor registrationAwnings, Canopies, Patio Covers and Exterior Screens (specialty)S-WA-WAC-296-200A-016
SPECIALTY-BOILER-STEAM-PROCESScontractor registrationBoiler, Steam Fitting, Process Piping (specialty)S-WA-WAC-296-200A-016
SPECIALTY-CABINETS-FINISH-CARPENTRYcontractor registrationCabinets, Millwork and Finish Carpentry (specialty)S-WA-WAC-296-200A-016
SPECIALTY-CENTRAL-VACUUMcontractor registrationCentral Vacuum Systems (specialty)S-WA-WAC-296-200A-016
SPECIALTY-CLOSETScontractor registrationClosets (specialty)S-WA-WAC-296-200A-016
SPECIALTY-COMMERCIAL-REFRIGERATIONcontractor registrationCommercial/Industrial Refrigeration (specialty)S-WA-WAC-296-200A-016
SPECIALTY-CONCRETEcontractor registrationConcrete (specialty)S-WA-WAC-296-200A-016
SPECIALTY-CONSTRUCTION-CLEAN-UPcontractor registrationConstruction Clean-up (specialty)S-WA-WAC-296-200A-016
SPECIALTY-DEMOLITIONS-SALVAGEcontractor registrationDemolitions and Salvage (specialty)S-WA-WAC-296-200A-016
SPECIALTY-DOORS-GATEScontractor registrationDoors, Gates and Activating Devices (specialty)S-WA-WAC-296-200A-016
SPECIALTY-ASBESTOS-LEADcontractor registrationAsbestos and Lead (specialty)S-WA-WAC-296-200A-016
SPECIALTY-DRILLING-BLASTINGcontractor registrationDrilling, Blasting and Soil Sampling (specialty)S-WA-WAC-296-200A-016
SPECIALTY-DRYWALLcontractor registrationDrywall (specialty)S-WA-WAC-296-200A-016
SPECIALTY-EXCAVATION-GRADINGcontractor registrationExcavation, Grading and Land Clearing (specialty)S-WA-WAC-296-200A-016
SPECIALTY-FENCINGcontractor registrationFencing (specialty)S-WA-WAC-296-200A-016
SPECIALTY-FIREPROOFING-COATINGcontractor registrationFireproofing and Coating (specialty)S-WA-WAC-296-200A-016
SPECIALTY-FIRE-PROTECTIONcontractor registrationFire Protection (specialty)S-WA-WAC-296-200A-016
SPECIALTY-FLOOR-COVERING-COUNTERTOPScontractor registrationFloor Covering and Counter Tops (specialty)S-WA-WAC-296-200A-016
SPECIALTY-FRAMING-ROUGH-CARPENTRYcontractor registrationFraming and Rough Carpentry (specialty)S-WA-WAC-296-200A-016
SPECIALTY-GLASS-GLAZINGcontractor registrationGlass and Glazing (specialty)S-WA-WAC-296-200A-016
SPECIALTY-GUTTERS-DOWNSPOUTScontractor registrationGutters and Downspouts (specialty)S-WA-WAC-296-200A-016
SPECIALTY-ELECTRICAL-XREFcontractor registrationElectrical (WAC cross-reference — NOT a registrable ch. 18.27 specialty)S-WA-WAC-296-200A-016
SPECIALTY-ELEVATORcontractor registrationElevator (specialty)S-WA-WAC-296-200A-016
SPECIALTY-HOUSE-MOVINGcontractor registrationHouse Moving (specialty)S-WA-WAC-296-200A-016
SPECIALTY-LATHING-PLASTERINGcontractor registrationLathing and Plastering (specialty)S-WA-WAC-296-200A-016
SPECIALTY-LOCKS-SECURITY-ALARMScontractor registrationLocks, Security Alarms and Warning Systems (specialty)S-WA-WAC-296-200A-016
SPECIALTY-MASONRYcontractor registrationMasonry (specialty)S-WA-WAC-296-200A-016
SPECIALTY-INDUSTRIAL-EQUIPMENTcontractor registrationIndustrial Equipment/Machines (specialty)S-WA-WAC-296-200A-016
SPECIALTY-INSTITUTIONAL-EQUIPMENTcontractor registrationInstitutional Equipment, Stationary Furniture, Lab Tables, Lockers (specialty)S-WA-WAC-296-200A-016
SPECIALTY-INSULATION-ACOUSTICALcontractor registrationInsulation and Acoustical (specialty)S-WA-WAC-296-200A-016
SPECIALTY-IRRIGATION-SPRINKLERcontractor registrationIrrigation Sprinkler Systems (specialty)S-WA-WAC-296-200A-016
SPECIALTY-LANDSCAPINGcontractor registrationLandscaping (specialty)S-WA-WAC-296-200A-016
SPECIALTY-PAINTING-WALL-COVERINGcontractor registrationPainting and Wall Covering (specialty)S-WA-WAC-296-200A-016
SPECIALTY-PRESSURE-WASHINGcontractor registrationPressure Washing (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SERVICE-STATION-EQUIPMENTcontractor registrationService Station Equipment and Maintenance (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SIDINGcontractor registrationSiding (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SIGNScontractor registrationSigns (specialty)S-WA-WAC-296-200A-016
SPECIALTY-STEEL-ERECTORScontractor registrationSteel Erectors (specialty)S-WA-WAC-296-200A-016
SPECIALTY-STRUCTURAL-PEST-CONTROLcontractor registrationStructural Pest Control (specialty)S-WA-WAC-296-200A-016
SPECIALTY-PAVING-STRIPINGcontractor registrationPaving/Striping/Seal Coating (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SANDBLASTINGcontractor registrationSandblasting (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SANITATION-SIDE-SEWERScontractor registrationSanitation Systems and/or Side Sewers (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SCAFFOLDING-RAILINGScontractor registrationScaffolding and Safety Railings (specialty)S-WA-WAC-296-200A-016
SPECIALTY-POOLS-SPAS-HOT-TUBScontractor registrationSwimming Pools, Spas and Hot Tubs (specialty)S-WA-WAC-296-200A-016
SPECIALTY-TILE-CERAMIC-STONEcontractor registrationTile, Ceramic, Mosaic and Natural/Manufactured Stone (specialty)S-WA-WAC-296-200A-016
SPECIALTY-WINDOW-COVERINGScontractor registrationWindow Coverings (specialty)S-WA-WAC-296-200A-016
SPECIALTY-WATER-CONDITIONINGcontractor registrationWater Conditioning Equipment (specialty)S-WA-WAC-296-200A-016
SPECIALTY-WELDING-ORNAMENTAL-METALcontractor registrationWelding and Ornamental Metal (specialty)S-WA-WAC-296-200A-016
SPECIALTY-WELL-DRILLINGcontractor registrationWell Drilling (specialty)S-WA-WAC-296-200A-016
SPECIALTY-WOOD-PELLET-GAS-STOVEcontractor registrationWood/Pellet and Gas Stove (specialty)S-WA-WAC-296-200A-016
ELECTRICAL-CONTRACTOR-SPECIALTYelectrical contractor licenseSpecialty Electrical Contractor License (business)S-WA-LNI-ELEC-CONTRACTOR
SPECIALTY-TANKS-TANK-REMOVALcontractor registrationTanks and Tank Removal (specialty)S-WA-WAC-296-200A-016
SPECIALTY-TREE-REMOVALcontractor registrationTree Removal (specialty)S-WA-WAC-296-200A-016
SPECIALTY-UTILITIES-TELECOMMUNICATIONScontractor registrationUtilities and Telecommunications (specialty)S-WA-WAC-296-200A-016
SPECIALTY-PLUMBING-PHASEOUTcontractor registrationPlumbing (WAC definition — specialty registration PHASED OUT since 2021-07-01)S-WA-LNI-PLUMB-CONTRACTOR
ELECTRICIAN-JOURNEY-01electrician certificateGeneral Journey Level Electrician (01) (individual certificate)S-WA-LNI-ELECTRICIAN
ELECTRICAL-TRAINEEelectrician certificateElectrical Trainee (individual certificate)S-WA-LNI-ELECTRICIAN
ELECTRICAL-ADMINISTRATOR-MASTERelectrician certificateElectrical Administrator / Master Electrician (individual certificate — the designated qualifying individual)S-WA-LNI-ELEC-CONTRACTOR
PLUMBER-RESIDENTIAL-PL02plumber certificateResidential Plumber (PL02) (individual certificate)S-WA-LNI-PLUMBER-CERT
PLUMBER-TRAINEEplumber certificatePlumber Trainee (individual certificate)S-WA-LNI-PLUMBER-CERT
SPECIALTY-ROOFINGcontractor registrationRoofing (specialty)S-WA-WAC-296-200A-016
ELECTRICAL-CONTRACTOR-GENERAL-01electrical contractor licenseGeneral Electrical Contractor License (01) (business)S-WA-WAC-296-46B-920
SPECIALTY-DRAIN-CLEANINGcontractor registrationDrain Cleaning and Snaking (specialty)S-WA-WAC-296-200A-016
ELECTRICIAN-SPECIALTYelectrician certificateSpecialty Electrician (individual certificate — 14 specialty categories)S-WA-LNI-ELECTRICIAN
GENERAL-CONTRACTORcontractor registrationGeneral Contractor (ch. 18.27 registration class)S-WA-18-27-010
SPECIALTY-CONTRACTORcontractor registrationSpecialty Contractor (ch. 18.27 registration class)S-WA-18-27-010
SPECIALTY-MANUFACTURED-HOME-SETUPcontractor registrationManufactured/Mobile Home Set Up (specialty)S-WA-WAC-296-200A-016
SPECIALTY-SUSPENDED-CEILINGScontractor registrationSuspended Ceilings and Acoustical Tile (specialty)S-WA-WAC-296-200A-016
SPECIALTY-OVERHEAD-GARAGE-DOORScontractor registrationOverhead/Garage Doors (specialty)S-WA-WAC-296-200A-016
PLUMBER-JOURNEY-LEVEL-PL01plumber certificateJourney Level Plumber (PL01) (individual certificate)S-WA-LNI-PLUMBER-CERT
PLUMBER-RESIDENTIAL-SERVICE-PL04plumber certificateResidential Service Plumber (PL04) (individual certificate)S-WA-LNI-PLUMBER-CERT
PLUMBER-SPECIALTY-CERTIFICATESplumber certificateSpecialty Plumber Certificates — PL03 / PL03A / PL30 / MG01 (individual)S-WA-LNI-PLUMBER-CERT
SPECIALTY-HANDYMANcontractor registrationHandyman (specialty)S-WA-WAC-296-200A-016
ELECTRICAL-RESIDENTIAL-02electrical contractor licenseResidential (02) Electrical Specialty (license/certificate scope)S-WA-WAC-296-46B-920
PLUMBING-CONTRACTORplumbing contractor licensePlumbing Contractor License (business)S-WA-LNI-PLUMB-CONTRACTOR

Full classification scopes, conditions and rules →

07 Exemptions and thresholds

Washington has real, statutory money thresholds — the feature Colorado does not have. Three bands decide most small jobs, and none of them is a generic loophole:

$500 band
exempt
aggregate <$500 casual/minor work, unless part of a larger operation, split to evade, or advertised as a contractor (RCW 18.27.090(9)) S-WA-18-27-090
$2,000 handyman band
specialty registration
individual, no employees, residential maintenance/repair <$2,000 T&M, NO permit work (WAC 296-200A-016(26)) S-WA-WAC-296-200A-016
Elsewhere
full registration
every other construction job needs the ch. 18.27 registration S-WA-18-27-020
  • Under $500 — exempt, with carve-backs — RCW 18.27.090(9) exempts casual or minor work under $500 in the aggregate, but not when it is part of a larger operation, split to evade the threshold, or when the person holds out as a contractor. (Rule WA-MINOR-500.) S-WA-18-27-090
  • Handyman — a $2,000 registered specialty, no permit work — WAC 296-200A-016(26) defines a limited specialty registration for an individual (no employees) doing residential maintenance/repair under $2,000 time-and-materials; permit-required work is OUT. (Rule WA-HANDYMAN-2K.) S-WA-WAC-296-200A-016
  • Own-property and homeowner paths — RCW 18.27.090(11)–(13) exempt an owner working on their own property, owner maintenance/repairs and own employees, and an owner hiring a registered contractor; but an owner employing more than one trade on one job or permit IS a contractor. (Rule WA-OWN-PROPERTY.) S-WA-18-27-090
  • Disclosure is not an exemption but it gates the small job — RCW 18.27.114 requires the NOTICE TO CUSTOMER on residential ≤4-unit jobs of $1,000 or more (commercial $1,000–$60,000), and it is a prerequisite to a lien. (Rule WA-DISCLOSURE-1K.) S-WA-18-27-114

08 Bonds

Washington is a BOND state — a surety bond is a standing condition of every credential, and impairment auto-suspends it. Four verified rows:

BondAmountNotesSource
BOND-WA-PLUMBING$6,000L&I (read): 'A Washington Continuous Plumbing Contractor Surety Bond in the amount of $6,000.' A plumbing contractor who ALSO holds GC registration files this $6,000 bond PLUS the $30,000 registration bond (research §H/§9).S-WA-18-106-410
BOND-WA-REG-SPECIALTY$15,000The specialty amount ($15,000) — including the handyman specialty (a registration!). Same automatic-suspension and ½-bond claim cap ($7,500 non-homeowner) structure (research §H).S-WA-18-27-040
BOND-WA-ELECTRICAL$4,000Separate bond from the ch. 18.27 registration bond — a business holding BOTH credentials files BOTH bonds (research §H/§8). Cash deposit alternative exists (RCW 19.28.041).S-WA-19-28-041
BOND-WA-REG-GENERAL$30,000Raised from $12,000 effective 2024-07-01 (L&I news 24-13); renewals dated on/after that date must file the new amount (L&I). Cancellation/withdrawal/unsatisfied judgment AUTOMATICALLY suspends the registration until a new bond is approved; claims ladder labor → contract breach → subs/materials → taxes → costs; non-homeowner claims capped at ½ bond ($15,000); residential homeowner suit within 2 years of substantial completion, others 1 year; a general→specialty switch may NOT reduce the bond for 2 years (L&I).S-WA-18-27-040
  • Registration bond — $30,000 general / $15,000 specialty — a continuous surety bond (or a WA-branch assigned account), impaired bonds auto-suspend the registration. (Rule WA-GC-BOND.) S-WA-18-27-010
  • Electrical contractor bond — $4,000 — a condition of the ch. 19.28 electrical contractor licence. S-WA-LNI-ELEC-CONTRACTOR
  • Plumbing contractor bond — $6,000 — a condition of the ch. 18.106 plumbing contractor licence. S-WA-LNI-PLUMB-CONTRACTOR

09 Insurance and financial responsibility

Washington conditions its credentials on general liability AND workers' compensation — and workers' compensation is a monopolistic state fund, not private coverage:

CoverageStatusApplies when / amountSource
CGLrequired by lawevery contractor registration at issuance AND every renewal — insurance or assigned account: $50,000 PD + $100,000 one person + $200,000 more than one person (RCW 18.27.050)
accepted policy forms (L&I): '$200,000 in public liability and $50,000 property damage, or $250,000 combined single limit'; renewal certificate 'at least $250,000'; F625 form: PD $50,000 + BI $200,000 = total per occurrence $250,000
Split limits vs CSL RECONCILED arithmetically ($50k + $200k = $250k) — both phrasings published, not seeded as a conflict (research §I quality gate). Impairment → automatic registration suspension (RCW 18.27.060(3)).
S-WA-18-27-050
CGLrequired by lawevery plumbing contractor license at issuance AND renewal — same split limits ($50k PD / $100k one / $200k more than one, RCW 18.106.420); L&I renewal certificate 'for at least $250,000'
assigned-account alternative carries a counterparty-notice duty: recovery from the account requires a court judgment (RCW 18.106.420(3)(c))
Same shape as the registration GL — a plumbing contractor holding BOTH credentials files both proofs (research §I/§9). Auto-suspension on expiration/cancellation/revocation/insurer withdrawal.
S-WA-18-106-420
CGLnot requiredelectrical contractor license itself — 'Electrical contractors are encouraged to carry general liability insurance. However, L&I does not keep records of liability insurance for electrical contractors' (L&I, verbatim)
NOT required for the electrical license — but an electrical business that must hold ch. 18.27 registration (CONFLICT-WA-002) needs the $250k-form GL THERE; this row answers only the electrical-license question
requiredKind 'not_required' with confidence 'conflicting' is deliberate: the L&I statement is confirmed, but the registration-side requirement (if registration applies) makes the OVERALL answer location/structure-dependent — CONFLICT-WA-002's shadow (research §I).
S-WA-LNI-ELEC-CONTRACTOR
WCrequired by lawany business with workers (employees or independent contractors per L&I's caution) — coverage only from the L&I State Fund or as a certified self-insured employer; the industrial insurance account number (or self-insurer number / out-of-state certificate) is an application item for all three business credentials
'Washington State does not allow private workers' compensation coverage' (L&I verbatim) — a monopolistic state fund, unlike every other researched state (research §I). Owner optional-coverage specifics NOT_VERIFIED.
S-WA-LNI-WC

General liability: RCW 18.27.050 (read 2026-10-04): at registration and each renewal furnish insurance or an assigned account of $50,000 property damage, $100,000 injury/death one person, $200,000 injury/death more than one person; expiration/cancellation/withdrawal automatically suspends the registration until a new policy is approved. L&I states the accepted policy forms: 'A general liability insurance policy in the amount of: $200,000 in public liability and $50,000 property damage, or $250,000 combined single limit' (renewal certificate 'for at least $250,000'). F625-001-000 shows PD $50,000 + BI $200,000 = 'total per occurrence $250,000.' RECONCILED: $50k + $200k = $250k — the statute's split limits and L&I's CSL phrasing express the same coverage (research §I). S-WA-18-27-050

Workers' compensation: L&I (read verbatim 2026-10-04): 'Washington State does not allow private workers' compensation coverage. You must purchase your coverage from L&I or be a certified self-insured employer.' 'If you have workers, whether they are employees or independent contractors, you might be required to provide workers' compensation.' Employers buy through L&I and submit quarterly reports/premiums by industry classification. The industrial insurance account number (or self-insurer number, or out-of-state certificate) is an express application item for contractor registration (RCW 18.27.030), plumbing contractor licensing (RCW 18.106.400) and electrical contractor licensing ('A workers' compensation account if the business hire employees' — L&I Electrical Contractor page). S-WA-LNI-WC

10 Renewal and continuing education

Two cadences: the registration runs a 24-month cycle with NO continuing education (verified absence — bonds and insurance are the conditions), while the trade certificates carry a 3-year cycle with continuing education:

Credential
Electrical contractor licence
24-month cycle
Expiry / late / reinstatement
24 CALENDAR months (RCW 19.28.041). Renewal requires: bond current, designated administrator/master assigned, no unpaid citations (L&I Electrical Contractor page). >90 days expired → CANNOT renew online (documents + reinstatement fee $71.50 instead); suspension whenever any requirement lapses.
Continuing education
No CE condition on the business license itself — the designated individual's certificate (master/administrator) carries its own 3-year 24 h CE (research §J/§K).
Bond ($4,000, one maximum across specialties) must remain in force through renewal; GL is NOT kept by L&I for electrical licenses (research §I.3).
Credential
Plumbing contractor licence
24-month cycle
Expiry / late / reinstatement
Expires 24 calendar months from issuance (RCW 18.106.400). Renewal fee WAC $148.10 (encoded) — CONFLICT-WA-001 (OPEN): L&I page shows $139.10; reinstatement WAC $74.00 vs L&I $69.50 — both preserved beside the encoded amounts. Renewal needs bond ($6,000) + GL (≥$250,000 certificate) current and the designated full-time certified plumber still in place (L&I).
Continuing education
No CE condition on the license itself — CE attaches to the designated plumber's CERTIFICATE (24 h / 3 years: min 12 h Uniform Plumbing Code + 4 h Industry-Related Electrical, L&I Plumbing CE page) (research §J).
Business license, not a registration — and expressly NOT required to hold ch. 18.27 registration for plumbing work (RCW 18.106.400(3)) (research §B/§J).
Credential
Electrician certificate (01 / 02 / trainee)
36-month cycle
Expiry / late / reinstatement
Renews every 3 YEARS on your birthday (L&I Electrician page verbatim). Late renewal fee DOUBLES (e.g. journey $106.40 → $212.90; online $92.60 → $185.30 per WAC 296-46B-909). >90 days expired → RETEST ONLY to return (no late-renewal path). Inactive status available while not working.
Continuing education
24 hours CE per 3-year cycle — minimum 8 hours code update + 4 hours RCW/WAC (L&I Electrician page verbatim, read 2026-10-04). Exams via PSI after L&I approval; Oregon reciprocity for journey level (01).
Individual worker credential — never collapsed with the electrical CONTRACTOR license renewal (research §D.3/§J).
Credential
Contractor registration (general / specialty)
24-month cycle
Expiry / late / reinstatement
Certificate valid TWO years; renewal 'valid on the date L&I receives the required fee AND proof of bond and liability insurance' (RCW 18.27.060(4) verbatim; receipt/delivery proof serves until verification). Lapse ≤30 days with bond + insurance maintained is NOT 'unregistered' (RCW 18.27.010(15)); reinstatement fee $70.90 (WAC 296-200A-900) with certified suspension notice within 2 days; bond or insurance impairment = AUTOMATIC suspension with tracked notice (2026 c 77 adds an electronic option with first-use non-electronic opt-out, RCW 18.27.060(3)).
Continuing education
NO continuing education for contractor registration — verified absence (complete ch. 18.27 section list read 2026-10-04; L&I renewal steps list none; no exam either — REQ-WA-NO-CE-REGISTRATION-001 / REQ-WA-NO-EXAM-001).
The registration renewal keeps bond ($30k/$15k) + GL ($250k-form) proofs live every cycle (research §J).
Credential
Plumber certificate (PL01 / PL02 / PL04 / trainee)
36-month cycle
Expiry / late / reinstatement
'Your plumber certification renews on your birthdate every 3 years for journey level, residential, residential service, backflow, and domestic pump and pump and irrigation plumbers' (L&I verbatim). Initial certification good 25–37 months. Late: fee DOUBLES ($242.70 + $242.70 = $485.40 journey/residential); >90 days expired → retest $189.80 + certification fee; CE must be on file for online renewal, no unpaid infractions.
Continuing education
24 hours per 3-year cycle — journey/residential/residential service: minimum 12 h Uniform Plumbing Code + minimum 4 h Industry-Related Electrical, remaining 8 h Code/IRE/IRP (effective 2021-07-01). Trainees: ≥8 h plumbing code + 4 h electrical per two-year period AND ≥8 h CE every year. Backflow: no CE (current WA DOH BAT card instead). Medical gas: notarized continuity affidavit ~ every 6 months. No repeat courses within a renewal period (WAC 296-400A-028) (L&I Plumbing CE page, read 2026-10-04).
Trainee certificates renew ANNUALLY ($60.00) inside the same credential family — the 36-month cycle covers the certified levels (research §J/§D.4).

RCW 18.27.060 (read 2026-10-04): '(1) A certificate of registration shall be valid for two years and shall be renewed on or before the expiration date.' '(4) Renewal of registration is valid on the date the department receives the required fee and proof of bond and liability insurance …' (receipt/delivery proof serves until verification arrives). '(3)' bond/insurance impairment = automatic suspension with tracked notice within 2 days (2026 c 77 added a tracked electronic option with first-use non-electronic opt-out). L&I: renew online/mail/in person with 12-digit number + UBI + $150.20; reinstatement $70.90 with proof of correction; suspension notice by certified mail within 2 days. RCW 18.27.010(15): a lapse of 30 or fewer days with bond+insurance maintained is NOT an 'unregistered contractor.' S-WA-18-27-060

Registration carries no CE — verified absence

Verified by reading RCW 18.27.060/.070/.075 and the L&I renewal steps (all read 2026-10-04): none contains any continuing-education condition; L&I's renewal checklist is bond + insurance + fee + not-suspended only. The electrical and plumbing CONTRACTOR licenses likewise carry no business-level CE — the CE burden sits on the designated individuals (master/administrator certificate; designated plumber certificate) and the workers' certificates. S-WA-18-27-060

Individual CE: L&I Electrician (read verbatim 2026-10-04): renew every 3 years on your birthday with '24 hours of approved continuing education credit including 8 hours of code update, 4 hours of RCW/WAC'; renewal fee doubles after expiration; 'Not renewable if expired more than 90 days; retest is your only option'; inactive status available while not working. L&I Plumbing CE (read verbatim): journey level & residential specialty renewals require '24 hours of continuing education consisting of: A minimum of 12 hours of Uniform Plumbing Code (Code), PLUS A minimum of 4 hours of Industry-Related Electrical (IRE). The remaining 8 hours can be in any Code, IRE, or Industry-Related Plumbing (IRP) area'; trainees 'at least 8 hours of continuing education every year to renew your certificate'; domestic pump/pump & irrigation: 24 h per 3-year renewal period (≥12 h plumbing, ≤12 h electrical); backflow: BAT card only, no CE; medical gas: notarized Affidavit of Continuity ~every 6 months. Plumber late ladder: double fee at renewal, retest $189.80 + certification fee after 90 days. S-WA-LNI-PLUMB-CE

11 State fees

The 17 verified state fees — the registration, electrical and plumbing schedules, each read from an official source. Every city figure is deliberately withheld:

FeeAmountKindSource
Contractor registration — reinstatement
WAC 296-200A-900 verbatim ($70.90), corroborated by the L&I Register page. A lapse of ≤30 days with bond + insurance maintained does NOT make the contractor 'unregistered' (RCW 18.27.010(15)) — reinstatement applies beyond that / after suspension (research §L.1/§J).
$70.90renewalS-WA-WAC-296-200A-900
Contractor registration — duplicate certificate
WAC 296-200A-900 verbatim ($16.50). Ancillary schedule items read beside it: certified letter $33.80, service of process $66.20, refund service $33.00, copies $2.40/page (max $37), annual listing publication $214.70 — published on the fees page, not all seeded as rows (research §L.1).
$16.50miscellaneousS-WA-WAC-296-200A-900
Electrical contractor license (general or specialty) — issuance / renewal, 24 months, in person/mail/fax
WAC 296-46B-909 verbatim ($353.90), WSR 26-10-060 eff. 2026-07-01 (read 2026-10-04). ONE bond ($4,000) covers multiple specialty electrical licenses (RCW 19.28.041) — but each license carries its own fee (research §L.2).
$353.90licenseS-WA-WAC-296-46B-909
Electrical contractor license — online renewal (24 months)
WAC 296-46B-909 verbatim ($306.20 online renewal rate). >90 days expired → cannot renew online (L&I Electrical Contractor page) (research §L.2/§J).
$306.20renewalS-WA-WAC-296-46B-909
Electrical contractor license — reinstatement
WAC 296-46B-909 verbatim ($71.50); L&I Electrical Contractor page cites the same figure for reinstatement (read 2026-10-04) (research §L.2).
$71.50renewalS-WA-WAC-296-46B-909
Master electrician certificate — renewal
WAC 296-46B-909 verbatim ($202.20 master; $175.70 administrator; late rates $404.50/$351.40). Individual certificate renewal also requires the 24 h / 3-year CE (research §L.2/§K).
$202.20certificationS-WA-WAC-296-46B-909
Journey level electrician exam
WAC 296-46B-909 verbatim ($80.30 journey exam; master first attempt $106.70, master retest $125.00). Exams scheduled with PSI after L&I approval (research §K/§L.2).
$80.30miscellaneousS-WA-WAC-296-46B-909
Original electrician certificates (journey $114.60 / master $204.60 / administrator $160.00; trainee $56.00)
WAC 296-46B-909 verbatim — journey $114.60 (row amount), master $204.60, administrator $160.00, trainee $56.00 initial / $48.10 renewal. The row amount is the most common credential (journey); siblings published here (research §L.2).
$114.60certificationS-WA-WAC-296-46B-909
Designated plumber assignment (initial or change)
WAC 296-400A-045 verbatim ($53.20); the L&I Plumbing Licensing Requirements page publishes the same figure (both sides agree — no conflict) (research §L.3).
$53.20miscellaneousS-WA-WAC-296-400A-045
Plumbing contractor license — reinstatement
WAC 296-400A-045 verbatim ($74.00). CONFLICT-WA-001 (OPEN): L&I's page shows $69.50 (pre-increase figure) — preserved beside this row, never merged (research §L.3).
$74.00renewalS-WA-WAC-296-400A-045
Plumber exam application (journey / residential / residential service)
WAC 296-400A-045 verbatim ($202.10); corroborated by the L&I Get or Renew page (both sides agree). Medical gas exam application $74.30 (research §K/§L.3).
$202.10miscellaneousS-WA-WAC-296-400A-045
Plumber certificate — renewal or first card, journey/residential/residential service (3 years)
WAC 296-400A-045 verbatim ($242.70); L&I Get or Renew page corroborates and adds the LATE rule: the fee DOUBLES after expiration ($485.40 total), and >90 days expired → retest ($189.80) + certification fee (research §L.3/§J).
$242.70certificationS-WA-WAC-296-400A-045
Journey or specialty electrician certificate — renewal
WAC 296-46B-909 verbatim ($106.40 in person; $92.60 online). Renewal on your birthday every 3 years with 24 h CE (L&I Electrician page) (research §L.2/§J).
$106.40certificationS-WA-WAC-296-46B-909
Plumbing contractor license — issuance / renewal / reregistration (2 years)
WAC 296-400A-045 verbatim ('For each issuance, renewal or reregistration of a license … $148.10'), WSR 26-10-060 eff. 2026-07-01 (read in full 2026-10-04). CONFLICT-WA-001 (OPEN): the L&I Plumbing Licensing Requirements page shows renewal $139.10 — the pre-6.51%-increase figure — beside this row; encoded amount follows the WAC (rule > page), L&I figure preserved in the conflict record (research §L.3/quality gate).
$148.10licenseS-WA-WAC-296-400A-045
Contractor registration — issuance / renewal / reregistration (2 years)
WAC 296-200A-900 verbatim ($150.20), amended by WSR 26-10-060 Order 25-30 effective 2026-07-01 (read 2026-10-04); corroborated by the L&I Register page ('$150.20') and Form F625-001-000 (rev. 07-2026). Statutory base $100 under RCW 18.27.075, revised biennially by the fiscal growth factor — the rule amount is the operative one (research §L.1).
$150.20applicationS-WA-WAC-296-200A-900
Plumber trainee certificate (annual)
WAC 296-400A-045 verbatim ($60.00, one year); L&I corroborates. Siblings published beside it: backflow renewal $167.40, domestic pump $242.80, medical gas renewal $166.90, temporary permit (120 days) $100.30 (research §L.3).
$60.00certificationS-WA-WAC-296-400A-045
Plumber certification — retest to reinstate (>90 days expired)
L&I Get or Renew page verbatim: '90 calendar days after your certification has expired — … you must retest to reinstate your certification. A retesting fee of $189.80 will apply along with your certification fee' (read 2026-10-04). Not in the WAC read excerpt — published from the L&I page (research §J/§L.3).
$189.80miscellaneousS-WA-LNI-PLUMB-RENEW

Withheld on purpose (never guessed): the statewide electrical work-permit fee schedule, all local permit fee amounts and city business-licence fees — each named as NOT_VERIFIED or LOCAL_AUTHORITY_REQUIRED, never estimated. The CONFLICT-WA-001 plumbing figures are published only as the conflicting claim.

Full fees page →

12 Permits and inspection

  • The permit issuer must verify your registration — RCW 18.27.110 forbids issuing a building permit for registrable work without verification, requires the number printed and a homeowner-risk notice, and forfeits the permit if the exemption was falsified; ch. 18.106.440 is the plumbing twin. (Rule WA-PERMIT-VERIFY.) S-WA-18-27-110
  • Electrical permits are their own system — ch. 19.28 has its own permit and inspection regime, separate from the building permit. S-WA-19-28-101
  • Local permit rules vary by city — Seattle, Spokane, Tacoma, Vancouver and Bellevue each publish their own permitting paths, including re-roof and mechanical-permit specifics. The five researched rows are in section 18's local table below and on the project pages.

13 Solar and photovoltaics

Solar in Washington is electrical work — there is no standalone solar licence (verified absence), with solar-thermal handled under the plumbing/HVAC/R specialties:

  • No generic solar licence — verified absence — Verified by enumerating all 63 WAC 296-200A-016 specialties (read in full 2026-10-04): no solar classification exists; solar-related scope appears only inside HVAC/R (28, 'systems that utilize solar energy') and boiler/steam/process piping (4, 'solar heating equipment associated with these systems'). Photovoltaic installation is 'electrical construction trade' work → electrical contractor license (general 01 = 'all phases and all types,' unambiguously qualified). The residential (02) specialty's WAC scope EXCLUDES '(D) Interconnected electric power production sources not connected to equipment that supplies one- and two-family dwellings, or multifamily dwellings of types III, IV or V construction, or ancillary structures' — whether 02 may install rooftop PV tied to the dwelling's own equipment is genuinely ambiguous. Seattle: 'If your solar PV system is rated under 7.7KW, you can apply online without plan review. However, you must have your plans and the manufacturer installation instructions available at the job site during your electrical inspection.' (Rule WA-SOLAR-CREDENTIAL.) S-WA-WAC-296-46B-920
  • The residential-electrical (02) rooftop-PV reading is OPEN — WAC 296-46B-920(2)(a)(ii)(D) excludes interconnected power-production sources not connected to dwelling-supplying equipment; whether residential-class (02) electricians may do rooftop PV inside a dwelling is genuinely ambiguous, so the rule returns NOT_DETERMINED. Rule WA-ELEC-02-SOLAR.
  • Who installs otherwise — an electrical contractor (01 unambiguous) + certified electricians; solar-thermal runs through the plumbing/HVAC/R specialties. S-WA-LNI-ELEC-CONTRACTOR

Solar installation project page →

14 Official lookup

Before hiring — or before claiming your own credential status — check the official lookups. They are linked, not mirrored, so the status vocabulary is whatever the agency publishes:

The L&I contractor lookup covers the ch. 18.27 registration; electrical and plumbing credentials have their own L&I verification paths. Local lookups for the five researched cities are named with their local rows.

15 Project examples

Solar Installation solar-installation

  • may require ELECTRICAL-CONTRACTOR-GENERAL-01 General Electrical Contractor License (01) (business) S-WA-WAC-296-46B-920 rule WA-SOLAR-CREDENTIAL
  • alternative ELECTRICAL-RESIDENTIAL-02 Residential (02) Electrical Specialty (license/certificate scope) S-WA-WAC-296-46B-920 rule WA-ELEC-02-SOLAR
  • component basis ELECTRICIAN-JOURNEY-01 General Journey Level Electrician (01) (individual certificate) S-WA-LNI-ELECTRICIAN rule WA-ELEC-WORKER
  • alternative SPECIALTY-HVAC-R Heating, Ventilation, Air-Conditioning and Refrigeration (HVAC/R) (specialty) S-WA-WAC-296-200A-016 rule WA-SOLAR-CREDENTIAL

HVAC Replacement hvac-replacement

  • may require SPECIALTY-HVAC-R Heating, Ventilation, Air-Conditioning and Refrigeration (HVAC/R) (specialty) S-WA-WAC-296-200A-016 rule WA-REG-REQUIRED
  • component basis ELECTRICIAN-SPECIALTY Specialty Electrician (individual certificate — 14 specialty categories) S-WA-LNI-ELECTRICIAN rule WA-ELEC-WORKER
  • may require ELECTRICAL-CONTRACTOR-GENERAL-01 General Electrical Contractor License (01) (business) S-WA-WAC-296-46B-920 rule WA-ELEC-CONTRACTOR

Roof Replacement roof-replacement

  • may require SPECIALTY-ROOFING Roofing (specialty) S-WA-WAC-296-200A-016 rule WA-REG-REQUIRED
  • alternative GENERAL-CONTRACTOR General Contractor (ch. 18.27 registration class) S-WA-18-27-010 rule WA-GC-SCOPE

Water Heater Replacement water-heater-replacement

  • component basis PLUMBER-RESIDENTIAL-PL02 Residential Plumber (PL02) (individual certificate) S-WA-LNI-PLUMBER-CERT rule WA-PLUMB-WORKER
  • alternative ELECTRICAL-CONTRACTOR-GENERAL-01 General Electrical Contractor License (01) (business) S-WA-18-106-150 rule WA-ELEC-PLUMB-INCIDENTAL
  • may require PLUMBING-CONTRACTOR Plumbing Contractor License (business) S-WA-18-106-400 rule WA-PLUMB-CONTRACTOR

Bathroom Remodel bathroom-remodel

  • may require PLUMBING-CONTRACTOR Plumbing Contractor License (business) S-WA-18-106-400 rule WA-PLUMB-CONTRACTOR
  • component basis ELECTRICIAN-JOURNEY-01 General Journey Level Electrician (01) (individual certificate) S-WA-LNI-ELECTRICIAN rule WA-ELEC-WORKER
  • may require GENERAL-CONTRACTOR General Contractor (ch. 18.27 registration class) S-WA-LNI-PLUMB-CONTRACTOR rule WA-GC-NO-PLUMBING
  • component basis PLUMBER-JOURNEY-LEVEL-PL01 Journey Level Plumber (PL01) (individual certificate) S-WA-18-106-020 rule WA-PLUMB-WORKER
  • may require ELECTRICAL-CONTRACTOR-GENERAL-01 General Electrical Contractor License (01) (business) S-WA-19-28-041 rule WA-ELEC-CONTRACTOR

Minor Work minor-work

  • may require SPECIALTY-HANDYMAN Handyman (specialty) S-WA-WAC-296-200A-016 rule WA-HANDYMAN-2K
  • may require GENERAL-CONTRACTOR General Contractor (ch. 18.27 registration class) S-WA-18-27-020 rule WA-REG-REQUIRED
  • may require PLUMBING-CONTRACTOR Plumbing Contractor License (business) S-WA-18-106-020 rule WA-PLUMB-CONTRACTOR
  • may require ELECTRICAL-CONTRACTOR-GENERAL-01 General Electrical Contractor License (01) (business) S-WA-LNI-ELEC-CONTRACTOR rule WA-ELEC-CONTRACTOR

Every project page runs the deterministic rule first: missing facts return NOT_DETERMINED, never a forced answer. Five routes are deliberately absent (policy "absent", not missing): exemptions, permit-fees, exam-requirements, local-licensing and projects/home-addition — each would duplicate what is already here.

16 Local layer (five jurisdictions)

LOCAL EXAMPLES — NOT STATEWIDE. Five regimes were researched from official pages (Spokane is held pending — snippet-only, so its row is withheld); they do not generalize. Cities issue permits and general business licences; the state registration remains the contractor authority:

State layerverified — registration + the two trade licences

The state registers construction contractors (ch. 18.27) and licenses the electrical (ch. 19.28) and plumbing (ch. 18.106) trades; RCW 18.27.130 bars a local contractor licence but keeps the local permit and general business licence. S-WA-18-27-130 S-WA-18-27-020

Local layerfour published regimes — each official
LOCAL — Tacoma — 'both a City business license and Washington State contractor's license are required'; plumbing permits for all plumbing work (LOCAL EXAMPLE)

City of Tacoma official page (read verbatim 2026-10-04): 'Yes, to do work in the City of Tacoma both a City business license and Washington State contractor's license are required.' 'Plumbing permits are required for all plumbing work including water service, drains, water mains, sewage disposal systems and related fixtures and appliances.' E-permits via Accela include Residential Roof Overlay and Commercial Strip and Re-roof; over-the-counter appointments; some permits require a bond before approval; pre-application reviews $1,670 (Option A) / $3,340 (Option B). NO local contractor license (RCW 18.27.130). S-WA-TACOMA

LOCAL — Vancouver WA — city business license as a DOR BLS endorsement on the same UBI; RES building permits required (LOCAL EXAMPLE)

City of Vancouver (read in full 2026-10-04): 'Vancouver requires a business to hold a city business license (also called "endorsement") if it is either (1) physically located within city limits, or (2) its staff engage in business within city limits…' Administered through WA DOR BLS: 'A business's state-issued Unified Business Identifier (UBI) is used to reference both its state business and its city business license'; look up status via DOR Business Lookup (name or UBI); separate license per location; fee exemptions ≤$4,000 in-city gross (all city fees; state fees still due) and $4,000–$53,000 (city employee fee); home-based contractors may need a Home Occupation Permit (VMC 20.860). 'Residential Building Permits (RES) are required for the construction, alteration, addition, repair, or demolition of residential buildings and structures.' NO local contractor license (RCW 18.27.130). S-WA-VAN-BIZ

LOCAL — Bellevue — 'Any contractor conducting business in the city must be licensed by the State … L&I'; state credential + Bellevue business license before permit issuance (LOCAL EXAMPLE)

City of Bellevue FAQ (read 2026-10-04): 'Under state law, the City of Bellevue is obligated to provide written notification to all homeowners regarding the contractor registration requirements set forth in the Revised Codes of Washington (RCW), Chapter 18.27 … Any contractor conducting business in the city must be licensed by the State of Washington Department of Labor and Industries.' Permit Process Overview (official-domain snippet, pending_verification): 'For construction permits, you will need to provide your contractor's Washington State contractor license and Bellevue business license prior to issuance.' NO local contractor license (RCW 18.27.130). S-WA-BELLEVUE-FAQ

LOCAL — Seattle (SDCI) — $6,000/6-month no-permit band, re-roof exemption, city electrical permits, city business license (LOCAL EXAMPLE)

Seattle SDCI pages (all read 2026-10-04): 'You don't need a permit for minor repairs or alterations that cost $6,000 or less in any 6-month period … even if you do the work yourself' — but load-bearing/envelope/egress work always needs a permit. Re-roof: 'A permit is not required for re-roof work at one- and two-family homes and townhouses if no changes are made to the building envelope other than adding or replacing insulation…'; required when repairing >500 sq ft or replacing roofing materials on commercial/multifamily (or envelope changes); no on-site inspection, close by affidavit. Electrical permits: 'Any professional applying for electrical permits must have a Washington State electrical contractor's license and a Seattle business license. Property owners may do their own work when they own and occupy the property they're working on'; Seattle performs cover/service/final inspections (local enforcement under RCW 19.28.141); small solar PV <7.7 kW without plan review. Mechanical permits by value + hourly review; gas lines/plumbing are separate permits. Seattle business license required to do business in the city. NO local contractor license exists (RCW 18.27.130). S-WA-SEATTLE-PERMIT

Permit fee schedules, plan-review timelines and every locality beyond these five are LOCAL_AUTHORITY_REQUIRED. Spokane was researched from search-result snippets and its official PDF — recorded as a disclosed limitation.

17 Scope assertions

Scope is recorded as typed assertions — officially included, officially excluded, requires another classification, not determined, or our interpretation (always marked). There is no boolean "covers":

  • Officially excluded washington:sp-hvac-r — Line Voltage Controllers Or Disconnects External To Hvac Equipment (WAC 296-46B-920(2)(f)) S-WA-WAC-296-46B-920
    The external-electrical boundary for HVAC replacement: line-voltage work outside the unit is ELECTRICAL contracting, not HVAC specialty work (research §N.4).
  • Officially included washington:plumber-journey-pl01 — Potable Water Distribution Fixtures Traps Drains And Water Heaters Within Property Lines (RCW 18.106.020; L&I Plumber Certification program) S-WA-LNI-PLUMBER-CERT
    The individual plumbing boundary — water heaters inside the trade (water-heater page), outside-building lines outside it (research §D.4/§N.5).
  • Officially included washington:specialty-contractor — Operations Outside The General Contractor Definition Single Registered Specialty (RCW 18.27.010(12)) S-WA-18-27-010
    The specialty boundary: scope = the registered specialty + incidental subcontracting only. Multi-trade work → general class (research §D.1/§7).
  • Officially included washington:sp-framing-rough-carpentry — Roof Decking Truss Members And Rafters And Structural Carpentry (WAC 296-200A-016(23)) S-WA-WAC-296-200A-016
    The positive half of the roofing/structure boundary — the specialty that CAN repair roof structure (research §N.1).
  • Officially excluded washington:sp-handyman — Any Work Requiring A Building Permit Or Work With Employees (WAC 296-200A-016(26)) S-WA-WAC-296-200A-016
    The handyman band: a specialty with hard limits, distinct from the pure sub-$500 registration EXEMPTION (RCW 18.27.090(9)) (research §G.4/§N.2).
  • Officially excluded washington:sp-roofing — Structural Repair Of Trusses Beams Or Joists (WAC 296-200A-016(44)) S-WA-WAC-296-200A-016
    The roofing specialty's own statutory-style limit — the structural-repair question on the roof-replacement page is a negative from the credential's own text, not our reading (research §N.1).
  • Officially included washington:sp-hvac-r — Heating Ventilating Air Conditioning Systems And Attached Services (WAC 296-200A-016(28)) S-WA-WAC-296-200A-016
    HVAC's whole statewide answer: a registration specialty, not a license — plus the external-electrical boundary in SCOPE-WA-HVAC-NO-EXTERNAL-DISCONNECT (research §10/§N.4).
  • Officially included washington:electrical-contractor-general — All Phases And All Types Of Electrical And Telecommunications Installations (WAC 296-46B-920(1); RCW 19.28.041) S-WA-WAC-296-46B-920
    The unambiguous electrical credential — general (01) is the one qualified for rooftop PV without interpretive strain (research §D.3/§O).
  • Officially included washington:general-contractor — More Than One Building Trade Or Craft On A Single Job Or Permit Or Superintending Consulting (RCW 18.27.010(5) / (1)(a)) S-WA-18-27-010
    The general-contractor class definition — Washington uses 'registration' and 'class', never a 'general contractor license' (research §B/§D.1).
  • Requires another classification washington:sp-appliances-equipment — Installation Or Replacement Of Dishwashers Hot Water Tanks And Garbage Disposals (WAC 296-200A-016(1)) S-WA-WAC-296-200A-016
    The water-heater page's decisive text: the appliance specialty may NOT do the job — plumbing and/or electrical credentials are required instead (research §N.5).

18 Sources

Every source used on this page: official URL, publishing authority, retrieval date and verification date. Commercial contractor sites, SEO directories and law-firm marketing pages were discovery leads only and are never cited as authority. The RCW and WAC text was read from the official app.leg.wa.gov publications; L&I pages and the F625 guide are official; Spokane is recorded with its disclosed limitation.

S-WA-18-27-010statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.010 — Definitions
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.010
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-020statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.020 — Registration required — Prohibited acts — Criminal penalty
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.020
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-030statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.030 — Application for registration — Grounds for denial and suspension
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.030
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-040statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.040 — Bond or other security required — Actions against — Suspension upon impairment
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.040
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-050statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.050 — Insurance or financial responsibility required — Suspension upon impairment
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.050
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-060statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.060 — Certificate of registration — Issuance, duration, renewal — Suspension
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.060
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-080statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.080 — Registration prerequisite to suit
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.080
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-090statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.090 — Exemptions (all seventeen)
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.090
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-100statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.100 — Business practices — Advertising — Penalty
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.100
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-110statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.110 — Building permits — Verification of registration required — Responsibilities of issuing entity
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.110
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-114statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.114 — Disclosure statement required — Prerequisite to lien claim
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.114
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-130statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.130 — Chapter exclusive — Certain authority of cities and towns not limited or abridged
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.130
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-340statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.27.340 — Infraction — Monetary penalty
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27.340
verified 2026-10-04retrieved 2026-10-04
S-WA-18-27-TOCstatute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
Chapter 18.27 RCW — Registration of Contractors (complete section list)
https://app.leg.wa.gov/RCW/default.aspx?cite=18.27
verified 2026-10-04retrieved 2026-10-04
S-WA-18-106-020statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.106.020 — Certificate or permit required — Photo identification — Trainee supervision — Penalty
https://app.leg.wa.gov/RCW/default.aspx?cite=18.106.020
verified 2026-10-04retrieved 2026-10-04
S-WA-18-106-150statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.106.150 — Exemptions (plumbing)
https://app.leg.wa.gov/RCW/default.aspx?cite=18.106.150
verified 2026-10-04retrieved 2026-10-04
S-WA-18-106-400statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.106.400 — Plumbing contractor licensing
https://app.leg.wa.gov/RCW/default.aspx?cite=18.106.400
verified 2026-10-04retrieved 2026-10-04
S-WA-18-106-410statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.106.410 — Plumbing contractor license — Surety bond
https://app.leg.wa.gov/RCW/default.aspx?cite=18.106.410
verified 2026-10-04retrieved 2026-10-04
S-WA-18-106-420statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 18.106.420 — Plumbing contractor licensing — Insurance — Financial responsibility
https://app.leg.wa.gov/RCW/default.aspx?cite=18.106.420
verified 2026-10-04retrieved 2026-10-04
S-WA-19-28-041statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 19.28.041 — Electrical contractor license — Requirements — Exclusivity
https://app.leg.wa.gov/RCW/default.aspx?cite=19.28.041
verified 2026-10-04retrieved 2026-10-04
S-WA-19-28-101statute
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
RCW 19.28.101 — Inspections — Permits, fees — Limitation — Waiver during state of emergency
https://app.leg.wa.gov/RCW/default.aspx?cite=19.28.101
verified 2026-10-04retrieved 2026-10-04
S-WA-BELLEVUE-FAQfaq
City of Bellevue — Development Services
City of Bellevue — Contractor Registration Requirements FAQ (RCW 18.27 notification duty, state credential rule)
https://bellevuewa.gov/city-government/departments/development/permits/faqs/contractor-registration-requirements
verified 2026-10-04retrieved 2026-10-04
S-WA-DOR-BIZboard page
Washington Department of Revenue — Business Licensing Service (UBI)
DOR — Apply for a business license (UBI, SOS-first rule, registration conditions)
https://dor.wa.gov/open-business/apply-business-license
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-ELEC-CONTRACTORboard page
Washington State Department of Labor & Industries (L&I)
L&I — Electrical Contractor (license requirements, bond, renewal, reinstatement)
https://lni.wa.gov/licensing-permits/electrical/electrical-licensing-exams-education/electrical-contractor
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-ELECTRICIANboard page
Washington State Department of Labor & Industries (L&I)
L&I — Electrician (individual certificates, experience, exams, renewal, CE)
https://lni.wa.gov/licensing-permits/electrical/electrical-licensing-exams-education/electrician
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-PLUMB-CEboard page
Washington State Department of Labor & Industries (L&I)
L&I — Plumbing Continuing Education (hours by certificate level)
https://www.lni.wa.gov/licensing-permits/plumbing/continuing-education
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-PLUMB-CONTRACTORboard page
Washington State Department of Labor & Industries (L&I)
L&I — Plumbing Licensing Requirements (SB 6170 history, application, bond, insurance, renewal)
https://lni.wa.gov/licensing-permits/plumbing/licensed-plumbing-contractor/licensing-requirements
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-PLUMB-RENEWboard page
Washington State Department of Labor & Industries (L&I)
L&I — Get or Renew Your Certification (plumber exams, fees, 3-year renewal, late ladder)
https://lni.wa.gov/licensing-permits/plumbing/plumber-certification/get-or-renew-your-certification
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-PLUMBER-CERTboard page
Washington State Department of Labor & Industries (L&I)
L&I — Plumber Certification (trade definition, certification levels, experience hours)
https://lni.wa.gov/licensing-permits/plumbing/plumber-certification/
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-RECOVERYboard page
Washington State Department of Labor & Industries (L&I)
L&I — Homeowner Recovery Fund (eligibility, $25,000 cap, post-2026-07-01 judgments)
https://lni.wa.gov/licensing-permits/contractors/problems-with-a-contractor/homeowner-recovery-fund
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-REGISTERboard page
Washington State Department of Labor & Industries (L&I)
L&I — Register as a Contractor (registration steps, bonds, insurance, disclosure, renewal)
https://www.lni.wa.gov/licensing-permits/contractors/register-as-a-contractor/
verified 2026-10-04retrieved 2026-10-04
S-WA-LNI-WCboard page
Washington State Department of Labor & Industries (L&I)
L&I — Do I Need a Workers' Comp Account? (monopolistic state fund)
https://lni.wa.gov/insurance/insurance-requirements/do-i-need-a-workers-comp-account/
verified 2026-10-04retrieved 2026-10-04
S-WA-SEATTLE-PERMITboard page
City of Seattle — Seattle Department of Construction and Inspections (SDCI)
Seattle SDCI — Do You Need a Permit? ($6,000/6-month minor-work threshold, exemptions)
https://www.seattle.gov/construction-and-inspections/permits/do-you-need-a-permit
verified 2026-10-04retrieved 2026-10-04
S-WA-TACOMAfaq
City of Tacoma — Planning and Development Services
City of Tacoma — Apply for Permits (city business license + state contractor license FAQ, plumbing permits)
https://tacoma.gov/government/departments/planning-and-development-services/permits-and-development-services/apply-for-permits/
verified 2026-10-04retrieved 2026-10-04
S-WA-VAN-BIZboard page
City of Vancouver (Washington)
City of Vancouver WA — Business and Special Licenses (DOR BLS endorsement on the UBI, fee exemptions)
https://www.cityofvancouver.us/business/permits-licenses-and-inspections/business-and-special-licenses/
verified 2026-10-04retrieved 2026-10-04
S-WA-WAC-296-46B-909regulation
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
WAC 296-46B-909 — Electrical license, certificate and examination fees
https://app.leg.wa.gov/WAC/default.aspx?cite=296-46B-909
verified 2026-10-04retrieved 2026-10-04effective 2026-07-01
S-WA-WAC-296-46B-920regulation
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
WAC 296-46B-920 — Electrical/telecommunications license/certificate types and scope of work
https://app.leg.wa.gov/WAC/default.aspx?cite=296-46B-920
verified 2026-10-04retrieved 2026-10-04
S-WA-WAC-296-200A-016regulation
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
WAC 296-200A-016 — Definitions of the specialty contractor classifications (63 specialties)
https://app.leg.wa.gov/WAC/default.aspx?cite=296-200A-016
verified 2026-10-04retrieved 2026-10-04effective 2009-06-05
S-WA-WAC-296-200A-900regulation
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
WAC 296-200A-900 — Contractor registration fee schedule
https://app.leg.wa.gov/WAC/default.aspx?cite=296-200A-900
verified 2026-10-04retrieved 2026-10-04effective 2026-07-01
S-WA-WAC-296-400A-045regulation
Washington State Legislature — RCW & WAC (app.leg.wa.gov)
WAC 296-400A-045 — Plumbing contractor and plumber certificate fees
https://app.leg.wa.gov/WAC/default.aspx?cite=296-400A-045
verified 2026-10-04retrieved 2026-10-04effective 2026-07-01

19 Last verified

Page last verified
2026-10-04
newest verification date across the sources this page depends on
Policy reviewed
2026-10-04
policy: index — Washington hub — the four-layer distinction the research demands: contractor REGISTRATION vs TRADE-SPECIFIC CREDENTIALS (electrical ch. 19.28 / plumbing ch. 18.106) vs BUSINESS REGISTRATION (DOR/UBI) vs LOCAL PERMITS (RCW 18.27.130 preemption), the JOB → LOCATION → TRADE → CREDENTIAL → SCOPE → REQUIREMENTS → PERMIT → OFFICIAL VERIFICATION walkthrough, registration-vs-licensing terminology verbatim (RCW 18.27.020, .010(5)/(12)), general vs specialty with $30k/$15k bonds, GL $250k-form reconciled from split limits, monopolistic WC state fund, disclosure ≥$1,000 lien-prerequisite, penalties $1,200–$10,000, Homeowner Recovery Fund (≤$25,000, post-2026-07-01 judgments, 90-day window), the $500/handyman bands, all THREE open conflicts shown, five-city local model table with verbatim quotes, official lookups — every claim sourced.
CheckedSubjectMethodResultNotes
2026-10-04source:S-WA-18-27-TOChttp checkconfirmedHTTP 200, read 2026-10-04 — complete section list: every section is registration/bond/insurance/fee/exemption/advertising/permit/disclosure/preemption/infraction/penalty/recovery. Backs the VERIFIED ABSENCE of any registration exam or CE (REQ-WA-NO-EXAM-001 / REQ-WA-NO-CE-REGISTRATION-001).
2026-10-04source:S-WA-18-27-010http checkconfirmedHTTP 200, read in full 2026-10-04 — (1)(a) contractor incl. multi-trade owners, (5) general contractor, (12) specialty contractor, (15) unregistered incl. ≤30-day lapse, (17) verification. History [2026 c 77 s 1]. Backs REQ-WA-CLASS-GC/SC, SCOPE-WA-GC-DEF/SC-DEF, rules WA-GC-SCOPE/WA-SC-LIMITS/WA-REG-2YR.
2026-10-04source:S-WA-18-27-020http checkconfirmedHTTP 200, read 2026-10-04 — 'Every contractor shall register with the department' + gross-misdemeanor/per-day-per-worksite structure. Backs REQ-WA-REGISTRATION-REQUIRED-001 and rule WA-REG-REQUIRED.
2026-10-04source:S-WA-18-27-030http checkconfirmedHTTP 200, read 2026-10-04 — application under oath, SSN/ITIN + UBI + industrial insurance + ESD items, denial grounds incl. NO ACTIVE DOR CERTIFICATE OF REGISTRATION. Backs REQ-WA-APPLICATION-001 / REQ-WA-BUSINESS-UBI-001 (rule WA-BUSINESS-UBI).
2026-10-04source:S-WA-18-27-040http checkconfirmedHTTP 200, read 2026-10-04 — $30,000 general / $15,000 specialty bond verbatim, auto-suspension, claims ladder, ½-bond non-homeowner cap, 2-year/1-year suit windows. Backs all four BOND-WA-* rows and rule WA-GC-BOND.
2026-10-04source:S-WA-18-27-050http checkconfirmedHTTP 200, read 2026-10-04 — $50k PD / $100k one / $200k more-than-one split limits at registration AND renewal; auto-suspension on impairment. Backs INS-WA-GL-REG, REQ-WA-INSURANCE-GL-001 (split-vs-CSL reconciled arithmetically, not a conflict), rule WA-GL-INSURANCE.
2026-10-04source:S-WA-18-27-060http checkconfirmedHTTP 200, read in full 2026-10-04 (history [2026 c 77 s 2]) — TWO-YEAR certificate; renewal valid on receipt of fee + bond + insurance proof; 2-day suspension notice (2026 electronic option). Backs RENEW-WA-REGISTRATION, rules WA-REG-2YR/WA-REINSTATE-LATE.
2026-10-04source:S-WA-18-27-070http checkconfirmedHTTP 200, read 2026-10-04 — department charges issuance/renewal/reinstatement/change fees BY RULE. Fee-authority chain with .075 → WAC 296-200A-900 (research §L header).
2026-10-04source:S-WA-18-27-075http checkconfirmedHTTP 200, read 2026-10-04 — statutory $100 base revised biennially by the fiscal growth factor; explains why the operative amount lives in WAC 296-200A-900 ($150.20) (research §L.1).
2026-10-04source:S-WA-18-27-080http checkconfirmedHTTP 200, read in full 2026-10-04 — registration prerequisite to suit; substantial compliance requires application info + bond + insurance in force AT ALL TIMES. Backs REQ-WA-REG-TO-SUE-001 (rule WA-REG-TO-SUE).
2026-10-04source:S-WA-18-27-090http checkconfirmedHTTP 200, read in full 2026-10-04 — ALL SEVENTEEN exemptions incl. (9) <$500 with anti-evasion + no-advertising, (11)-(13) owner paths, (14) certified tradespeople within scope, (15) employees. NO electrical-contractor exemption (absence feeds CONFLICT-WA-002 analysis). Backs REQ-WA-MINOR-500/HOMEOWNER, rules WA-MINOR-500/WA-OWN-PROPERTY.
2026-10-04source:S-WA-18-27-100http checkconfirmedHTTP 200, read in full 2026-10-04 — registration number on all advertising/contracts, no 'bonded and insured' advertising, ≤$10,000 penalty (inadvertent error excluded). Backs REQ-WA-ADVERTISING-001 (rule WA-AD-NUMBER).
2026-10-04source:S-WA-18-27-110http checkconfirmedHTTP 200, read 2026-10-04 — permit issuance requires registration verification + printed number + homeowner-risk notice; falsified exemption forfeits permit. Backs REQ-WA-PERMIT-VERIFY-001 (rule WA-PERMIT-VERIFY).
2026-10-04source:S-WA-18-27-114http checkconfirmedHTTP 200, read 2026-10-04 — NOTICE TO CUSTOMER ≥$1,000 residential (≤4 units) / $1,000–$60,000 commercial, 12-pt bold, 3-year retention, '(4) compliance with this section is a prerequisite to any lien claim'. Backs REQ-WA-DISCLOSURE-001 (rule WA-DISCLOSURE-1K).
2026-10-04source:S-WA-18-27-130http checkconfirmedHTTP 200, read 2026-10-04 — chapter EXCLUSIVE: no political subdivision may issue contractor registrations/licenses/bonds for the same purpose; carve-outs = general business license fee/gross-receipts tax + non-registrable contractors. Backs REQ-WA-PREEMPTION-001 (rule WA-NO-LOCAL-LICENSE).
2026-10-04source:S-WA-18-27-200http checkconfirmedHTTP 200, read in full 2026-10-04 — five infraction categories incl. 'Subcontract to, or use, an unregistered contractor'; each day/worksite a separate infraction. Backs REQ-WA-PENALTIES-001.
2026-10-04source:S-WA-18-27-340http checkconfirmedHTTP 200, read 2026-10-04 — general infraction $200–$10,000; FAILURE TO REGISTER $1,200–$10,000 with sub-$600 reduction for registering within 10 days of first-offense notice. Backs REQ-WA-PENALTIES-001 (rule WA-REG-REQUIRED caveat).
2026-10-04source:S-WA-18-106-020http checkconfirmedHTTP 200, read in full 2026-10-04 — certificate + photo ID to work; 'After January 1, 2021, no contractor may employ a person … unless the contractor is a licensed plumbing contractor'; medical gas never exempt; subcontract-to-unlicensed prohibition. Backs REQ-WA-PLUMBER-001 (rules WA-PLUMB-WORKER/WA-PLUMB-CONTRACTOR/WA-GC-NO-PLUMBING).
2026-10-04source:S-WA-18-106-150http checkconfirmedHTTP 200, read in full 2026-10-04 — own-residence exemption (1), premises owned/operated (5), householder-helping (6), medical gas no-exemption (7), like-in-kind appliance exception (8). Backs REQ-WA-HOMEOWNER-PLUMB-001 / REQ-WA-ELEC-PLUMB-INCIDENTAL-001 (rules WA-HOMEOWNER-PLUMB / WA-ELEC-PLUMB-INCIDENTAL).
2026-10-04source:S-WA-18-106-400http checkconfirmedHTTP 200, read 2026-10-04 — 24-calendar-month license; (3) NOT required to register under ch. 18.27 for plumbing; (4) FULL-TIME certified plumber; (7) own-residence exemption unless for rent/sale. Backs REQ-WA-PLUMBING-CONTRACTOR-001, RENEW-WA-PLUMBING (rule WA-PLUMB-CONTRACTOR).
2026-10-04source:S-WA-18-106-410http checkconfirmedHTTP 200, read 2026-10-04 — $6,000 surety bond, auto-suspension, RCW 18.27.040 claim structure. Backs BOND-WA-PLUMBING.
2026-10-04source:S-WA-18-106-420http checkconfirmedHTTP 200, read in full 2026-10-04 — same split limits as RCW 18.27.050 at license AND renewal; assigned-account counterparty-notice duty. Backs INS-WA-GL-PLUMBING.
2026-10-04source:S-WA-18-106-440http checkconfirmedHTTP 200, read in full 2026-10-04 — plumbing-permit verification + printed number + notice duties (twin of RCW 18.27.110). Backs REQ-WA-PERMIT-VERIFY-001 (plumbing limb).
2026-10-04source:S-WA-19-28-041http checkconfirmedHTTP 200, read 2026-10-04 — license to do electrical contracting, 24-calendar-month cycle, $4,000 bond (one max), (4) exclusivity vs political subdivisions, (5) designated master/administrator. Backs REQ-WA-ELECTRICAL-CONTRACTOR-001, BOND-WA-ELECTRICAL, RENEW-WA-ELECTRICAL (rules WA-ELEC-CONTRACTOR/WA-NO-LOCAL-LICENSE).
2026-10-04source:S-WA-19-28-091http checkconfirmedHTTP 200, read in full 2026-10-04 — exemptions (1)-(8); $30,000 nonprofit clause; plumbing-contractor mirror of 18.106.150(8). VERIFIED ABSENCE: NO owner-occupant self-perform exemption — backs REQ-WA-HOMEOWNER-ELEC-001 (rule WA-HOMEOWNER-ELEC → NOT_DETERMINED state / Seattle local rule).
2026-10-04source:S-WA-19-28-101http checkconfirmedHTTP 200, read in full 2026-10-04 — L&I inspects (state default), permit affixed, 48-h/24-h inspection windows, (6) fee schedule by rule; RCW 19.28.141 local opt-out note (Seattle). Backs REQ-WA-ELECTRICAL-PERMIT-001; permit-fee amounts remain NOT_VERIFIED (withheld).
2026-10-04source:S-WA-WAC-296-200A-016http checkconfirmedHTTP 200, read in full 2026-10-04 — all 63 specialty definitions seeded as classification rows; verbatim limits ((1) appliances, (26) handyman $2,000-no-permit, (42) plumbing stale text = CONFLICT-WA-003, (44) roofing no-truss). Backs SCOPE-WA-ROOFING-NO-TRUSS, SCOPE-WA-FRAMING-COVERS-TRUSS, SCOPE-WA-APPLIANCE-NO-WATER-HEATER, SCOPE-WA-HVAC-SCOPE, SCOPE-WA-HANDYMAN-LIMITS.
2026-10-04source:S-WA-WAC-296-200A-900http checkconfirmedHTTP 200, read 2026-10-04 — $150.20 issuance/renewal/reregistration, $70.90 reinstatement, $16.50 duplicate + ancillary schedule; WSR 26-10-060 Order 25-30 eff. 2026-07-01. Backs FEE-WA-REG-ISSUANCE/-REINSTATEMENT/-DUPLICATE.
2026-10-04source:S-WA-WAC-296-400A-045http checkconflictHTTP 200, read in full 2026-10-04 — plumbing fee schedule $148.10/$53.20/$74.00/$202.10/$242.70/$60.00… (WSR 26-10-060 eff. 2026-07-01). CONFLICT-WA-001 detected: L&I's own page shows renewal $139.10 / reinstatement $69.50 (pre-increase figures). WAC amounts encoded; L&I figures preserved beside. OPEN.
2026-10-04source:S-WA-WAC-296-46B-909http checkconfirmedHTTP 200, read 2026-10-04 — electrical fees $353.90/$306.20/$71.50, certificate renewals, exam fees $106.70/$125.00/$80.30, original certificate fees. Electrical WORK-PERMIT amounts absent from the read excerpt → NOT_VERIFIED (withheld, named on fees page).
2026-10-04source:S-WA-WAC-296-46B-920http checkconfirmedHTTP 200, read in full 2026-10-04 — (1) general 01 scope incl. minor plumbing; (2)(a)(ii)(D) residential-exclusion solar boundary (→ SCOPE-WA-ELEC-02-SOLAR C_not_determined); (2)(f) HVAC specialties' external-disconnect prohibition. Backs SCOPE-WA-ELEC-GENERAL-01 / -02-SOLAR / -HVAC-NO-EXTERNAL-DISCONNECT.
2026-10-04source:S-WA-LNI-REGISTERhttp checkconflictHTTP 200, read in full 2026-10-04 — registration steps, $30k/$15k bonds, $250k-form GL, $150.20/$70.90, disclosure F625-030-000, 63 specialties, renewal mechanics. CONFLICT-WA-002 side A: 'all construction contractors' must register vs the Electrical page's 'may also be required'. OPEN.
2026-10-04source:S-WA-LNI-VERIFYhttp checkconfirmedHTTP 200, read 2026-10-04 — THE official statewide lookup (number/UBI/name/owner; certifications, WC status, citations, bond suits). OFFICIAL VERIFICATION target on every page.
2026-10-04source:S-WA-LNI-ELEC-CONTRACTORhttp checkconflictHTTP 200, read in full 2026-10-04 — electrical license requirements, $4,000 bond, designated master/administrator, 2-year renewal, reinstatement $71.50, 'L&I does not keep records of liability insurance for electrical contractors'. CONFLICT-WA-002 side B: 'If an electrical contracting business does other, non-electrical work, registration as a contractor may also be required'. OPEN.
2026-10-04source:S-WA-LNI-ELECTRICIANhttp checkconfirmedHTTP 200, read in full 2026-10-04 — journey 8,000 h + 96 h classroom → PSI; 14 specialty categories (4,000 h / 2,000 h); trainees 16+ 75%/100% supervision; 3-year birthday renewal, 24 h CE (8 code + 4 RCW/WAC), late-double, >90 days retest. Backs RENEW-WA-ELECTRICIAN, rules WA-ELEC-WORKER/WA-CE-INDIVIDUAL.
2026-10-04source:S-WA-LNI-PLUMBER-CERThttp checkconfirmedHTTP 200, read in full 2026-10-04 — trade definition incl. 'Water Heaters'; PL01 8,000 h (4,000 commercial) / PL02 6,000 h ≤3 stories / PL04 4,000 h / PL03, PL03A, PL30, MG01; Idaho reciprocity. Backs SCOPE-WA-PLUMBING-TRADE, classification rows, project worker limbs.
2026-10-04source:S-WA-LNI-PLUMB-RENEWhttp checkconfirmedHTTP 200, read in full 2026-10-04 — 3-year birthday renewal, initial 25–37 months, late fee doubles ($485.40), >90 days → retest $189.80 + cert fee, exam app $202.10, cert fees $242.70/$166.90/$242.80/$167.40. Backs FEE-WA-PLUMB-RETEST and RENEW-WA-PLUMBER late rule.
2026-10-04source:S-WA-LNI-PLUMB-CEhttp checkconfirmedHTTP 200, read in full 2026-10-04 — 24 h/3-yr (12 UPC + 4 IRE min), trainee 8 h/yr, backflow BAT card, medical gas affidavits, no repeat courses (WAC 296-400A-028). Backs RENEW-WA-PLUMBER ceRequirement (rule WA-CE-INDIVIDUAL).
2026-10-04source:S-WA-LNI-PLUMB-CONTRACTORhttp checkconflictHTTP 200, read in full 2026-10-04 — SB 6170 phase-out verbatim ('Beginning July 1, 2021 …'), dedicated plumber, bond/GL/application steps, renewal $139.10 / reinstatement $69.50. CONFLICT-WA-001 side B (fees) AND CONFLICT-WA-003 side B (specialty phase-out) detected here. Both OPEN.
2026-10-04source:S-WA-LNI-WChttp checkconfirmedHTTP 200, read in full 2026-10-04 — 'Washington State does not allow private workers' compensation coverage' verbatim (monopolistic state fund). Backs REQ-WA-WORKERS-COMP-001 / INS-WA-WC (rule WA-WC-STATEFUND).
2026-10-04source:S-WA-LNI-RECOVERYhttp checkconfirmedHTTP 200, read in full 2026-10-04 — own+occupy ≤4 units (condos excluded), judgment AFTER 2026-07-01, 90-day application, ≤$25,000 funds-dependent, RCW 18.27.410 + WAC 296-200A-9100–9135. Backs REQ-WA-RECOVERY-FUND-001 (rule WA-RECOVERY-FUND).
2026-10-04source:S-WA-LNI-NEWS-24-13http checkconfirmedHTTP 200, read 2026-10-04 — bond increase to $30,000/$15,000 eff. 2024-07-01 (prev. $12,000). Corroborates the BOND-WA-REG-* amounts and their history.
2026-10-04source:S-WA-LNI-NEWS-25-31http checkconfirmedHTTP 200, read 2026-10-04 — $1,200 first offense / up to $10,000 repeats. Corroborates REQ-WA-PENALTIES-001 (RCW 18.27.340 band).
2026-10-04source:S-WA-LNI-LAWS-RULEShttp checkunavailableUNAVAILABLE 2026-10-04 — page NOT opened (official-domain search-result snippet only): '6.51% fee increases … effective 2026-07-01'. Used ONLY as the label for the WSR 26-10-060 package; every dollar amount comes from the WAC sections themselves (which WERE read). Source status 'pending_verification'.
2026-10-04source:S-WA-F625retrievalconfirmedPDF downloaded and text-extracted 2026-10-04 — bond table $30k/$15k, insurance PD $50k + BI $200k = $250k total/occurrence, fee $150.20, specialty scope per WAC 296-200A-016, falsification fine ≤$10,000, UBI/principals fields. Corroborates bonds, GL reconciliation and FEE-WA-REG-ISSUANCE.
2026-10-04source:S-WA-DOR-BIZhttp checkconfirmedHTTP 200, read in full 2026-10-04 — registration conditions incl. $12,000/yr gross income, UBI assignment sentence, SOS-first rule for corporations/LLCs/partnerships/LLPs, processing times. Backs REQ-WA-BUSINESS-UBI-001 (rule WA-BUSINESS-UBI). Endorsement fee amounts NOT read → withheld.
2026-10-04source:S-WA-SEATTLE-PERMIThttp checkconfirmedHTTP 200, read 2026-10-04 — '$6,000 or less in any 6-month period' minor-work threshold verbatim + load-bearing/envelope/egress always-permit rule. Backs REQ-WA-LOCAL-SEATTLE-001 (LOCAL EXAMPLE, hub + minor-work page).
2026-10-04source:S-WA-SEATTLE-REROOFhttp checkconfirmedHTTP 200, read 2026-10-04 — re-roof exemption for 1/2-family homes + townhouses (no envelope change) vs >500 sq ft repair / commercial-multifamily permit; affidavit close, no inspection. Backs the roof-replacement page's permit limb (LOCAL EXAMPLE).
2026-10-04source:S-WA-SEATTLE-ELEChttp checkconfirmedHTTP 200, read 2026-10-04 — 'electrical contractor's license and a Seattle business license' + owner-occupant rule verbatim; <7.7 kW solar PV online without plan review; three inspections (cover/service/final); RCW 19.28.141 local enforcement. Backs REQ-WA-LOCAL-SEATTLE-001, REQ-WA-HOMEOWNER-ELEC-001 (local limb), solar page.
2026-10-04source:S-WA-SEATTLE-MECHhttp checkconfirmedHTTP 200, read 2026-10-04 — mechanical permit covers HVAC; 'does not enable you to install plumbing, sprinklers, gas lines, refrigeration, and boiler pressure vessels; these all require a separate permit'. Backs the hvac-replacement page's permit limb (LOCAL EXAMPLE).
2026-10-04source:S-WA-TACOMAhttp checkconfirmedHTTP 200, text extracted 2026-10-04 — FAQ verbatim (city business license + WA state contractor's license required; plumbing permits cover 'fixtures and appliances'); Residential Roof Overlay e-permit; some permits require a bond. Backs REQ-WA-LOCAL-TACOMA-001 (tacomapermits.org 403s — FAQ read on tacoma.gov instead, disclosed).
2026-10-04source:S-WA-VAN-BIZhttp checkconfirmedHTTP 200, read in full 2026-10-04 — DOR BLS endorsement on the same UBI verbatim; ≤$4,000 in-city gross exempt from all city license fees; Home Occupation Permit note. Backs REQ-WA-LOCAL-VANCOUVER-001 (LOCAL EXAMPLE).
2026-10-04source:S-WA-VAN-SERVICEShttp checkconfirmedHTTP 200, read 2026-10-04 — 'Residential Building Permits (RES) are required for the construction, alteration, addition, repair, or demolition…' Corroborates REQ-WA-LOCAL-VANCOUVER-001's permit limb.
2026-10-04source:S-WA-BELLEVUE-FAQhttp checkconfirmedHTTP 200, read 2026-10-04 — the city's RCW 18.27 written-notification duty + 'Any contractor conducting business in the city must be licensed by the State of Washington Department of Labor and Industries' (operative sentence in page metadata). Backs REQ-WA-LOCAL-BELLEVUE-001.
2026-10-04source:S-WA-BELLEVUE-PERMIThttp checkunavailableUNAVAILABLE 2026-10-04 — page NOT opened (official-domain search-result snippet only): 'provide your contractor's Washington State contractor license and Bellevue business license prior to issuance.' Corroborates the read Bellevue FAQ; never the sole source of a deterministic row. Source status 'pending_verification'.
2026-10-04source:S-WA-SPOKANE-SMChttp checkunavailableUNAVAILABLE 2026-10-04 — DIRECT FETCH BLOCKED (my.spokanecity.org 302 self-redirect loop; cookie jar failed). Official-domain SERP snippet captured verbatim: permit eligibility requires a City of Spokane business license + active L&I contractor credential. Never the sole source of a deterministic row. Source status 'pending_verification'.
2026-10-04source:S-WA-SPOKANE-PDFhttp checkunavailableUNAVAILABLE 2026-10-04 — DIRECT FETCH BLOCKED (static.spokanecity.org 403). Official-domain SERP snippet captured verbatim; second corroboration of SMC 17G.010.070. Never the sole source of a deterministic row. Source status 'pending_verification'.
2026-10-04requirement:FEE-WA-PLUMB-CONTRACTOR-ISSUEmanual reviewconflictCONFLICT-WA-001 detected while seeding fees: WAC $148.10/$74.00 vs L&I page $139.10/$69.50 (both current official publications; arithmetic shows L&I lags the 6.51% increase). Encoded at WAC amounts (rule > page); L&I figures published beside. OPEN.
2026-10-04requirement:REQ-WA-ELECTRICAL-ONLY-REG-001manual reviewconflictCONFLICT-WA-002 detected while seeding: L&I Register 'all construction contractors' vs L&I Electrical 'may also be required' only when non-electrical work exists; no ch. 18.27 exemption for electrical found, but 18.106.400(3) shows the Legislature exempts trades expressly (did so for plumbing only). Row confidence 'conflicting'; rule WA-ELEC-ONLY-REG → NOT_DETERMINED. OPEN.
2026-10-04requirement:REQ-WA-PLUMBING-SPECIALTY-PHASEOUT-001manual reviewconflictCONFLICT-WA-003 detected while seeding classification washington:sp-plumbing-xref: WAC 296-200A-016(42) still prints the Plumbing specialty definition vs L&I 'no longer valid' since 2021-07-01 + phase-3 phase-out rulemaking. Current practice governs the encoded side; WAC text preserved verbatim. OPEN.
2026-10-04requirement:REQ-WA-NO-EXAM-001manual reviewconfirmedVerified ABSENCE re-checked: complete ch. 18.27 section list (no examination provision anywhere), L&I registration steps (bond/insurance/business/fee only), F625-001-000 (no exam field). No business-and-law exam, no homeowner exam. Seeded as an absence, never a gap.
2026-10-04requirement:REQ-WA-MINOR-500-001manual reviewconfirmed'<$500 aggregate' + anti-evasion + no-advertising conditions quoted verbatim from RCW 18.27.090(9) (read in full); distinct from the handyman $2,000 specialty (WAC (26), a registration) — three WA thresholds kept separate ($500 exemption / $2,000 handyman / Seattle $6,000 permit).
2026-10-04requirement:REQ-WA-INSURANCE-GL-001manual reviewconfirmedSplit limits ($50k/$100k/$200k) vs L&I '$250,000 combined single limit' RECONCILED arithmetically ($50k + $200k = $250k — same coverage, two policy formulations); F625 form corroborates. Deliberately NOT seeded as a conflict; both phrasings published on the insurance row.
2026-10-04requirement:REQ-WA-PREEMPTION-001manual reviewconfirmedRCW 18.27.130 exclusivity + both statutory carve-outs transcribed; corroborated by ALL five cities modeling 'state credential + city business license + permit' with NO city contractor license (Seattle/Tacoma/Vancouver/Bellevue read; Spokane snippet).
2026-10-04requirement:REQ-WA-PERMIT-VERIFY-001manual reviewconfirmedBoth twins verified from their own sections: RCW 18.27.110 (building) and RCW 18.106.440 (plumbing) — verify + print number + homeowner-risk notice + falsified-exemption forfeiture, each read in full.
2026-10-04requirement:REQ-WA-RECOVERY-FUND-001manual reviewconfirmedAll eligibility gates quoted from the L&I page (read): own+occupy ≤4 units no condos, judgment after 2026-07-01, 90-day window, ≤$25,000 funds-dependent, ~14-business-day review, judgment-rights assignment. Time-gated judgment date flagged so the rule stays honest for earlier judgments.
2026-10-04page:/states/washingtonmanual reviewconfirmedHub policy 'index' per research §R — four-layer distinction (registration/credentials/business/permits) with every claim sourced; gate verified against ALL_PAGE_INDEX_POLICIES at render.
2026-10-04page:/states/washington/classificationsmanual reviewconfirmed78 state credential/classification rows (2 classes + 63 WAC specialties + 13 electrical/plumbing stack rows); no local class seeded as a state row; plumbing specialty carries CONFLICT-WA-003.
2026-10-04page:/states/washington/feesmanual reviewconfirmed17 verified state fee rows (WAC-sourced, eff. 2026-07-01) + by-name NOT_VERIFIED list (electrical work-permit schedule, local permit fees, city license fees, DOR endorsements) + CONFLICT-WA-001 shown beside the plumbing amounts.
2026-10-04page:/states/washington/projects/roof-replacementmanual reviewconfirmedTwo rule-linked rows (roofing specialty, GC alternative); no-truss limit + Seattle/Tacoma permit evidence with sources.
2026-10-04page:/states/washington/projects/minor-workmanual reviewconfirmedFour-band answer; three thresholds kept distinct ($500 / $2,000 / Seattle $6,000); conditional plumbing/electrical rows; own-property rules.
2026-10-04page:/states/washington/projects/bathroom-remodelmanual reviewconfirmedFive rows (plumbing contractor, electrical contractor, GC non-plumbing prime, plumber + electrician worker limbs) all rule-linked; disclosure + permit twins published.
2026-10-04page:/states/washington/projects/hvac-replacementmanual reviewconfirmedVerified absence of a statewide HVAC license stated; HVAC/R specialty verbatim scope incl. gas piping from service; external-electrical boundary row; Seattle mechanical permit quote.
2026-10-04page:/states/washington/projects/water-heater-replacementmanual reviewconfirmedAppliance-specialty prohibition verbatim; default plumbing-contractor path + PL02 worker limb + like-in-kind electrical alternative; value-conditional disclosure.
2026-10-04page:/states/washington/projects/solar-installationmanual reviewconfirmedFour rows (general 01 positive, residential 02 NOT_DETERMINED with the exclusion quoted, journey worker, HVAC/R solar-thermal alternative); 'no solar license' stated as verified absence.

20 Known conflicts and limitations

Open conflictCONFLICT-WA-001Plumbing contractor renewal & reinstatement fees: WAC 296-400A-045 '$148.10 / $74.00' (eff. 2026-07-01) vs L&I Plumbing Licensing Requirements page '$139.10 / $69.50'
Source AS-WA-WAC-296-400A-045

WAC 296-400A-045 (official rule, WSR 26-10-060 Order 25-30, effective 2026-07-01, read in full 2026-10-04): 'For each issuance, renewal or reregistration of a license … $148.10' (valid two years); 'Reinstatement of a plumbing contractor license $74.00.'

WAC 296-400A-045 — Plumbing contractor and plumber certificate fees
retrieved 2026-10-04
Source BS-WA-LNI-PLUMB-CONTRACTOR

L&I Plumbing Licensing Requirements page (official, read 2026-10-04): application '$148.10', RENEWAL '$139.10' (online/mail/in person), REINSTATEMENT '$69.50'. Arithmetic note: $139.10 × 1.0651 ≈ $148.07 and $69.50 × 1.0651 ≈ $74.03 — the L&I page amounts match the PRE-6.51%-increase values while its own application fee ($148.10) matches the new WAC value, i.e. the page appears to carry stale renewal/reinstatement figures from before the WSR 26-10-060 package took effect 2026-07-01.

L&I — Plumbing Licensing Requirements
retrieved 2026-10-04
Statusneither value published

OPEN — no L&I erratum found. HANDLING: deterministic logic encodes the WAC amounts (fee rows FEE-WA-PLUMB-CONTRACTOR-ISSUE $148.10 and FEE-WA-PLUMB-CONTRACTOR-REINSTATE $74.00; renewal row RENEW-WA-PLUMBING) because the fee is SET BY RULE (RCW 18.106 fees set by rule; WSR 26-10-060 Order 25-30 is the operative amendment) and the authority hierarchy resolves rule > agency page. The L&I figures ($139.10 / $69.50) are preserved verbatim here and published beside every affected fee row — never deleted, never merged, never used as a fact.

Analysis notes

Detected 2026-10-04 while seeding FEE-WA-PLUMB-CONTRACTOR-ISSUE. Material to anyone quoting a Washington plumbing renewal price — exactly why neither side is silently chosen (research §L.3/§Q).

Open conflictCONFLICT-WA-002Is an ELECTRICAL-ONLY contracting business required to hold ch. 18.27 contractor registration? L&I Register page ('all construction contractors') vs L&I Electrical Contractor page ('may also be required' only if the business does other work)
Source AS-WA-LNI-REGISTER

L&I Register as a Contractor (official, read 2026-10-04): 'Washington State requires all construction contractors to register with L&I.' Its two-classifications section lists electrical among trades (with plumbing, elevators, mobile home installation, boilers, asbestos) that have 'additional requirements for education, examination, and licensing' — i.e. registration PLUS the trade credential, implying an electrical-only business still registers.

L&I — Register as a Contractor
retrieved 2026-10-04
Source BS-WA-LNI-ELEC-CONTRACTOR

L&I Electrical Contractor (official, read 2026-10-04): 'If an electrical contracting business does other, non-electrical work, registration as a contractor may also be required.' — implying an electrical-ONLY business may NOT need ch. 18.27 registration. Statutory analysis read 2026-10-04: RCW 18.27.090 contains NO electrical-contractor exemption (all 17 exemptions read); RCW 19.28.041(4)'s exclusivity runs against POLITICAL SUBDIVISIONS, not ch. 18.27; yet RCW 18.106.400(3) shows the Legislature knows how to exempt a trade from registration (it did so for PLUMBING, not electrical).

L&I — Electrical Contractor
retrieved 2026-10-04
Statusneither value published

OPEN — no single authority settles it. HANDLING: the electrical CONTRACTOR LICENSE requirement itself is encoded as positive (rule WA-ELEC-CONTRACTOR, RCW 19.28.041); whether the SAME business must ALSO hold ch. 18.27 registration answers NOT_DETERMINED (rule WA-ELEC-ONLY-REG), with both L&I statements published beside it. Requirement row REQ-WA-ELECTRICAL-ONLY-REG-001 carries confidence 'conflicting'. Never resolved by assumption either way.

Analysis notes

Detected 2026-10-04 while seeding REQ-WA-ELECTRICAL-ONLY-REG-001. Both sides are official L&I publications — exactly why the conflict row exists; the plumbing contrast (18.106.400(3) express exemption) is the strongest statutory signal but not a holding (research §Q).

Open conflictCONFLICT-WA-003The 'Plumbing' specialty contractor classification: WAC 296-200A-016(42) still prints the specialty definition vs L&I 'Beginning July 1, 2021, the specialty plumbing registration was no longer valid' + phase-out rulemaking
Source AS-WA-WAC-296-200A-016

WAC 296-200A-016(42) (official rule text, read in full 2026-10-04) still DEFINES a 'Plumbing' specialty contractor classification, including the sentence 'Plumber certification is required for work within a building per chapter 18.106 RCW' — i.e. the rule as published still contains the specialty among the 63 subsections (history: WSR 09-10-079 / WSR 08-16-091).

WAC 296-200A-016 — Definitions of the specialty contractor classifications
retrieved 2026-10-04
Source BS-WA-LNI-PLUMB-CONTRACTOR

L&I Plumbing Licensing Requirements (official, read 2026-10-04): 'Beginning July 1, 2021, the "specialty plumbing" registration was no longer valid, and general contractors could no longer perform work with a certified plumber. All plumbing contract work must be performed by a new Licensed Plumbing Contractor under Chapter 18.106 RCW.' Plus: 'Phase 3 rule making will begin soon focused on some outstanding items and the phase out of the construction contractor plumbing specialty.' Underlying law: RCW 18.106.020 ('After January 1, 2021, no contractor may employ a person to engage in … plumbing unless the contractor is a licensed plumbing contractor') and RCW 18.106.400 as amended by 2020 c 153.

L&I — Plumbing Licensing Requirements
retrieved 2026-10-04
Statusneither value published

OPEN — phase-3 rulemaking that will delete/conform the WAC text had not been completed at read time. HANDLING: current practice governs — plumbing is NOT encoded as a registrable specialty for new/performative purposes (classification row washington:sp-plumbing-xref carries this conflict; requirement REQ-WA-PLUMBING-SPECIALTY-PHASEOUT-001 confidence 'conflicting'); the WAC definition text is preserved verbatim here and in the classification note. Related NOT_VERIFIED: whether L&I's '63 specialties' currently-registrable set equals the 63 WAC subsections (which include the electrical cross-reference (16) and the phased-out plumbing entry (42)) — no single L&I list page was read.

Analysis notes

Detected 2026-10-04 while seeding classification washington:sp-plumbing-xref. Exactly why both sides live in a conflict row — the WAC text is stale-but-still-published, the L&I page is current practice (research §D.2/§Q).

Limitations of this page
  • Spokane was reachable only through search-result snippets and its official PDF snapshot; its municipal code text is recorded as a disclosed limitation.
  • Withheld on purpose (never guessed): the statewide electrical work-permit fee schedule, local permit fee amounts, city business-licence fees, and the CONFLICT-WA-001 plumbing figures (published only as the conflicting claim).
  • CONFLICT-WA-001 (plumbing renewal amounts), CONFLICT-WA-002 (electrical-only registration) and CONFLICT-WA-003 (the printed plumbing specialty) are OPEN: both sides are shown, neither is silently merged, and the encoded values follow the authority hierarchy (RCW → WAC → L&I → DOR).
  • Rules evaluate only the facts provided; anything unresolved returns NOT_DETERMINED.