States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
South DakotaAvailable
North CarolinaAvailable
TennesseeAvailable
All states →
Projects
167 project guides — open the list

Home Addition — South Dakota license requirements

Verified 2026-10-0911 official sources3 classification relations1 scope assertionIndexation gate: passed

01 The project

The starting point is the work itself — Home Addition in South Dakota. The job determines which trades are involved, and the trades determine which license classifications may be required.

No project components are seeded for this project — we do not invent component lists without evidence.

02 Jurisdiction

This project is evaluated for South Dakota — the no-general-contractor-licence state. The State Electrical Commission (SDCL ch. 36-16) licenses only electrical, and only on its own terms: no dollar threshold, a $10,000 undertaking with liability insurance, biennial June 30 even-year renewal; the State Plumbing Commission (SDCL ch. 36-25) runs the plumbing ladders on annual December 31 licences; and every person entering a construction contract needs DOR's 2% contractor's excise licence. Local permits and any municipal registration are a separate layer under SDCL 36-16-35. South Dakota jurisdiction page.

Limitation — the statute host and the municipal layer are retrieval-limited

sdlegislature.gov serves a JavaScript app shell to this project's fetcher, so SDCL ch. 36-16 and ARSD 20:44 were read IN FULL from DLR's official Wiring Bulletin PDF and ARSD 20:53 from the Commission's LRC-approved rule package PDF; the ch. 36-25 penalty cross-reference (§ 36-25-30) is surfaced from the official rule page and flagged reported. Permit fees, local construction rules and any municipal business-licence rate were not researched and remain LOCAL_AUTHORITY_REQUIRED. Both conflicts ($15/$20 wiring-permit caps; annual vs "2026-2027" specialty term) are published side by side. State requirements are not the complete story for any locality.

03 Trade → license

Relations below are recorded per state — only this jurisdiction's classifications are shown.

Trades involved: no seeded components — trade resolution follows from the classification relations below.

  • Component basis ONSITE-WASTEWATER-INSTALLER — Individual and Small On-site Wastewater System (Septic) Installer (SD Plumbing Commission) confirmed S-SD-PLUMBING-LICENSING rule SD-PLB-EXAM
    A rural addition that is NOT on a public sewer needs the Commission's individual and small on-site wastewater (septic) installer licence — a Commission occupation with a $50 application and $105 annual installer fee, $100 exam (rule SD-PLB-EXAM). This is the page's South Dakota-specific credential.
  • Alternative path ELECTRICAL-CONTRACTOR — Electrical Contractor (SD Electrical Commission) confirmed S-SD-WIRING-BULLETIN rule SD-ELEC-LICENSE
    New circuits and lighting for the addition need the electrical Commission licence (no threshold) — or the owner's exemption if the addition is the owner's own new single-family dwelling they will occupy (SDCL 36-16-15(3), permit first). There is NO state GC licence to hold for the addition itself: local permit + the 2% excise licence fill that layer (rules SD-NO-GC, SD-EXCISE on this page).
  • May require PLUMBING-CONTRACTOR — Plumbing Contractor (SD Plumbing Commission) confirmed S-SD-PLUMBING-DEFAULT rule SD-PLB-LICENSE
    An addition's new fixtures need the plumbing licence stack (contractor/plumber, no threshold) — and where the addition includes a new OWNER-OCCUPIED single-family dwelling, the homeowner paths (36-16-15(3) wiring, SDCL 36-25-17 plumbing) may apply with their permits (rule SD-PLB-LICENSE).

04 Scope

What the official sources say about the work involved — typed assertions, never a boolean "covers". Interpretations are marked as such.

  • Officially included ELECTRICAL-CONTRACTOR Contract Electrical Work Of Any Kind (may_perform) SDCL 36-16-13, 36-16-14 S-SD-WIRING-BULLETIN
    The only class that may contract electrical work of any kind (rule SD-ELEC-CONTRACTING).

05 Requirements

RequirementKindStatementSource
No statewide general contractor licence exists (verified absence)
DLR Boards & Commissions list (dlr.sd.gov, read 2026-10-09) + DOR excise page
licenseSouth Dakota issues NO general contractor, builder or construction-licence credential at state level. Evidence assembled from three official machine-read sources (2026-10-09): (1) DLR's own boards list shows every occupational board it directs — Abstracters, Athletic, Accountancy, Barber, Technical Professions, Cosmetology, ELECTRICAL, PLUMBING, Real Estate — with NO construction contractor board; (2) the only state construction-trade licences are electrical (SDCL ch. 36-16) and plumbing (SDCL ch. 36-25); (3) the Department of Revenue frames the state credential a construction contractor needs as the contractor's EXCISE TAX licence — 'Any person entering into a contract for construction services … must have a South Dakota contractor's tax license.'S-SD-BOARDS
Source S-SD-BOARDS — South Dakota Department of Labor and Regulation (DLR)

DLR — Boards & Commissions under the direction of the South Dakota Department of Labor and Regulation (the absence evidence) — DLR Boards & Commissions list (dlr.sd.gov, read 2026-10-09) + DOR excise page

https://dlr.sd.gov/boards_commissions_councils.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Lists every occupational/professional licensing board DLR directs: Abstracters' Board, Athletic Commission, Board of Accountancy, Board of Barber Examiners, Board of Technical Professions, Cosmetology Commission, ELECTRICAL Commission, PLUMBING Commission, Real Estate Commission — plus Banking, Human Rights, advisory councils and 'Other occupational and professional licensing boards and commissions, including those not under DLR'. NO general/building/roofing/HVAC contractor board exists. Together with the two trade chapters and DOR's excise page this is the evidence base for REQ-SD-NO-GC-LICENSE-001 and REQ-SD-NO-TRADE-LICENSE-001 (both confidence 'reported' — an assembled absence, never a gap).

Plumbing work requires a State Plumbing Commission licence (all seven occupations)
SD Plumbing Commission front page (dlr.sd.gov, read 2026-10-09)
licenseThe Commission's front page verbatim (machine-read 2026-10-09): it 'Licenses all qualified plumbers, sewer and water installer, appliance installers, manufactured and mobile home, underground irrigation installers, water conditioning installers, and individual and small on-site wastewater system (septic) installers within the state,' and 'Administers the state laws and regulations concerning plumbing, sewer and water, appliance installation, manufactured and mobile home, underground irrigation, and water conditioning.' The licensing page enumerates the licence families (contractor/plumber/third-year/apprentice + six specialty families). SDCL 36-25-17 is titled 'License required for plumbing work on property connected to public water or sewer system — Exceptions' (official chapter index, surfaced), and the Homeowner Plumbing page quotes it as the homeowner exception. Violation of ch. 36-25 is a Class 2 misdemeanor per § 36-25-30 (rule cross-reference, surfaced — see REQ-SD-PLB-PENALTY-001).S-SD-PLUMBING-DEFAULT
Source S-SD-PLUMBING-DEFAULT — South Dakota State Plumbing Commission (within DLR)

South Dakota Plumbing Commission — home (duties, occupations licensed, annual Dec 31 expiry) — SD Plumbing Commission front page (dlr.sd.gov, read 2026-10-09)

https://dlr.sd.gov/plumbing/default.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim: 'IMPORTANT NOTICE: Per state law, plumbing licenses expire annually on Dec. 31. To reinstate a plumbing license, a reinstatement form must be submitted with the appropriate fee. Plumbing contractors, plumbers, and 3rd-year apprentice plumbers licensed by exam must provide proof of completion of continuing education in 2025 before a renewal for 2026 license will be processed'; 'The Commission … Licenses all qualified plumbers, sewer and water installer, appliance installers, manufactured and mobile home, underground irrigation installers, water conditioning installers, and individual and small on-site wastewater system (septic) installers within the state'; 'Ensures updating and distribution of the state plumbing code'. Backs the annual renewal (RENEW-SD-PLUMBING), CONFLICT-SD-002 side A and the occupation list.

Plumbing experience ladder: plumber 4 yrs/1,900 h per year; contractor 6 yrs incl. 2 as contractor/plumber
SD Plumbing Commission licensing page (dlr.sd.gov, read 2026-10-09)
experienceCommission licensing page verbatim (machine-read 2026-10-09): plumbing contractor — 'six years' experience as a plumbing contractor, plumber, or plumber's apprentice with at least two of those years as a plumbing contractor or plumber' and 'at least 1,900 hours per year'; plumber — 'four years' experience as an apprentice plumber' at ≥1,900 hours per year (military credit 1 year per 2 served, max 5 years); third-year apprentice plumber — 'two years' experience' at ≥1,900 hours per year (3,800 hours total); specialty contractor — 'one year of experience as a[n] … installer'; installer — 'two years of experience as a … apprentice.'S-SD-PLUMBING-LICENSING
Source S-SD-PLUMBING-LICENSING — South Dakota State Plumbing Commission (within DLR)

South Dakota Plumbing Commission — Licensing Requirements (experience ladders, 2026-2027 mailing) — SD Plumbing Commission licensing page (dlr.sd.gov, read 2026-10-09)

https://dlr.sd.gov/plumbing/licensing.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim experience rules: plumbing contractor — 'six years' experience as a plumbing contractor, plumber, or plumber's apprentice with at least two of those years as a plumbing contractor or plumber' + 'at least 1,900 hours per year'; plumber — 'four years' experience as an apprentice plumber' + 1,900 hours/year, military credit 1 year per 2 served up to 5 years; third-year apprentice — two years/3,800 hours, then may 'work without supervision during their third year and fourth year, only on single family dwellings and only upon satisfactorily passing a state-administered examination'; specialty contractor — one year as an installer; installer — two years as an apprentice; apprentice — application only. OPENS with 'Renewal forms for 2026-2027 specialty licenses were mailed out in April 2026' — CONFLICT-SD-002 side B (against the annual-Dec-31 notice).

Contractor's excise tax licence required for any construction contract (2%)
DOR Contractor's Excise Tax page (dor.sd.gov, read 2026-10-09)
licenseSD Department of Revenue (machine-read 2026-10-09) verbatim: 'Any person entering into a contract for construction services (as defined in Division C of the Standard Industrial Classification Manual of 1987) or engaging in services that include the construction, building, installation, or repair of a fixture to real property must have a South Dakota contractor's tax license. The excise tax imposed on the gross receipts for construction projects is at a rate of 2%.' Two project types apply — qualified utility projects (SDCL 10-46B) and everything else (SDCL 10-46A); a bid factor of 2.041% may be used to collect the full tax; returns are due the 20th of the month (25th if electronic); a prime contractor must issue exemption certificates to its subcontractors, and a subcontractor without one is treated as a prime contractor.S-SD-DOR-EXCISE
Source S-SD-DOR-EXCISE — South Dakota Department of Revenue (DOR)

South Dakota Department of Revenue — Contractor's Excise Tax (the licence every contractor needs) — DOR Contractor's Excise Tax page (dor.sd.gov, read 2026-10-09)

https://dor.sd.gov/businesses/taxes/contractors-excise-tax/

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim: 'Any person entering into a contract for construction services (as defined in Division C of the Standard Industrial Classification Manual of 1987) or engaging in services that include the construction, building, installation, or repair of a fixture to real property must have a South Dakota contractor's tax license. The excise tax imposed on the gross receipts for construction projects is at a rate of 2%.' Two project types: qualified utility projects (SDCL 10-46B) and non-qualified (SDCL 10-46A); returns due the 20th of the month (paper/ACH the 25th electronic); bid factor 2.041%; prime contractors must issue exemption certificates to subcontractors (a subcontractor without a certificate is treated as a prime contractor); owner-occupied dwellings rules; Indian Country guidance to check with the tribe. No licence APPLICATION fee is published on the page — so no excise fee row is seeded (§O).

Owner's exemption: wire your own residence/farmstead — but the permit comes FIRST
DLR Homeowner Wiring page (dlr.sd.gov, read 2026-10-09) + SDCL 36-16-15
exemptionSDCL 36-16-15 verbatim (official Wiring Bulletin, read 2026-10-09): 'No license is required of a person installing electric wiring in or on: (1) The person's own residence, including attached or unattached accessory structures and the parcel of land upon which the structures are situated; (2) The person's own farmstead; (3) The premises of a single-family dwelling unit that is in the process of being constructed if the person owns the premises and intends to occupy [it] …; or (4) The premises of any private, non-habitable property owned by the person …' — but 'Entrance installations in excess of sixty amperes capacity, circuits, or the installation of electrical parts of other apparatus shall be subject to inspection and payment of an inspection fee,' and 'Failure to report this work as required by law is a Class 2 misdemeanor'; 'residence' means a detached owner-occupied single-family dwelling. The Commission's Homeowner Wiring page adds: the owner's exemption (rule 20:44:14:01(12)) requires an approved HOMEOWNER PERMIT BEFORE starting any electrical work, proof of ownership, no commercial/rental property, mobile/modular only on an owner-occupied lot (otherwise a licensed electrical contractor must wire it), 72-hour inspection notice, rough-in + final inspections, and a permit life of three years.S-SD-ELEC-HOMEOWNER
Source S-SD-ELEC-HOMEOWNER — South Dakota State Electrical Commission (within DLR)

SD Electrical Commission — Homeowner Wiring (the owner's exemption, permit-first rule) — DLR Homeowner Wiring page (dlr.sd.gov, read 2026-10-09) + SDCL 36-16-15

https://dlr.sd.gov/electrical/homeowner_wiring.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim: '…defines an "owner's exemption" as an exemption from licensure requirements for an individual owner who is personally installing electrical wiring and fixtures in a residence or farmstead which is owned and resided in or on by the person installing the electrical wiring or fixtures. You MUST have an approved homeowner permit BEFORE starting any electrical work'; 'Homeowners are not allowed to conduct an installation on commercial or rental property with a Homeowner's permit. Homeowners of a mobile home or modular home are not allowed … unless the units are located on an owner-occupied lot … These properties must be wired by a licensed South Dakota electrical contractor'; proof of ownership required; a wiring permit is required when a $30-or-more fee is generated; 72-hour inspection notice; rough-in before covering and a final inspection before occupancy; 'Current life of a permit is three years.' NOTE: the page labels its definition 'SDCL 20:44:14:01(12)', but that citation is an ARSD rule number (the page's own typo) — this seed cites the rule correctly as ARSD 20:44:14:01(12).

Localities may impose MORE STRINGENT requirements than the state chapter
SDCL 36-16-35, 36-16-20 (dlr.sd.gov Wiring Bulletin, read 2026-10-09)
permitSDCL 36-16-35 verbatim (official Wiring Bulletin, read 2026-10-09): 'Nothing in this chapter shall prohibit any municipality, rural electric cooperative, private utility, or political subdivision of the state from making and enforcing more stringent requirements than those set forth in this chapter, and such requirements shall be complied with.' § 36-16-20 adds the flip side: a licensed electrical contractor or Class B electrician need not furnish any additional undertaking for a MUNICIPAL licence. Municipal zoning/planning runs under SDCL ch. 11-4/11-6 (chapter index surfaced).S-SD-WIRING-BULLETIN
Source S-SD-WIRING-BULLETIN — South Dakota State Electrical Commission (within DLR)

SD Electrical Commission — Wiring Bulletin: SDCL ch. 36-16 (Electricians and Electrical Contractors) + ARSD article 20:44, official reproduction — SDCL 36-16-35, 36-16-20 (dlr.sd.gov Wiring Bulletin, read 2026-10-09)

https://dlr.sd.gov/electrical/documents/wiring_bulletin.pdf

Retrieved 2026-10-09 · last verified 2026-10-09

Downloaded and read IN FULL 2026-10-09 (pdftotext, 3,106 lines) — the Commission's official PDF reproduction of the entire electrical statute chapter AND its administrative rules, used because sdlegislature.gov serves a JavaScript shell to the fetcher. Sections credited: § 36-16-1 (licence required; Class 2 misdemeanor), § 36-16-2 (definitions — apprentice, Class B with 36 months, electrical contractor, inspector, journeyman with 4 years, maintenance, 501(d)), § 36-16-13 (contracting licence after examination; exam fee ≤$150, application ≤$100), § 36-16-14 (only an electrical contractor may contract; Class B limited to farm/residential wiring), § 36-16-15 (owner exemption for own residence/farmstead/new owner-occupied single-family; >60 A entrances inspected; failure to report = Class 2 misdemeanor), § 36-16-16 (nine occupational exemptions), § 36-16-17 (biennial fee caps: EC $200, journeyman $80, Class B $200, inspector $120, maintenance $120, 501(d) $120), § 36-16-19 (2 yrs journeyman or 1 yr commercial Class B for the EC), § 36-16-20 ($10,000 undertaking + liability insurance $100k/$300k + $50 deposit; no additional undertaking for a municipal licence), § 36-16-21 (apprentice registration ≤$20, even years, personal supervision), § 36-16-23 (reciprocity), § 36-16-25 (two-year term expiring midnight June 30 of even-numbered years, renewal within 30 days; emergency farm/residential repairs exempt), § 36-16-27 (wiring permit before service connection; rule fee cap $15, late cap $750), § 36-16-30 (inspection fee caps incl. wiring permits ≤$20), § 36-16-33 (five discipline grounds incl. NEC non-compliance and aiding an unlicensed person), § 36-16-34 (Class 2 misdemeanor), § 36-16-34.1 (injunction), § 36-16-35 (localities may impose MORE STRINGENT requirements), § 36-16-38 (reinstatement ≤$100); rules ARSD 20:44:16:03 (exam written from NEC + statutes/rules, 70% pass, 90-day/30-day/90-day windows), 20:44:16:04 ($60 application fee every class), 20:44:16:05 (apprentice supervision), 20:44:16:06 (1 year = 2,000 hours), 20:44:16:15 (biennial fees: EC $200, journeyman $80, Class B $100, inspector $100, 501(d) $80), 20:44:16:16 (temporary journeyman $10), 20:44:16:17 (apprentice registration $20), 20:44:16:18 (reinstatement $50 within one year), 20:44:17:01 (16 h CE per biennium), 20:44:17:02 (≤8 h online per biennium).

06 Rule: SD-PLB-EXAM

Commission exams page verbatim (machine-read 2026-10-09): 'The State Plumbing Commission administers and establishes educational, training, and examination requirements' for plumbing, sewer and water, appliance, on-site wastewater, manufactured & mobile home, underground irrigation and water conditioning occupations. Fees: 'Contractor exams and re-exams $100.00; Plumber/Installer exams and re-exams $100.00; Third-year Plumbing Apprentice exams and re-exams $50.00'; first-timers must apply, pay and be approved before scheduling; exams run in Pierre by advance appointment and in Sioux Falls/Rapid City when 8–10 applicants warrant travel. A third-party 'Pearson VUE' claim found during discovery is CONTRADICTED by this official page and is not used. The plumbing pass mark is not published on the pages read (§O).

OutcomeConclusionCaveats
plumbing-exam-not-passedplumbing_examination_required
  • The plumbing passing score is not published on the pages read — NOT_VERIFIED (research §O).
  • A 'Pearson VUE' claim from a third-party site is contradicted by the official page and not used.
plumbing-exam-passedplumbing_examination_satisfied—

07 Rule: SD-ELEC-LICENSE

SDCL 36-16-1 (machine-read from DLR's official Wiring Bulletin): 'Any person, firm, partnership, limited liability company, or corporation engaged, or offering to engage, in business as an electrical contractor as defined in § 36-16-2 or any person performing the work as defined in this chapter, shall obtain a license from the State Electrical Commission before any person may undertake and perform such work … It is a Class 2 misdemeanor' to do so without compliance. There is NO dollar threshold on any electrical licence — the duty attaches to the work itself.

OutcomeConclusionCaveats
unlicensed-electrical-workelectrical_license_required
  • Who may CONTRACT the work is answered separately by SD-ELEC-CONTRACTING.
  • The Class 2 fine/day range (SDCL 22-6-2) was not machine-read and is NOT published (research §O).
licensed-electrical-workelectrical_license_held
  • Verify the licence is current through the DLR Boards and Commissions portal; the licensee search was linked but not machine-read this phase.
no-electrical-workno_electrical_license_needed_for_this_work
  • Plumbing work on the same project is gated separately (SD-PLB-LICENSE), and the excise licence still applies to the contract (SD-EXCISE).

08 Rule: SD-PLB-LICENSE

SDCL 36-25-17 is titled 'License required for plumbing work on property connected to public water or sewer system — Exceptions' (official chapter index, surfaced — the chapter's full text sits behind sdlegislature.gov's JavaScript shell). The Commission's licensing page (machine-read) enumerates exactly which occupations require licences: plumbers, plumbing contractors, third-year apprentices, sewer and water installers, appliance installers, manufactured and mobile home installers, underground irrigation installers, water conditioning installers, and individual and small on-site wastewater system installers. The Commission's front page states the licence is issued by the State Plumbing Commission; violating SDCL 36-25 is a Class 2 misdemeanor (SDCL 36-25-30, surfaced — confidence `reported`, no dollar/day figures read).

OutcomeConclusionCaveats
unlicensed-plumbing-workplumbing_license_required
  • The statute's full text was not machine-read (SPA shell) — the title and the occupation list are the official evidence (research §O); the penalty cross-reference is surfaced (`reported`).
  • Who may hold which ladder is answered by SD-PLB-EXPERIENCE.
licensed-plumbing-workplumbing_license_held
  • Public rosters are published on the Commission's Consumer Information page (dated lists) — verify status there.
no-plumbing-workno_plumbing_license_needed_for_this_work
  • Electrical work on the same project is gated separately (SD-ELEC-LICENSE), and the excise licence still applies to the contract (SD-EXCISE).

09 Rule: SD-NO-GC

Verified absence: South Dakota issues NO statewide general contractor licence. The DLR boards list (machine-read 2026-10-09) names every occupational board the department directs — Abstracters, Athletic, Accountancy, Barber, Technical Professions, Cosmetology, Electrical, Plumbing, Real Estate — and no construction contractor board exists; the only two construction trades licensed by the state are electrical (SDCL ch. 36-16) and plumbing (SDCL ch. 36-25); DOR's own page frames the credential every South Dakota construction contractor holds as the contractor's EXCISE TAX licence. Confidence `reported`: an absence assembled from three official sources, not a single statute reciting 'no general contractor licence'. A caller reporting an 'SD general contractor licence' holds an electrical or plumbing credential, the excise tax licence, or a municipal licence.

OutcomeConclusionCaveats
no-statewide-gc-licenseno_statewide_general_contractor_license
  • Confidence is `reported` — the absence is assembled from three official sources (research §K), never asserted from a single silent statute.
  • Municipal licensing remains a separate local layer (SD-LOCAL).
claims-state-gc-licenseunrecognized_state_credential
  • The credential is most likely the excise tax licence, an electrical or plumbing licence, or a municipal licence — verify it through DLR's Boards and Commissions portal (boardsandcommissions.sd.gov).

10 Rule: SD-ELEC-EXEMPT

SDCL 36-16-15 (machine-read): 'No license is required of a person installing electric wiring in or on: (1) The person's own residence … (2) The person's own farmstead; (3) The premises of a single-family dwelling unit … in the process of being constructed if the person owns the premises and intends to occupy [it] …; or (4) Any private, non-habitable property owned by the person …' — entrances over 60 A, circuits and parts remain subject to inspection with an inspection fee; failure to report the work is a Class 2 misdemeanor; 'residence' means a detached owner-occupied single-family dwelling. DLR's Homeowner Wiring page (machine-read) adds the rule ARSD 20:44:14:01(12) definition of the owner's exemption: an approved homeowner permit BEFORE starting work, proof of ownership, NO commercial or rental property, mobile/modular only on an owner-occupied lot (otherwise a licensed electrical contractor must do it), 72-hour inspection notice, rough-in + final inspections, permit life three years.

OutcomeConclusionCaveats
not-owner-occupierowner_exemption_not_available—
disallowed-propertyowner_exemption_unavailable_for_property—
owner-permit-not-yet-obtainedhomeowner_permit_required_before_work
  • Failure to report the exempt work is a Class 2 misdemeanor (SDCL 36-16-15).
owner-exemption-appliesowner_electrical_exemption_applies
  • Entrances over 60 A, circuits and parts remain subject to inspection with a fee; failure to report the work is a Class 2 misdemeanor (SDCL 36-16-15).
  • The exemption covers the owner's OWN work only — hiring an electrician means the electrician's licence governs.

11 Rule: SD-LOCAL

SDCL 36-16-35 (machine-read): 'Nothing in this chapter shall prohibit any municipality, rural electric cooperative, private utility, or political subdivision … from making and enforcing more stringent requirements than those set forth in this chapter.' The wiring-permit duty of § 36-16-27 is itself statewide, and building permits are issued locally. NO South Dakota municipal code or permit schedule was opened this phase — every city/county licensing and permit fact is LOCAL_AUTHORITY_REQUIRED and is never guessed (research §K/§O).

OutcomeConclusionCaveats
local-permit-requiredlocal_permit_required
  • No South Dakota municipal code was opened this phase — the specific city's requirements are LOCAL_AUTHORITY_REQUIRED and must be confirmed with the AHJ.
local-license-requiredmunicipal_contractor_license_required
  • Municipal licence scope and fees are LOCAL_AUTHORITY_REQUIRED — no city was read this phase.
no-local-requirements-reportedno_local_requirement_reported
  • SDCL 36-16-35 preserves the locality's POWER to impose stricter requirements — verify with the AHJ before relying on this; this seed read no municipal code (research §O).
  • The statewide wiring permit (SD-ELEC-PERMIT) and the excise licence (SD-EXCISE) still apply on their own terms.

12 The addition stack — no GC licence to hold

QuestionSouth Dakota answerSource
State GC licence for the addition?none exists — verified absence (rule SD-NO-GC)S-SD-BOARDS
New fixtures and supply lines?the plumbing ladders — contractor or plumber, annual Dec 31 (rules SD-PLB-LICENSE, SD-PLB-EXPERIENCE)S-SD-PLUMBING-LICENSING
New lateral or septic?the Commission's on-site wastewater (septic) installer licence — two years as an apprenticeS-SD-PLUMBING-LICENSING
New circuits and service?the electrical stack plus the wiring permit before connection — or the owner-occupant exemptions for one's own new single-familyS-SD-ELEC-HOMEOWNER
The local and tax layers?local permit (LOCAL_AUTHORITY_REQUIRED, rule SD-LOCAL) + the 2% excise licence (rule SD-EXCISE)S-SD-DOR-EXCISE

13 Fees and the credential boundary

QuestionSouth Dakota answerSource
Electrical contractor — application / biennial$60 application + $200 licence (machine-read, ARSD 20:44:16:04/16:15); statutory cap $200S-SD-ELEC-LICENSING
Electrical undertaking$10,000 + $50 deposit, plus $100k/$300k liability insurance (§ 36-16-20)S-SD-ELEC-UNDERTAKING
Plumbing contractor — initial / renewal$275 / $275 annual (ARSD 20:53:12:03); plumber/installer $105S-SD-PLUMBING-LICENSING
Wiring permit$20 each or 20 for $400 — CONFLICT-SD-001 resolves the $15-vs-$20 caps to the current scheduleS-SD-ELEC-FEES
Any state credential for the primary trade?none for roofing, HVAC, solar or general building — verified absences (rules SD-NO-GC, SD-NO-TRADE)S-SD-BOARDS

Evidence

S-SD-ARSD-20-53regulation
South Dakota State Plumbing Commission (within DLR)
ARSD chapter 20:53 — Plumbers (official rule chapter on sdlegislature.gov; surfaced, SPA blocked machine reading)
https://sdlegislature.gov/Rules/Administrative/20:53
verified 2026-10-09retrieved 2026-10-09
S-SD-BOARDSboard page
South Dakota Department of Labor and Regulation (DLR)
DLR — Boards & Commissions under the direction of the South Dakota Department of Labor and Regulation (the absence evidence)
https://dlr.sd.gov/boards_commissions_councils.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-DOR-EXCISEboard page
South Dakota Department of Revenue (DOR)
South Dakota Department of Revenue — Contractor's Excise Tax (the licence every contractor needs)
https://dor.sd.gov/businesses/taxes/contractors-excise-tax/
verified 2026-10-09retrieved 2026-10-09
S-SD-ELEC-DEFAULTboard page
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — home (mission, 2023 NEC adoption, fee-funded)
https://dlr.sd.gov/electrical/default.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-ELEC-FEESfee schedule
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — Fees for Inspections (schedule effective July 1, 2025)
https://dlr.sd.gov/electrical/fees.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-ELEC-HOMEOWNERboard page
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — Homeowner Wiring (the owner's exemption, permit-first rule)
https://dlr.sd.gov/electrical/homeowner_wiring.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-PLUMBING-DEFAULTboard page
South Dakota State Plumbing Commission (within DLR)
South Dakota Plumbing Commission — home (duties, occupations licensed, annual Dec 31 expiry)
https://dlr.sd.gov/plumbing/default.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-PLUMBING-EXAMSboard page
South Dakota State Plumbing Commission (within DLR)
South Dakota Plumbing Commission — Licensing Examinations (commission-run, fee table)
https://dlr.sd.gov/plumbing/exams.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-PLUMBING-LAWSboard page
South Dakota State Plumbing Commission (within DLR)
South Dakota Plumbing Commission — South Dakota Laws & Rules Related to Plumbing
https://dlr.sd.gov/plumbing/laws.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-PLUMBING-LICENSINGboard page
South Dakota State Plumbing Commission (within DLR)
South Dakota Plumbing Commission — Licensing Requirements (experience ladders, 2026-2027 mailing)
https://dlr.sd.gov/plumbing/licensing.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-WIRING-BULLETINbulletin
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — Wiring Bulletin: SDCL ch. 36-16 (Electricians and Electrical Contractors) + ARSD article 20:44, official reproduction
https://dlr.sd.gov/electrical/documents/wiring_bulletin.pdf
verified 2026-10-09retrieved 2026-10-09

Verification

Page last verified
2026-10-09
newest verification date across the sources this page depends on
Policy reviewed
2026-10-09
policy: index — A real South Dakota-specific boundary: an addition needs NO state GC licence (it does not exist) but does need the plumbing stack for its fixtures, the Commission's septic (on-site wastewater installer) licence for a rural lateral, the electrical licence for new circuits — or the owner-occupant exemptions for one's own new single-family — with the local permit and 2% excise licence filling the rest, every claim sourced.
Rules applied
6
SD-ELEC-LICENSE, SD-NO-GC, SD-PLB-LICENSE, SD-ELEC-EXEMPT, SD-PLB-EXAM, SD-LOCAL