States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
South DakotaAvailable
North CarolinaAvailable
TennesseeAvailable
All states →
Projects
167 project guides — open the list

Solar Installation — South Dakota license requirements

Verified 2026-10-097 official sources3 classification relations4 scope assertionsIndexation gate: passed

01 The project

The starting point is the work itself — Solar Installation in South Dakota. The job determines which trades are involved, and the trades determine which license classifications may be required.

ComponentTrade
Solar energy systemSolar
Electrical interconnectionElectrical

02 Jurisdiction

This project is evaluated for South Dakota — the no-general-contractor-licence state. The State Electrical Commission (SDCL ch. 36-16) licenses only electrical, and only on its own terms: no dollar threshold, a $10,000 undertaking with liability insurance, biennial June 30 even-year renewal; the State Plumbing Commission (SDCL ch. 36-25) runs the plumbing ladders on annual December 31 licences; and every person entering a construction contract needs DOR's 2% contractor's excise licence. Local permits and any municipal registration are a separate layer under SDCL 36-16-35. South Dakota jurisdiction page.

Limitation — the statute host and the municipal layer are retrieval-limited

sdlegislature.gov serves a JavaScript app shell to this project's fetcher, so SDCL ch. 36-16 and ARSD 20:44 were read IN FULL from DLR's official Wiring Bulletin PDF and ARSD 20:53 from the Commission's LRC-approved rule package PDF; the ch. 36-25 penalty cross-reference (§ 36-25-30) is surfaced from the official rule page and flagged reported. Permit fees, local construction rules and any municipal business-licence rate were not researched and remain LOCAL_AUTHORITY_REQUIRED. Both conflicts ($15/$20 wiring-permit caps; annual vs "2026-2027" specialty term) are published side by side. State requirements are not the complete story for any locality.

03 Trade → license

Relations below are recorded per state — only this jurisdiction's classifications are shown.

Trades involved: Solar, Electrical.

  • May require ELECTRICAL-CONTRACTOR — Electrical Contractor (SD Electrical Commission) confirmed S-SD-WIRING-BULLETIN rule SD-ELEC-LICENSE
    South Dakota has NO solar credential (verified absence — rule SD-NO-GC on this page): a solar install rides the ELECTRICAL licence stack — the contractor holds the wiring contract, a wiring permit gates connection (SDCL 36-16-27), and the job is inspected under the 2023 NEC (permits on/after 2024-11-12).
  • Component basis JOURNEYMAN-ELECTRICIAN — Journeyman Electrician (SD Electrical Commission) confirmed S-SD-ELEC-LICENSING rule SD-ELEC-EXPERIENCE
    The array's wiring is journeyman-level work under the contracting licence (4 yrs/8,000 h + exam at 70%; apprentices only with personal supervision on site) — rule SD-ELEC-EXPERIENCE.
  • Alternative path CLASS-B-ELECTRICIAN — Class B Electrician (SD Electrical Commission) confirmed S-SD-WIRING-BULLETIN rule SD-ELEC-CONTRACTING
    On a RESIDENTIAL property the Class B contract right (farm/residential wiring only, SDCL 36-16-14) can hold the solar-electrical contract; commercial arrays need the electrical contractor class (rule SD-ELEC-CONTRACTING). The owner's exemption reaches a homeowner wiring their own residence — with the permit first (rule SD-ELEC-EXEMPT).

04 Scope

What the official sources say about the work involved — typed assertions, never a boolean "covers". Interpretations are marked as such.

  • Officially excluded CLASS-B-ELECTRICIAN Commercial Electrical Contracting (may_not_perform) SDCL 36-16-14 S-SD-WIRING-BULLETIN
    The hard commercial boundary — a Class B licence never covers a commercial electrical contract; the electrical contractor class does.
  • Officially included CLASS-B-ELECTRICIAN Farm And Residential Electrical Contracting (may_perform) SDCL 36-16-14 S-SD-WIRING-BULLETIN
    The Class B carve-out — contracting rights exist, but only for farm/residential wiring (rule SD-ELEC-CONTRACTING).
  • Officially excluded JOURNEYMAN-ELECTRICIAN Enter An Electrical Contract With Others (may_not_perform) SDCL 36-16-13, 36-16-14 S-SD-WIRING-BULLETIN
    A journeyman may perform electrical work but may not hold the contract — the distinction that keeps SD from presenting one 'electrician licence' as a contractor licence.
  • Officially included ELECTRICAL-CONTRACTOR Contract Electrical Work Of Any Kind (may_perform) SDCL 36-16-13, 36-16-14 S-SD-WIRING-BULLETIN
    The only class that may contract electrical work of any kind (rule SD-ELEC-CONTRACTING).

05 Requirements

RequirementKindStatementSource
No state roofing, HVAC/refrigeration, solar, general carpentry or painting licence (verified absence)
DLR Boards & Commissions list (dlr.sd.gov, read 2026-10-09)
exemptionBeyond electrical and plumbing, South Dakota licenses NO construction trade at state level: roofing, HVAC/refrigeration, solar installation, framing/carpentry, painting, drywall, masonry, flooring and general building work are unlicensed trades at state level. Evidence (machine-read 2026-10-09): the DLR boards list contains no such board; the Plumbing Commission's occupation list (its front page + licensing page) covers only plumbing-adjacent occupations; the Electrical Commission covers only electrical work; DOR's page routes contractors to the excise tax licence. Any credential for these trades would come from a municipality or county (LOCAL_AUTHORITY_REQUIRED).S-SD-BOARDS
Source S-SD-BOARDS — South Dakota Department of Labor and Regulation (DLR)

DLR — Boards & Commissions under the direction of the South Dakota Department of Labor and Regulation (the absence evidence) — DLR Boards & Commissions list (dlr.sd.gov, read 2026-10-09)

https://dlr.sd.gov/boards_commissions_councils.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Lists every occupational/professional licensing board DLR directs: Abstracters' Board, Athletic Commission, Board of Accountancy, Board of Barber Examiners, Board of Technical Professions, Cosmetology Commission, ELECTRICAL Commission, PLUMBING Commission, Real Estate Commission — plus Banking, Human Rights, advisory councils and 'Other occupational and professional licensing boards and commissions, including those not under DLR'. NO general/building/roofing/HVAC contractor board exists. Together with the two trade chapters and DOR's excise page this is the evidence base for REQ-SD-NO-GC-LICENSE-001 and REQ-SD-NO-TRADE-LICENSE-001 (both confidence 'reported' — an assembled absence, never a gap).

Only an electrical contractor may contract electrical work; Class B is limited to farm/residential
SDCL 36-16-13, 36-16-14 (dlr.sd.gov Wiring Bulletin, read 2026-10-09)
licenseSDCL 36-16-14 verbatim (official Wiring Bulletin, read 2026-10-09): 'No contract, agreement, or understanding with another for the installation of electrical wiring or the installation of electrical parts of other apparatus shall be entered into by anyone not an electrical contractor. Provided, however, that a Class B electrician, as defined in § 36-16-2, is authorized to enter into a contract, undertaking, or agreement for the installation of electrical wiring and his authority under the contract, undertaking or agreement is limited to the installation of farm electrical wiring, residential electrical wiring, the installation of electrical equipment, appliances and apparatus, in relation to said farm and residential wiring.' SDCL 36-16-13 separately licences contracting 'for a fixed sum, price, fee, percentage, or other consideration' after the examination.S-SD-WIRING-BULLETIN
Source S-SD-WIRING-BULLETIN — South Dakota State Electrical Commission (within DLR)

SD Electrical Commission — Wiring Bulletin: SDCL ch. 36-16 (Electricians and Electrical Contractors) + ARSD article 20:44, official reproduction — SDCL 36-16-13, 36-16-14 (dlr.sd.gov Wiring Bulletin, read 2026-10-09)

https://dlr.sd.gov/electrical/documents/wiring_bulletin.pdf

Retrieved 2026-10-09 · last verified 2026-10-09

Downloaded and read IN FULL 2026-10-09 (pdftotext, 3,106 lines) — the Commission's official PDF reproduction of the entire electrical statute chapter AND its administrative rules, used because sdlegislature.gov serves a JavaScript shell to the fetcher. Sections credited: § 36-16-1 (licence required; Class 2 misdemeanor), § 36-16-2 (definitions — apprentice, Class B with 36 months, electrical contractor, inspector, journeyman with 4 years, maintenance, 501(d)), § 36-16-13 (contracting licence after examination; exam fee ≤$150, application ≤$100), § 36-16-14 (only an electrical contractor may contract; Class B limited to farm/residential wiring), § 36-16-15 (owner exemption for own residence/farmstead/new owner-occupied single-family; >60 A entrances inspected; failure to report = Class 2 misdemeanor), § 36-16-16 (nine occupational exemptions), § 36-16-17 (biennial fee caps: EC $200, journeyman $80, Class B $200, inspector $120, maintenance $120, 501(d) $120), § 36-16-19 (2 yrs journeyman or 1 yr commercial Class B for the EC), § 36-16-20 ($10,000 undertaking + liability insurance $100k/$300k + $50 deposit; no additional undertaking for a municipal licence), § 36-16-21 (apprentice registration ≤$20, even years, personal supervision), § 36-16-23 (reciprocity), § 36-16-25 (two-year term expiring midnight June 30 of even-numbered years, renewal within 30 days; emergency farm/residential repairs exempt), § 36-16-27 (wiring permit before service connection; rule fee cap $15, late cap $750), § 36-16-30 (inspection fee caps incl. wiring permits ≤$20), § 36-16-33 (five discipline grounds incl. NEC non-compliance and aiding an unlicensed person), § 36-16-34 (Class 2 misdemeanor), § 36-16-34.1 (injunction), § 36-16-35 (localities may impose MORE STRINGENT requirements), § 36-16-38 (reinstatement ≤$100); rules ARSD 20:44:16:03 (exam written from NEC + statutes/rules, 70% pass, 90-day/30-day/90-day windows), 20:44:16:04 ($60 application fee every class), 20:44:16:05 (apprentice supervision), 20:44:16:06 (1 year = 2,000 hours), 20:44:16:15 (biennial fees: EC $200, journeyman $80, Class B $100, inspector $100, 501(d) $80), 20:44:16:16 (temporary journeyman $10), 20:44:16:17 (apprentice registration $20), 20:44:16:18 (reinstatement $50 within one year), 20:44:17:01 (16 h CE per biennium), 20:44:17:02 (≤8 h online per biennium).

Electrical experience ladder: 4 yrs/8,000 h apprentice → journeyman → +2 yrs/4,000 h (2,000 commercial) → contractor
SD Electrical Commission licensing page (dlr.sd.gov, read 2026-10-09)
experienceCommission licensing page verbatim (machine-read 2026-10-09): 'After completing four years (for a total of 8,000 hours) as a licensed apprentice electrician working under the employment and supervision of an electrical contractor, you will be ready to write the journeyman's exam. It will then take another two years as a licensed journeyman (with a total of 4,000 hours of additional work … including a minimum of 2,000 hours of commercial work) to write the electrical contractor's exam.' 'Experience hours must be licensed in order for the working time to count toward the hours required to take the exams.' Statutory floors (official Wiring Bulletin): journeyman ≥4 years (§ 36-16-2(5)), Class B ≥36 months (§ 36-16-2(2)), electrical contractor ≥2 years as journeyman OR ≥1 year commercial as Class B (§ 36-16-19); ARSD 20:44:16:06 fixes 'one year of experience is 2,000 hours'.S-SD-ELEC-LICENSING
Source S-SD-ELEC-LICENSING — South Dakota State Electrical Commission (within DLR)

SD Electrical Commission — Licensing & Renewals (experience ladder, CE, renewal window) — SD Electrical Commission licensing page (dlr.sd.gov, read 2026-10-09)

https://dlr.sd.gov/electrical/licensing.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim: 'After completing four years (for a total of 8,000 hours) as a licensed apprentice electrician working under the employment and supervision of an electrical contractor, you will be ready to write the journeyman's exam. It will then take another two years as a licensed journeyman (with a total of 4,000 hours of additional work … including a minimum of 2,000 hours of commercial work) to write the electrical contractor's exam'; 'Experience hours must be licensed in order for the working time to count'; renewals for 2026 accepted from April 20, no late fee by June 30; 'Licensees are required to attain 16 hours of continuing education (a minimum of 8 code hours) … Per ARSD 20:44:17:02, only 8 hours of continuing education are allowed for pre-approved online courses'; CE certificates cover July 1, 2024 – June 30, 2026; 'If you are applying for an Electrical Contractor or Class B Electrician License, you must fill out and submit the Electrical Contractor and Class B Electricians' Bond Application'.

Wiring permit required before a new service entrance is connected ($20 per permit, eff. 7/1/2025)
DLR Fees for Inspections schedule eff. 2025-07-01 (dlr.sd.gov, read 2026-10-09)
permitSDCL 36-16-27 verbatim (official Wiring Bulletin, read 2026-10-09): 'No new electrical service entrance except for communication service may be connected for use until a wiring permit has been furnished to the person, firm, or corporation supplying electrical energy certifying that a wiring permit has been obtained in compliance with the rules promulgated by the commission.' The Commission's Fees for Inspections schedule (machine-read 2026-10-09) charges 'Wiring Permits are $20 each or a book of 20 for $400' effective July 1, 2025, with administrative fees of $250 for a late wiring permit, $250 for failure to make corrections, $100 for failure to notify and $250 for not posting permits; a minimum inspection fee of $150 applies and reinspections run $150/hour.S-SD-ELEC-FEES
Source S-SD-ELEC-FEES — South Dakota State Electrical Commission (within DLR)

SD Electrical Commission — Fees for Inspections (schedule effective July 1, 2025) — DLR Fees for Inspections schedule eff. 2025-07-01 (dlr.sd.gov, read 2026-10-09)

https://dlr.sd.gov/electrical/fees.aspx

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim: 'Effective July 1, 2025 — Wiring Permits are $20 each or a book of 20 for $400'; new houses 0–200 A $208, 201–400 A $390, 401+ $390 plus circuits; new services $78–$358 plus circuits by ampacity; circuits installed/altered $65 each; requested inspections and reinspections $150/hour; apartment buildings $150 per unit; mobile homes $100 first unit; RV parks $25 per unit; remodel openings/fixtures $3 each (then $1); motor or special equipment $8; administrative fees — late wiring permit $250, failure to make corrections $250, failure to notify $100, not posting permits $250; minimum inspection fee $150. Backs FEE-SD-ELEC-WIRING-PERMIT-001 and the CONFLICT-SD-001 $20 side.

Contractor's excise tax licence required for any construction contract (2%)
DOR Contractor's Excise Tax page (dor.sd.gov, read 2026-10-09)
licenseSD Department of Revenue (machine-read 2026-10-09) verbatim: 'Any person entering into a contract for construction services (as defined in Division C of the Standard Industrial Classification Manual of 1987) or engaging in services that include the construction, building, installation, or repair of a fixture to real property must have a South Dakota contractor's tax license. The excise tax imposed on the gross receipts for construction projects is at a rate of 2%.' Two project types apply — qualified utility projects (SDCL 10-46B) and everything else (SDCL 10-46A); a bid factor of 2.041% may be used to collect the full tax; returns are due the 20th of the month (25th if electronic); a prime contractor must issue exemption certificates to its subcontractors, and a subcontractor without one is treated as a prime contractor.S-SD-DOR-EXCISE
Source S-SD-DOR-EXCISE — South Dakota Department of Revenue (DOR)

South Dakota Department of Revenue — Contractor's Excise Tax (the licence every contractor needs) — DOR Contractor's Excise Tax page (dor.sd.gov, read 2026-10-09)

https://dor.sd.gov/businesses/taxes/contractors-excise-tax/

Retrieved 2026-10-09 · last verified 2026-10-09

Machine-read 2026-10-09 (HTTP 200). Verbatim: 'Any person entering into a contract for construction services (as defined in Division C of the Standard Industrial Classification Manual of 1987) or engaging in services that include the construction, building, installation, or repair of a fixture to real property must have a South Dakota contractor's tax license. The excise tax imposed on the gross receipts for construction projects is at a rate of 2%.' Two project types: qualified utility projects (SDCL 10-46B) and non-qualified (SDCL 10-46A); returns due the 20th of the month (paper/ACH the 25th electronic); bid factor 2.041%; prime contractors must issue exemption certificates to subcontractors (a subcontractor without a certificate is treated as a prime contractor); owner-occupied dwellings rules; Indian Country guidance to check with the tribe. No licence APPLICATION fee is published on the page — so no excise fee row is seeded (§O).

06 Rule: SD-ELEC-LICENSE

SDCL 36-16-1 (machine-read from DLR's official Wiring Bulletin): 'Any person, firm, partnership, limited liability company, or corporation engaged, or offering to engage, in business as an electrical contractor as defined in § 36-16-2 or any person performing the work as defined in this chapter, shall obtain a license from the State Electrical Commission before any person may undertake and perform such work … It is a Class 2 misdemeanor' to do so without compliance. There is NO dollar threshold on any electrical licence — the duty attaches to the work itself.

OutcomeConclusionCaveats
unlicensed-electrical-workelectrical_license_required
  • Who may CONTRACT the work is answered separately by SD-ELEC-CONTRACTING.
  • The Class 2 fine/day range (SDCL 22-6-2) was not machine-read and is NOT published (research §O).
licensed-electrical-workelectrical_license_held
  • Verify the licence is current through the DLR Boards and Commissions portal; the licensee search was linked but not machine-read this phase.
no-electrical-workno_electrical_license_needed_for_this_work
  • Plumbing work on the same project is gated separately (SD-PLB-LICENSE), and the excise licence still applies to the contract (SD-EXCISE).

07 Rule: SD-ELEC-EXPERIENCE

DLR licensing page verbatim (machine-read 2026-10-09): 'After completing four years (for a total of 8,000 hours) as a licensed apprentice electrician working under the employment and supervision of an electrical contractor, you will be ready to write the journeyman's exam. It will then take another two years as a licensed journeyman (with a total of 4,000 hours of additional work … including a minimum of 2,000 hours of commercial work) to write the electrical contractor's exam' — and 'Experience hours must be licensed in order for the working time to count.' ARSD 20:44:16:06 fixes one year of experience at 2,000 hours. SDCL 36-16-19 sets the statutory floor for the contractor licence: two years as a journeyman OR one year of commercial experience as a Class B electrician; SDCL 36-16-2 sets Class B at 36 months.

OutcomeConclusionCaveats
journeyman-readyready_for_journeyman_examination
  • Unlicensed hours do not count: 'Experience hours must be licensed in order for the working time to count' (DLR).
  • The exam itself is answered by SD-ELEC-EXAM.
journeyman-not-readyapprentice_hours_insufficient
  • Continue registered as an apprentice electrician ($20 registration, SDCL 36-16-21).
electrical-contractor-readyready_for_electrical_contractor_examination
  • The undertaking and insurance conditions attach to this licence (SD-ELEC-BOND, SD-ELEC-INSURANCE).
electrical-contractor-not-readycontractor_experience_not_met—
class-b-experience-metclass_b_experience_met
  • Class B still requires the exam (SD-ELEC-EXAM) and the undertaking/insurance (SD-ELEC-BOND, SD-ELEC-INSURANCE).
class-b-experience-shortclass_b_experience_not_met—

08 Rule: SD-ELEC-CONTRACTING

SDCL 36-16-14 (machine-read): 'No contract … for the installation of electrical wiring … shall be entered into by anyone not an electrical contractor. Provided, however, that a Class B electrician … is authorized to enter into a contract … limited to the installation of farm electrical wiring, residential electrical wiring, the installation of electrical equipment, appliances and apparatus, in relation to said farm and residential wiring.' § 36-16-13 conditions contracting on passing the examination; § 36-16-2 defines the classes (Class B needs 36 months' experience, journeyman 4 years, apprentice registered and personally supervised).

OutcomeConclusionCaveats
electrical-contractor-may-contractmay_contract_electrical_work
  • The undertaking and insurance conditions apply to this licence (SD-ELEC-BOND, SD-ELEC-INSURANCE).
class-b-farm-or-residentialclass_b_may_contract_farm_residential_only
  • Commercial work needs an electrical contractor licence (second outcome).
class-b-outside-scopeclass_b_may_not_contract_commercial_work—
journeyman-or-apprentice-cannot-contractmay_practise_but_not_contract
  • The journeyman may perform the work under an electrical contractor; the CONTRACT still needs the contractor's licence.
no-electrical-credentialmay_not_contract_or_perform_electrical_work—

09 Rule: SD-NO-TRADE

Verified absence: South Dakota issues NO state credential for roofing, HVAC/refrigeration, general building, painting, framing, solar or landscaping contracting. None of these trades appears in the DLR boards list (machine-read 2026-10-09) or in either Commission's occupation list (electrical: SDCL 36-16-2 classes; plumbing: the Commission's front-page occupations). Work in those trades is gated only by local permits and any municipal registration (`LOCAL_AUTHORITY_REQUIRED`), plus the universal excise tax licence (SD-EXCISE) and the electrical/plumbing licences whenever those trades are touched (SD-ELEC-LICENSE, SD-PLB-LICENSE). Confidence `reported` — an assembled absence.

OutcomeConclusionCaveats
no-state-credential-for-this-tradeno_statewide_trade_credential
  • If the project also does electrical or plumbing work, those licences apply regardless of the primary trade (SD-ELEC-LICENSE, SD-PLB-LICENSE).
  • No South Dakota municipal code was opened this phase — city and county requirements are LOCAL_AUTHORITY_REQUIRED (SD-LOCAL).
state-credentialed-tradestate_credentialed_trade—

10 Rule: SD-ELEC-PERMIT

SDCL 36-16-27 (machine-read): 'No new electrical service entrance … may be connected for use until a wiring permit has been furnished' to the energy supplier; the section caps a rule's wiring-permit fee at $15 and late/renewal-failure fees at $750. § 36-16-30(9) (2021 amendment) authorises wiring permits 'not to exceed twenty dollars', and the Commission's fee schedule effective July 1, 2025 (machine-read) charges $20 each or a book of 20 for $400, with a $250 late-permit administrative fee. CONFLICT-SD-001 (the $15 vs $20 cap) is resolved with method: the later § 36-16-30 schedule and the Commission's current $20 charge govern what is collected today.

OutcomeConclusionCaveats
permit-missing-before-connectionwiring_permit_required_before_service_connection
  • The permit's life is three years; rough-in and final inspections are required (DLR homeowner wiring page).
  • Failing to notify or post the permit carries administrative fees of $100–$250 (DLR fees page).
permit-in-placewiring_permit_satisfied—
no-new-service-connectionno_service_connection_permit_gate
  • A wiring permit is still charged for other reportable work (new houses, circuits, remodels) under the DLR fee schedule — verify with the Commission before starting.

11 Rule: SD-EXCISE

DOR verbatim (machine-read 2026-10-09): 'Any person entering into a contract for construction services (as defined in Division C of the Standard Industrial Classification Manual of 1987) or engaging in services that include the construction, building, installation, or repair of a fixture to real property must have a South Dakota contractor's tax license. The excise tax imposed on the gross receipts for construction projects is at a rate of 2%.' Two project types: qualified utility projects (SDCL 10-46B) and non-qualified (SDCL 10-46A); returns are due the 20th of the following month on paper/ACH, the 25th electronically; the bid factor is 2.041%; prime contractors must issue exemption certificates to subcontractors (a subcontractor without a certificate is treated as a prime contractor). No licence application fee is published on the page read (§O) — no fee row is seeded.

OutcomeConclusionCaveats
construction-contract-enteredcontractor_excise_tax_license_required
  • This licence is required REGARDLESS of trade or project size — it sits alongside (never instead of) the electrical and plumbing licences.
  • Prime contractors issue exemption certificates to subcontractors; a subcontractor without one is treated as a prime contractor.
  • No application fee is published on the DOR page read — do not state one (research §O).
no-construction-contractexcise_license_not_triggered
  • Employees performing work under their employer's contract are covered by the employer's licence; verify the actual arrangement before relying on this.
  • Indian Country projects: DOR says to check with the tribe (DOR page).

12 No solar credential — the electrical stack that governs

QuestionSouth Dakota answerSource
Standalone solar licence?none exists — verified absence (rule SD-NO-TRADE)S-SD-BOARDS
Who contracts the install?an electrical contractor; Class B also covers residential roof wiring (rule SD-ELEC-CONTRACTING)S-SD-WIRING-BULLETIN
Journeyman hours?8,000 licensed apprentice hours → journeyman; +4,000 hours (2,000 commercial) → contractor exam (rule SD-ELEC-EXPERIENCE)S-SD-ELEC-LICENSING
Before the system is energised?the wiring permit must be furnished before a new service entrance is connected — $20 (rule SD-ELEC-PERMIT)S-SD-ELEC-FEES
Owner installing on their own home?the owner's exemption applies — permit FIRST, proof of ownership, rough-in and final inspections (rule SD-ELEC-EXEMPT)S-SD-ELEC-HOMEOWNER

13 Fees and the credential boundary

QuestionSouth Dakota answerSource
Electrical contractor — application / biennial$60 application + $200 licence (machine-read, ARSD 20:44:16:04/16:15); statutory cap $200S-SD-ELEC-LICENSING
Electrical undertaking$10,000 + $50 deposit, plus $100k/$300k liability insurance (§ 36-16-20)S-SD-ELEC-UNDERTAKING
Plumbing contractor — initial / renewal$275 / $275 annual (ARSD 20:53:12:03); plumber/installer $105S-SD-PLUMBING-LICENSING
Wiring permit$20 each or 20 for $400 — CONFLICT-SD-001 resolves the $15-vs-$20 caps to the current scheduleS-SD-ELEC-FEES
Any state credential for the primary trade?none for roofing, HVAC, solar or general building — verified absences (rules SD-NO-GC, SD-NO-TRADE)S-SD-BOARDS

Evidence

S-SD-BOARDSboard page
South Dakota Department of Labor and Regulation (DLR)
DLR — Boards & Commissions under the direction of the South Dakota Department of Labor and Regulation (the absence evidence)
https://dlr.sd.gov/boards_commissions_councils.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-DOR-EXCISEboard page
South Dakota Department of Revenue (DOR)
South Dakota Department of Revenue — Contractor's Excise Tax (the licence every contractor needs)
https://dor.sd.gov/businesses/taxes/contractors-excise-tax/
verified 2026-10-09retrieved 2026-10-09
S-SD-ELEC-DEFAULTboard page
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — home (mission, 2023 NEC adoption, fee-funded)
https://dlr.sd.gov/electrical/default.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-ELEC-FEESfee schedule
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — Fees for Inspections (schedule effective July 1, 2025)
https://dlr.sd.gov/electrical/fees.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-ELEC-LICENSINGboard page
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — Licensing & Renewals (experience ladder, CE, renewal window)
https://dlr.sd.gov/electrical/licensing.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-PLUMBING-DEFAULTboard page
South Dakota State Plumbing Commission (within DLR)
South Dakota Plumbing Commission — home (duties, occupations licensed, annual Dec 31 expiry)
https://dlr.sd.gov/plumbing/default.aspx
verified 2026-10-09retrieved 2026-10-09
S-SD-WIRING-BULLETINbulletin
South Dakota State Electrical Commission (within DLR)
SD Electrical Commission — Wiring Bulletin: SDCL ch. 36-16 (Electricians and Electrical Contractors) + ARSD article 20:44, official reproduction
https://dlr.sd.gov/electrical/documents/wiring_bulletin.pdf
verified 2026-10-09retrieved 2026-10-09

Verification

Page last verified
2026-10-09
newest verification date across the sources this page depends on
Policy reviewed
2026-10-09
policy: index — Distinct, honest evidence: NO standalone South Dakota solar credential exists (verified absence), so the page publishes the electrical stack that actually governs a solar install — electrical contractor contract right, journeyman experience ladder, Class B's residential alternative, the wiring permit before connection, the 2023 NEC inspection regime (permits on/after 2024-11-12) and the owner's exemption with its permit-first rule — no tax or interconnection claim beyond DOR's 2% page.
Rules applied
6
SD-EXCISE, SD-ELEC-LICENSE, SD-NO-TRADE, SD-ELEC-PERMIT, SD-ELEC-CONTRACTING, SD-ELEC-EXPERIENCE