Tennessee Contractor License Classifications
Tennessee's 133 seeded classifications sit on one licence and four credential shapes: the Board for Licensing Contractors' single contractor licence carries the whole surface — the building core (BC full down to BC-A/r's course-in-lieu tier), the 34 building categories and the S-specialties, the heavy/highway HC and HRA ladders, the mechanical CMC ladder and the electrical CE family — and three narrower sub-threshold credentials answer the work the line leaves behind: HIC (nine counties, $3,000–$24,999), LLE and LLP (under $25,000). There is no roofer, no solar and no HVAC-only licence — those absences are seeded as absences.
01 One licence — what is actually classified
- One licence, a code, and a dollar size — every classification above the line is a code on the same contractor's licence; the licence's monetary limit (10 × the lesser of working capital or net worth, unlimited at $300,000 in both) is what scales each code. The limit is chosen by balance sheet, so it travels with the licence rather than multiplying rows. S-TN-BLC-CONTRACTOR
- Above $25,000 only — every one of these classifications exists for work at or above the threshold; below the line Tennessee issues no state contractor credential at all. S-TN-BLC-CONTRACTOR S-TN-BLC-CONTRACTOR
- The outline carries exam flags — trade exams on BC, CE, CE-A, CE-B, CE-H, CE-J (>70 volts), CE-K and CE-L; no trade exam on CE-C conduit, CE-D alarms up to 70 volts, CE-E signs, CE-F telephone, CE-G cable TV or CE-I temperature controls — and everyone still owes the Business & Law exam. S-TN-BLC-EXAM
- The sub-threshold trio has its own gates — HIC only in the nine adopting counties at $3,000–$24,999, LLE and LLP only below $25,000 in Fire Prevention localities (LLP with the $500 maintenance carve-out), and CMC-A taking plumbing at $25,000+. S-TN-BLC-HIC S-TN-BLC-LLE S-TN-BLC-LLP S-TN-BLC-EXAM
- Verified absence — no standalone roofer, solar, HVAC-only, painter or handyman classification exists anywhere in the state (roofing is BC-21 under the building licence, solar is CE or LLE electrical work, HVAC is mechanical under CMC), and there is no electrical or plumbing board to carry them (confidence reported). S-TN-BLC-OUTLINE S-TN-BLC-OUTLINE S-TN-BLC-OUTLINE S-TN-TDCI-BOARDS
02 Board for Licensing Contractors — the building surface: BC, the 34 building categories, masonry and the S-specialties
| Code | Credential | Classification | Official scope | Citation | Source |
|---|---|---|---|---|---|
| BC-10 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Ornamental and Miscellaneous Metal | "Ornamental and Miscellaneous Metal" — building sub-category BC-10 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-11 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Painting and Interior Decorating | "Painting and Interior Decorating" — building sub-category BC-11 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-12 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Roof Decks | "Roof Decks" — building sub-category BC-12 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-A | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Limited Building Contractor — one-to-four-family residences | Outline §2 verbatim: "Residential work limited to one-, two-, three-, and four-family residences not exceeding three stories, plus accessory use structures." Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-B | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Building Contractor — commercial and public buildings | Outline §2 verbatim: "Commercial work, including buildings for public use and occupancy, residential construction with more than four units, or buildings exceeding three stories." Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-b(sm) | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Small Commercial Building Contractor | Outline §2 verbatim: "Small commercial work, subject to a monetary limit not exceeding $1,500,000. Full BC-B exam required to move above that cap." Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-C | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Building Contractor — industrial buildings and structures | Outline §2 verbatim: "Industrial buildings and structures used for industrial production and service, such as manufacturing plants." Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Acoustical Treatments | "Acoustical Treatments" — building sub-category BC-1 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Carpentry, Framing and Millwork | "Carpentry, Framing and Millwork" — building sub-category BC-2 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Drywall | "Drywall" — building sub-category BC-3 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Floor Covering | "Floor Covering" — building sub-category BC-4 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-5 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Foundations | "Foundations" — building sub-category BC-5 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-6 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Glass, Window and Door Construction | "Glass, Window and Door Construction" — building sub-category BC-6 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-7 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Institutional and Recreational Equipment | "Institutional and Recreational Equipment" — building sub-category BC-7 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-8 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Lath, Plaster, Stucco and Aluminum Siding | "Lath, Plaster, Stucco and Aluminum Siding" — building sub-category BC-8 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-9 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Masonry under $100K (see Masonry Section) | "Masonry under $100K (see Masonry Section)" — building sub-category BC-9 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-14 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Special Coatings and Waterproofing | "Special Coatings and Waterproofing" — building sub-category BC-14 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-15 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Tile, Terrazzo and Marble | "Tile, Terrazzo and Marble" — building sub-category BC-15 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-16 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Insulation | "Insulation" — building sub-category BC-16 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-17 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Elevators, Escalators and Dumbwaiters | "Elevators, Escalators and Dumbwaiters" — building sub-category BC-17 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-18 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Erection and Fabrication of Structural Steel | "Erection and Fabrication of Structural Steel" — building sub-category BC-18 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-19 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Concrete | "Concrete" — building sub-category BC-19 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-20 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Sheet Metal | "Sheet Metal" — building sub-category BC-20 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-22 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Conveyors | "Conveyors" — building sub-category BC-22 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-23 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Sandblasting | "Sandblasting" — building sub-category BC-23 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-24 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Golf Course | "Golf Course" — building sub-category BC-24 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-25 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Tennis Courts | "Tennis Courts" — building sub-category BC-25 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-26 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Swimming Pools | "Swimming Pools" — building sub-category BC-26 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-27 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Outdoor Advertising | "Outdoor Advertising" — building sub-category BC-27 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-28 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Excavation | "Excavation" — building sub-category BC-28 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-29 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Landscaping | "Landscaping" — building sub-category BC-29 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-30 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Fencing | "Fencing" — building sub-category BC-30 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-32 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Millwright | "Millwright" — building sub-category BC-32 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-33 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Irrigation | "Irrigation" — building sub-category BC-33 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-34 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Scaffolding | "Scaffolding" — building sub-category BC-34 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Solar Panel Installation | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Solar Panel Installation | "S-Solar Panel Installation" — specialty classification in the "Equipment / Specialty Systems / Miscellaneous" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Data Cable/Line | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Data Cable/Line | "S-Data Cable/Line" — specialty classification in the "Electrical / Low Voltage / Communications / Controls" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-F Mold Remediation | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Mold Remediation | "S-F Mold Remediation" — specialty classification in the "Agricultural / Environmental Specialty" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Awning & Canopy Installation | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Awning & Canopy Installation | "S-Awning & Canopy Installation" — specialty classification in the "Architectural / Building" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Metal Building | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Metal Building | "S-Metal Building" — specialty classification in the "Architectural / Building" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Pole Barn | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Pole Barn | "S-Pole Barn" — specialty classification in the "Agricultural / Environmental Specialty" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Fire Stopping | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Fire Stopping | "S-Fire Stopping" — specialty classification in the "Coatings / Linings / Waterproofing / Surface Treatment" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| S-Generator Equipment Install | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Generator Equipment Install | "S-Generator Equipment Install" — specialty classification in the "Equipment / Specialty Systems / Miscellaneous" group (outline §5, verbatim). Specialty classifications do not require a trade exam and are intended for work that does not fall within the standard building, utility, mechanical, electrical, or heavy construction categories. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-13 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Site and Subdivision Development | "Site and Subdivision Development" — building sub-category BC-13 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Building Contractor (full classification) | Outline §2 verbatim: "Full building construction; covers BC-A, B, C and all 34 building categories for residential, commercial, and industrial work, plus MU-B-related utility and sewer system work." Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-A/r | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Restricted Residential Limited License (course in lieu of exam) | Outline §2 verbatim: "Restricted single-family residential license. Monetary limit cannot exceed $125,000. No 10% bid tolerance. No joint ventures. Exams required to increase limit or add classifications." Exam: Approved course from a state community college in lieu of exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| BC-31 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Demolition | "Demolition" — building sub-category BC-31 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| LMC | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Licensed Masonry Contractor | Outline §4 verbatim: "The Licensed Masonry Contractor classification requires a trade exam. BC-9 may be used for masonry work below $100,000, including materials and labor. When the masonry portion exceeds $100,000, the contractor performing that work must hold a masonry license, including when the work is performed as a subcontractor." | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| Medical Gas Piping | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Medical Gas Piping (specialty classification) | Outline §11 verbatim: "Medical gas piping is a specialty classification for installation, maintenance, and repair work regulated under T.C.A.§ 68-11-253. This classification does not require a trade exam; however, board certification is required. The minimum certification qualifications are those established by the American Medical Gas Institute (AMGI) or the Piping Industry Progress and Education Trust Fund (PIPE). Certification requires at least thirty-two (32) hours of training, including eight (8) hours in brazing, and must include training based on the most current edition of NFPA 99C for gas and vacuum systems." | T.C.A. § 68-11-253 | S-TN-BLC-OUTLINE |
| BC-21 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Roofing over $25K, including gutters and vinyl siding | "Roofing over $25K, including gutters and vinyl siding" — building sub-category BC-21 (outline §3, verbatim). No trade exam for up to five (5) building categories; the Business and Law exam and experience are still required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
BC is the full building credential — "covers BC-A, B, C and all 34 building categories for residential, commercial, and industrial work" — while BC-A stops at one-to-four-family residences up to three stories and BC-A/r trades the trade exam for an approved course on a hard $125,000 cap with no 10% bid tolerance and no joint ventures. BC-b(sm) is the small-commercial lane (the outline caps it at $1,500,000 while the contractor page annotates the small-commercial exam "Projects less than $750,000" — CONFLICT-TN-001 keeps both, unresolved). BC-A and BC-A/r are the only codes owing continuing education: 8 hours per biennium. S-TN-BLC-CONTRACTOR
03 Board for Licensing Contractors — heavy, highway and utility work: HC, HRA and the MU ladder
| Code | Credential | Classification | Official scope | Citation | Source |
|---|---|---|---|---|---|
| HRA-B.2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Hot and Cold Mix Asphalt (HRA-B.2) | Outline §7 verbatim: "Hot and Cold Mix Asphalt" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-B.3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Surface Treatment Asphalt (HRA-B.3) | Outline §7 verbatim: "Surface Treatment Asphalt" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-B.4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Concrete Paving (HRA-B.4) | Outline §7 verbatim: "Concrete Paving" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Bridges and Culverts (HRA-C) | Outline §7 verbatim: "Bridges and Culverts" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Painting (HRA-C.1) | Outline §7 verbatim: "Painting" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Repair (HRA-C.2) | Outline §7 verbatim: "Repair" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Demolition (HRA-C.3) | Outline §7 verbatim: "Demolition" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-D-2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Hot and Cold Mix Asphalt (MU-D-2) | Outline §8 verbatim: "Hot and Cold Mix Asphalt" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-D-3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Surface Treatment Asphalt (MU-D-3) | Outline §8 verbatim: "Surface Treatment Asphalt" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-D-4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Concrete Pavement (MU-D-4) | Outline §8 verbatim: "Concrete Pavement" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-A | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Marine (HC-A) | Outline §6 verbatim: "Marine: wharves, docks, harbor improvements and terminals" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-B | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Tunnel and shaft (HC-B) | Outline §6 verbatim: "Tunnel and shaft" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-C | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Energy and power plants (HC-C) | Outline §6 verbatim: "Energy and power plants" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-D | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Dams, dikes, levees and canals (HC-D) | Outline §6 verbatim: "Dams, dikes, levees and canals" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-E | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Mining surface and underground (HC-E) | Outline §6 verbatim: "Mining surface and underground" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-F | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Oil field construction (HC-F) | Outline §6 verbatim: "Oil field construction" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-G | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Oil refineries (HC-G) | Outline §6 verbatim: "Oil refineries" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-H | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Storm damage cleanup (HC-H) | Outline §6 verbatim: "Storm damage cleanup" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-I | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Landfill construction (HC-I) | Outline §6 verbatim: "Landfill construction" No trade exam is required for HC classifications. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Structural Steel Erection (HC-1) | Heavy Construction Sub-Category "HC-1" — outline §6 verbatim: "Structural Steel Erection" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Tower and Stack Construction (HC-2) | Heavy Construction Sub-Category "HC-2" — outline §6 verbatim: "Tower and Stack Construction" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Foundation Construction, Pile Driving, Foundation Drilling and Stabilization (HC-3) | Heavy Construction Sub-Category "HC-3" — outline §6 verbatim: "Foundation Construction, Pile Driving, Foundation Drilling and Stabilization" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Demolition and Movement of Structures (HC-4) | Heavy Construction Sub-Category "HC-4" — outline §6 verbatim: "Demolition and Movement of Structures" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-5 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Clearing, Grubbing, Snagging and Rip Rap (HC-5) | Heavy Construction Sub-Category "HC-5" — outline §6 verbatim: "Clearing, Grubbing, Snagging and Rip Rap" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-6 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Slipform Concrete Structures (HC-6) | Heavy Construction Sub-Category "HC-6" — outline §6 verbatim: "Slipform Concrete Structures" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-7 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Rigging and Crane Rigging (HC-7) | Heavy Construction Sub-Category "HC-7" — outline §6 verbatim: "Rigging and Crane Rigging" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HC-8 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Welding (HC-8) | Heavy Construction Sub-Category "HC-8" — outline §6 verbatim: "Welding" Sub-categories apply across all HC areas; no trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-A | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Grading and Drainage (HRA-A) | Outline §7 verbatim: "Grading and Drainage" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-B | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Base and Paving (HRA-B) | Outline §7 verbatim: "Base and Paving" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-B.1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Base Construction (HRA-B.1) | Outline §7 verbatim: "Base Construction" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.5 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Gunite (HRA-C.5) | Outline §7 verbatim: "Gunite" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.6 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Cofferdam (HRA-C.6) | Outline §7 verbatim: "Cofferdam" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.7 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Steel Erection (HRA-C.7) | Outline §7 verbatim: "Steel Erection" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-D | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Railroad Construction and Related Items (HRA-D) | Outline §7 verbatim: "Railroad Construction and Related Items" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Miscellaneous and Specialty Items (HRA-E) | Outline §7 verbatim: "Miscellaneous and Specialty Items" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Traffic Safety (HRA-E.1) | Outline §7 verbatim: "Traffic Safety" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.1(a) | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Pavement Markers (HRA-E.1(a)) | Outline §7 verbatim: "Pavement Markers" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.1(b) | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Signing (HRA-E.1(b)) | Outline §7 verbatim: "Signing" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.1(c) | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Guardrail and Fencing (HRA-E.1(c)) | Outline §7 verbatim: "Guardrail and Fencing" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.1(d) | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Attenuators, Signalization and Roadway Lighting (HRA-E.1(d)) | Outline §7 verbatim: "Attenuators, Signalization and Roadway Lighting" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Landscaping (HRA-E.2) | Outline §7 verbatim: "Landscaping" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Pavement Rehabilitation (HRA-E.3) | Outline §7 verbatim: "Pavement Rehabilitation" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Well Drilling (HRA-E.4) | Outline §7 verbatim: "Well Drilling" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-E.5 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Miscellaneous Concrete (HRA-E.5) | Outline §7 verbatim: "Miscellaneous Concrete" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-A | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Underground piping (MU-A) | Outline §8 verbatim: "Underground piping" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-A.1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Gas distribution and transmission lines (MU-A.1) | Outline §8 verbatim: "Gas distribution and transmission lines" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-A.2 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Sewer lines (MU-A.2) | Outline §8 verbatim: "Sewer lines, storm drains, rehabilitation and structures" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-A.3 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Waterlines (MU-A.3) | Outline §8 verbatim: "Waterlines" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-A.4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Underground conduit (MU-A.4) | Outline §8 verbatim: "Underground conduit" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-B | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Water and sewer systems (MU-B) | Outline §8 verbatim: "Water and sewer systems" Exam: BC-B or BC exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-C | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Grading and drainage (MU-C) | Outline §8 verbatim: "Grading and drainage" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-D | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Base and paving (MU-D) | Outline §8 verbatim: "Base and paving" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-D-1 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Base construction (MU-D-1) | Outline §8 verbatim: "Base construction" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| HRA-C.4 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Bridge Deck Overlay (Sealant) (HRA-C.4) | Outline §7 verbatim: "Bridge Deck Overlay (Sealant)" HRA classifications do not require a trade exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Municipal and utility construction generally (MU) | Outline §8 verbatim: "Municipal and utility construction generally, including underground piping, water and sewer plants and disposal, grading, drainage, and paving." Exam: BC-B or BC exam for full MU / MU-B. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| MU-D-5 | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Miscellaneous Concrete including sidewalks (MU-D-5) | Outline §8 verbatim: "Miscellaneous Concrete including sidewalks, driveways, curb, gutter and box culverts" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
04 Board for Licensing Contractors — mechanical: CMC and the CMC-A…CMC-J ladder (CMC-A is plumbing at $25,000+)
| Code | Credential | Classification | Official scope | Citation | Source |
|---|---|---|---|---|---|
| CMC-A | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Plumbing and Gas Piping (CMC-A) | Outline §9 verbatim: "Plumbing and Gas Piping" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-B | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Process Piping (CMC-B) | Outline §9 verbatim: "Process Piping" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-C | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | HVAC, Refrigeration and Gas Piping; Solar HVAC (Geothermal) (CMC-C) | Outline §9 verbatim: "HVAC, Refrigeration and Gas Piping; Solar HVAC (Geothermal)" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-D | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Sprinklers and Fire Protection (CMC-D) | Outline §9 verbatim: "Sprinklers and Fire Protection" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-E | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Insulation of Mechanical Work (CMC-E) | Outline §9 verbatim: "Insulation of Mechanical Work" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-F | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Pollution Control (CMC-F) | Outline §9 verbatim: "Pollution Control" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-G | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Pneumatic Tube Systems (CMC-G) | Outline §9 verbatim: "Pneumatic Tube Systems" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-H | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Temperature Controls (Pneumatic) (CMC-H) | Outline §9 verbatim: "Temperature Controls (Pneumatic)" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-I | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Boiler Construction and Repairs (CMC-I) | Outline §9 verbatim: "Boiler Construction and Repairs" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC-J | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Fuel Gas Piping and Systems (CMC-J) | Outline §9 verbatim: "Fuel Gas Piping and Systems" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CMC | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Full Mechanical Contracting (CMC) | Outline §9 verbatim: "Full Mechanical Contracting" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
Below $25,000 plumbing answers to the LLP in Fire Prevention localities and to the local plumbing inspector elsewhere; at $25,000 or more it is CMC-A — Plumbing and Gas Piping on the contractor licence, with Board pre-approval of the exam (the $50 fee) and three years' experience. The CMC-B…CMC-J codes cover the rest of the mechanical ladder. S-TN-BLC-EXAM
05 Board for Licensing Contractors — electrical: CE and the CE-A…CE-L family (the whole state's electrical licensing)
| Code | Credential | Classification | Official scope | Citation | Source |
|---|---|---|---|---|---|
| CE | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Full Electrical Contracting (CE) | Outline §10 verbatim: "Full Electrical Contracting" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-A | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Electrical transmission lines (CE-A) | Outline §10 verbatim: "Electrical transmission lines" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-B | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Electrical Work for Buildings and Structures (CE-B) | Outline §10 verbatim: "Electrical Work for Buildings and Structures" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-C | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Underground electrical conduit installation (CE-C) | Outline §10 verbatim: "Underground electrical conduit installation" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-D | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Sound and intercom systems, fire detection, signal and burglar alarm systems, and security systems up to 70 volts (CE-D) | Outline §10 verbatim: "Sound and intercom systems, fire detection, signal and burglar alarm systems, and security systems up to 70 volts" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-E | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Electrical signs (CE-E) | Outline §10 verbatim: "Electrical signs" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-F | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Telephone lines and ducts (CE-F) | Outline §10 verbatim: "Telephone lines and ducts" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-G | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Cable TV (CE-G) | Outline §10 verbatim: "Cable TV" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-H | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Substations (CE-H) | Outline §10 verbatim: "Substations" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-J | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Fire detection, signal and burglar alarm, and security systems with conduit and wiring above 70 volts (CE-J) | Outline §10 verbatim: "Fire detection, signal and burglar alarm, and security systems with conduit and wiring above 70 volts" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-K | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Roadway lighting, attenuators and signalization (CE-K) | Outline §10 verbatim: "Roadway lighting, attenuators and signalization" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-L | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Electric meter installation (CE-L) | Outline §10 verbatim: "Electric meter installation" Exam: Required. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
| CE-I | Contractor's Licence (TN Board for Licensing Contractors, T.C.A. Title 62 ch. 6 — every licence carries a classification AND a monetary limit; $25,000 threshold for prime contractors, enumerated subcontractors and construction managers; Business & Law exam for all new licences plus trade exams where the classification outline requires; monetary limit = 10 × the lesser of working capital or net worth, $300,000 in both = unlimited; reviewed CPA financial statement ≤ $3,000,000 / audited above, OR a surety bond ≥ 50% of the limit (option since 2026-07-01, Rule 0680-01-.32 updated 2025-11-18); GL + workers' compensation; biennial renewal — last day of the 24th month, 12-month grace at $20/month; CE 8 h only for BC-A/BC-A/r) | Electrical temperature controls (CE-I) | Outline §10 verbatim: "Electrical temperature controls" Exam: No exam. | T.C.A. § 62-6-112; Rule 0680-01-.12; Rule 0680-01-.16 (Appendix A) | S-TN-BLC-OUTLINE |
Tennessee has no electrical commission: electrical primes and subcontractors are licensed through this licence's CE family above $25,000 (CE-B buildings, CE-H substations, CE-J alarms above 70 volts, CE-K roadway lighting and CE-L meter installation all carry trade exams; CE-D alarms up to 70 volts and the conduit, sign, telephone, cable-TV and temperature-control codes do not), and the LLE answers the sub-$25,000 band in Fire Prevention localities. S-TN-TDCI-BOARDS
06 Below the line — the three sub-threshold credentials: Home Improvement, Limited Licensed Electrician, Limited Licensed Plumber
| Code | Credential | Classification | Official scope | Citation | Source |
|---|---|---|---|---|---|
| LLE | Limited Licensed Electrician (LLE) — individual trade licence for work LESS than $25,000 per project, only in localities that use the Division of Fire Prevention for permits or inspections (T.C.A. §§ 62-6-102(d), 68-102-150); LLE trade exam via Prov; $50 initial / $50 renewal, 3-month grace, $80 reinstatement; § 62-6-130: an LLE 'is not a contractor' and may not imply contractor standing | Limited Licensed Electrician | Licence page verbatim: "The Limited Licensed Electrician (LLE) license is only required by electricians performing work in a municipality utilizing the Division of Fire Prevention for permits or inspections and covers work less than $25,000 per project. Always first check with your local government to see if they accept the LLE license or if they have a local licensing requirement for permits and inspections. The LLE license is issued to individuals passing the LLE trade exam." | T.C.A. §§ 62-6-102(d), 62-6-130; T.C.A. § 68-102-150 | S-TN-BLC-LLE |
| LLP | Limited Licensed Plumber (LLP) — individual trade licence for work LESS than $25,000 per project in localities that use the Division of Fire Prevention; 'general maintenance work that is less than $500 is exempt' (T.C.A. § 62-6-403); one year of plumbing experience required unless engaged in plumbing before 2006-01-01 (§ 62-6-406, which also preserves municipal and county plumbing licences); LLP trade exam via Prov; $75 initial / $50 renewal, 3-month grace | Limited Licensed Plumber | Licence page verbatim: "The Limited Licensed Plumber (LLP) license is only required by plumbers performing work in a municipality utilizing the Division of Fire Prevention for permits or inspections and covers work less than $25,000 per project. Note that general maintenance work that is less than $500 is exempt from the LLP license. Always first check with your local government …" | T.C.A. §§ 62-6-403, 62-6-406, 62-6-409 | S-TN-BLC-LLP |
| HIC | Home Improvement Contractor Licence (TN Board for Licensing Contractors, T.C.A. § 62-6-501 et seq. — residential remodeling $3,000–$24,999, ONLY in the nine counties that adopted the law: Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford, Shelby; $10,000 surety bond (or cash/property bond or irrevocable letter of credit), general liability + workers' compensation, remodeling experience; $250 initial / $200 renewal, 3-month grace at $10/month) | Home Improvement Contractor | Licence page verbatim: "A Home Improvement license is required for residential remodeling projects from $3,000 to $24,999; however, this only applies to the counties adopting the law. Currently, this applies to the following counties: Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford, and Shelby." The statutory floor excludes contracts of $3,000 or less (§ 62-6-501(4)(A)). | T.C.A. §§ 62-6-501, 62-6-502 | S-TN-BLC-HIC |
The HIC credential only binds the counties that adopted the Home Improvement law — elsewhere it buys no state authority; LLE and LLP exist only in localities served by the Division of Fire Prevention, and both stop at $25,000. Every one of the three renews on the Board's fee schedule with no continuing education at all. S-TN-BLC-HIC
07 Deterministic scope limits
- tn:limited-licensed-plumber — plumbing work at or above 25000 (T.C.A. §§ 62-6-403, 62-6-112) S-TN-BLC-LLPThe plumbing ladder: LLP below the line, CMC-A above it — one Board, two rungs (rule TN-CMC-A).
- tn:home-improvement-contractor — residential work in non adopting counties (T.C.A. § 62-6-501 et seq.) S-TN-BLC-HICThe county condition published as an exclusion so the pages never present the HIC as statewide (research §F).
- tn:home-improvement-contractor — home improvement 3000 or less (T.C.A. § 62-6-501(4)(A)) S-TN-TCA-62-6The statutory floor under the HIC window — at or below $3,000 the licence does not reach.
- tn:home-improvement-contractor — residential work at or above 25000 (T.C.A. §§ 62-6-501, 62-6-103) S-TN-BLC-HICWhere the HIC window ends, the $25,000 line's contractor licensing begins — the two regimes abut without overlap.
- tn:limited-licensed-electrician — electrical work at or above 25000 (T.C.A. § 62-6-102(d)) S-TN-BLC-LLEThe hard ceiling — at $25,000 the LLE stops and CE (with the contractor licence behind it) takes over.
- tn:limited-licensed-electrician — acting as a contractor (T.C.A. § 62-6-130) S-TN-TCA-62-6The statutory boundary that keeps the LLE from being mistaken for a small contractor licence — an individual trade credential, never a contracting one.
- tn:limited-licensed-plumber — sub threshold plumbing work (T.C.A. §§ 62-6-403, 62-6-406) S-TN-BLC-LLPTwo price lines in one credential: the $25,000 ceiling and the $500 general-maintenance exemption inside it (rule TN-LLP).
- tn:bc-a — one to four family residential work (T.C.A. § 62-6-112; Rule 0680-01-.16 (Appendix A)) S-TN-BLC-OUTLINEThe residential contractor rung above BC-A/r — the credential a home-addition prime at ≥$25,000 holds.
- tn:bc-21 — roofing work including gutters and vinyl siding (T.C.A. § 62-6-102(4)) S-TN-BLC-OUTLINERoofing's whole state story in one assertion: a sub-category, a $25,000 sub rule and the HIC window below it (rule TN-ROOFING-SUB).
- tn:lmc — masonry portions above 100000 (T.C.A. § 62-6-102(4); Rule 0680-01-.16 (Appendix A)) S-TN-BLC-OUTLINEThe ONE sub-portion with its own threshold above the general $25,000 line — prime or sub, the $100,000 masonry portion triggers LMC.
- tn:cmc-a — plumbing and gas piping at or above 25000 (T.C.A. § 62-6-112) S-TN-BLC-OUTLINEThe ≥$25,000 plumbing rung — three sequential gates, all official (rule TN-CMC-A).
- tn:ce — electrical work at or above 25000 (T.C.A. § 62-6-102(4); Rule 0680-01-.16 (Appendix A)) S-TN-BLC-OUTLINEElectrical has no separate board but IS fully licensed through this one licence — the prime-and-sub sentence is the enforcement hook.
- tn:s-solar-panel-installation — solar panel installation (T.C.A. § 62-6-112; Rule 0680-01-.16 (Appendix A)) S-TN-BLC-OUTLINEThe honest solar answer: a no-exam classification on the ordinary licence, with the electrical work separately governed (rule TN-CE).
- tn:bc-a-r — work beyond the restricted edges (T.C.A. §§ 62-6-103(a)(1), 62-6-112) S-TN-BLC-OUTLINEBC-A/r is the ONLY classification without the 10% bid tolerance — the boundary must render wherever the restricted licence is recommended.
- home-addition — owner built single family residence on own land (T.C.A. §§ 62-6-103(a)(2), 62-6-120(a)(2)) S-TN-TCA-62-6The owner's build-anyway path with BOTH edges published: the individual-use limit and the two-year presumption (rule TN-OWNER-EXEMPT).
- tn:home-improvement-contractor — residential remodeling 3000 to 24999 (T.C.A. § 62-6-501 et seq.) S-TN-BLC-HICThe ONLY state licensing layer inside the $25,000 line for general residential work — gated by county adoption (rule TN-HIC).
- tn:bc-a-r — single family residential work up to 125000 (T.C.A. § 62-6-112; Rule 0680-01-.16 (Appendix A)) S-TN-BLC-OUTLINEThe cheapest full contracting path for one's own residential build — three hard edges in the next assertion (rule TN-MONETARY-LIMIT).
- tn:limited-licensed-electrician — sub threshold electrical work (T.C.A. §§ 62-6-102(d), 68-102-150) S-TN-BLC-LLEThe sub-$25,000 electrical answer in participating localities — but BOTH conditions (price ceiling + locality) must hold (rule TN-LLE).
These limits feed the deterministic rules (TN-BLC-LICENSE, TN-SUB-LICENSE, TN-ROOFING-SUB, TN-HIC, TN-LLE, TN-LLP, TN-CMC-A, TN-CE, TN-MONETARY-LIMIT) that project pages evaluate — missing facts return NOT_DETERMINED, never a forced answer.