States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
South DakotaAvailable
North CarolinaAvailable
TennesseeAvailable
IllinoisAvailable
UtahAvailable
New JerseyAvailable
ConnecticutAvailable
All states →
Projects
187 project guides — open the list

HVAC Installation Requirements in Illinois

Illinois HVAC installation: no statewide mechanical, HVAC, sheet metal or fuel gas licence exists (verified absence REQ-IL-NO-MECHANICAL-001, assembled from IDFPR's profession list, IDPH's plumbing mandate and OSFM's sprinkler mandate) — so the job resolves through the local mechanical permit under the statewide codes, Chicago's general contractor class for the prime plus the City's own sheet metal/HVAC trade licence (fee withheld by name), Cook County's flat registration, and — the line that matters — the OSFM fire sprinkler licence at a $0 floor if the work touches a fire protection system. Every claim sourced.

Verified 2026-10-115 sourced requirements3 credential linksIndexation gate: passed

01 The requirements, sourced

  • No statewide mechanical, HVAC, sheet metal or fuel gas licence exists (verified absence) — Illinois issues no mechanical, HVAC, sheet metal or fuel gas contractor licence at state level. The IDFPR profession list (machine-read 2026-10-11) has no mechanical entry; IDPH's mandate is plumbing (+ irrigation) and OSFM's is fire sprinklers; 225 ILCS 317/320/335 do not reach mechanical work. HVAC and ductwork are governed by the statewide building/mechanical codes through LOCAL permit regimes (Chicago licenses Sheet Metal/HVAC contractors through its DOB trade licences — fees not machine-readable this session, research §O). S-IL-IDFPR-PROFLIST
  • Fire sprinkler contractor licence — two-year $3,000 term, PE/NICET Designated Certified Person, continuing education — OSFM page verbatim: licence required of 'All individuals and businesses who desire to engage in fire sprinkler contracting in this State, except as otherwise exempted in [§ 15 of] the Act', to regulate those 'engaged in the business of planning, selling, installing, maintaining, or servicing fire protection sprinkler systems'. Application verbatim: every applicant 'MUST have either a Designated Certified Person or a Responsible Managing Employee'; 'As of July 1, 2021, no person or business organization applying for a NEW Fire Sprinkler Contractor License may select to employ a Responsible Managing Employee' — the DCP must hold 'a current Illinois Professional Engineers License or current NICET Level III or IV Certification in Water-Based Systems Layout'. Fees (p. 4): 'Initial License (2-year license) $3,000; Renewal … $3,000; Late Renewal … (up to a year after expiration; includes a $500 late filing fee) $3,500; Duplicate or Corrected $50. Do not remit fees with application … you will be invoiced.' Continuing education is required (OSFM approved-provider list); a grandfather clause exists for pre-2000 operators. S-IL-SFM-APP
  • Unincorporated Cook County — contractor registration by trade: $150 initial + $75 per trade per year, $1M general liability — County page verbatim: 'All contractors performing work in unincorporated Cook County are required to register with the Cook County Department of Building and Zoning.' 'The initial registration fee is $150 per trade. To keep your registration active, there is an annual fee of $75 per trade due by December 31 each year.' Every lane needs '$1,000,000.00 in General Liability' naming the County as certificate holder. Trade conditions: electrical — a supervising electrician's licence from an Illinois city/town/village 'that has an electrical commission that administers an examination'; plumbing — 'Only a corporate officer holding the state plumbing license for the corporation may register', with the IDPH plumbing contractor registration, a State Plumber or Chicago Journeyman Plumber's licence, three completed-installation and three business references; roofing — 'a State of Illinois Roofing License must be submitted'; demolition — an approved bond; crane operators — City-of-Chicago-recognised certification, notarised, non-transferable. Homeowners register free as 'General' contractors, residing on the property, with $1M homeowner GL naming the County as additional insured. Initial registration is IN PERSON (application PDF). S-IL-COOK-REG
  • Chicago general contractor licence — five value classes (A–E), annual, with the matching insurance ladder — A City of Chicago general contractor licence 'is required to perform most types of building construction, alteration, repair, and demolition work within the city' (DOB page, verbatim via search index). Classes and caps (application verbatim — the packet prints each class's ceiling as a 'not entitled to engage' bar, abbreviated below to the value itself): A — 'no limitation as to the value of any single contract project', $3,500; B — 'not entitled to engage in construction of any single contract project of value in excess of $20,000,000', $1,800; C — in excess of $10,000,000, $1,300; D — in excess of $4,000,000, $900; E — in excess of $500,000, $300. Insurance (§ 4-36-090 verbatim): CGL at $5M/$3M/$2M/$2M/$1M per occurrence respectively, from an insurer 'with a credit rating of B+ or higher by A.M. Best Company', with '30 days' advance notice to the commissioner prior to cancellation or lapse', the City 'as an additional insured on a primary, non-contributory basis', and 'A single violation of this section shall result in suspension or revocation … in accordance with section 4-4-280'. Term (§ 4-36-070): 'payable annually … shall expire one year after issuance'. The Commissioner MAY require an online training programme completed by a licensee employee in the preceding 12 months (§ 4-36-065). No examination appears on the City's application. S-IL-CHI-GC-APP
  • Building, electrical, plumbing and mechanical permits and inspections are LOCAL everywhere in Illinois — IDPH page verbatim: the Illinois Plumbing Code (77 IAC 890) is adopted statewide, but plumbing permits and inspections are run by local health departments and municipalities under IDPH oversight; building, mechanical and electrical permits run through municipal or county building departments (Chicago DOB; Cook County Building and Zoning; village building departments). Illinois has NO state building-permit office — every permit fact is LOCAL_AUTHORITY_REQUIRED. S-IL-DPH-PLUMBING

02 Which credentials this project can touch

CredentialRelationRuleSource
Cook County 'General' contractor registration (other trades + homeowners)may requireIL-COOK-REGS-IL-COOK-REG
Chicago General Contractor — Class E (up to $500,000)alternativeIL-CHI-GCS-IL-CHI-GC-APP
Fire Sprinkler Contractor licence (OSFM)component basisIL-SPRINKLERS-IL-SFM-PAGE

Each row is one (project, classification, relation) triple the research record can source — the rendered sections and the seeded evidence can never disagree.

03 Deterministic rules applied

  • IL-NO-STATE-TRADE
  • IL-SPRINKLER
  • IL-COOK-REG
  • IL-CHI-GC
  • IL-LOCAL-PERMITS

Illinois has no conflict rows (the research pass found no official-vs-official disagreement), so this page publishes no conflict notice — the eleven named gaps live on the fees page's withheld list instead.

04 What it costs

FeeAmountSource
Cook County contractor registration — initial, per trade
County service page verbatim: 'The initial registration fee is $150 per trade.' Initial registration is filed IN PERSON by the owner or a corporate officer (application PDF); homeowners' 'General' registration is free of charge.
$150S-IL-COOK-REG
Roofing contractor licence — application (Limited and Unlimited alike)
RF application packet verbatim: 'Payment of $125.00 in the form of a U.S. check or money order made payable to IDFPR', and the checklist's 'An application fee of $125' — the SAME price for Limited and Unlimited (packet machine-read 2026-10-11). Fees are non-refundable; the application 'is active for three years from the date of receipt by the Department' and the Department asks applicants to 'allow eight business weeks'.
$125S-IL-RF-APP
Roofing contractor licence — renewal price NOT PUBLISHED on the application (cycle verified)
PRICE WITHHELD BY NAME (research §O.1): the RF packet prints the $125 application fee and the biennial term ('The license will expire on December 31st of each odd numbered year regardless of when it is issued') but NOT the renewal price, and no IDFPR page read this session published it — unofficial secondary sources circulate $150/$300 figures and NONE was verified, so this row records the duty with amount 0 = 'unpublished', never a guess. See RENEW-IL-ROOFING for the verified cycle.
not publishedS-IL-RF-APP
Fire sprinkler contractor licence — initial (2-year licence)
Application fee table p. 4 verbatim: 'Initial License (2-year license) $3,000' — the most expensive Illinois state construction credential. 'Do not remit fees with application. Once your application has been reviewed and approved, you will be invoiced for the applicable fees.'
$3,000S-IL-SFM-APP
Fire sprinkler contractor licence — renewal on or before the expiration date
Application fee table verbatim: 'Renewal of License (before or on expiration date) $3,000'. Continuing education is required for renewal (OSFM approved-provider list).
$3,000S-IL-SFM-APP
Fire sprinkler contractor licence — late renewal (up to one year after expiry)
Application fee table verbatim: 'Late Renewal of License (up to a year after expiration; includes a $500 late filing fee) $3,500'. The $500 late component is printed inside the row itself — after the year, the licence is expired rather than late.
$3,500S-IL-SFM-APP
Fire sprinkler contractor licence — duplicate or corrected licence
Application fee table verbatim: 'Duplicate or Corrected License $50'.
$50S-IL-SFM-APP
Chicago general contractor licence — Class A (no value limitation), annual
DOB application classification block verbatim, cross-checked against the codifier's § 4-5-010 table: '$3,500' per year. § 4-36-070: the fee 'shall be payable annually. A general contractor license shall expire one year after issuance.'
$3,500S-IL-CHI-GC-APP
Chicago general contractor licence — Class B (contracts over $20,000,000), annual
DOB application verbatim: '$1,800'; § 4-5-010 indexed snippet cross-check verbatim: 'General Contractor, Class B (Chapter 4-36). – $1,800.00 (1 year)'.
$1,800S-IL-CHI-GC-APP
Chicago general contractor licence — Class C (contracts over $10,000,000), annual
DOB application classification block verbatim: '$1,300' per year.
$1,300S-IL-CHI-GC-APP
Chicago general contractor licence — Class D (contracts over $4,000,000), annual
DOB application classification block verbatim: '$900' per year.
$900S-IL-CHI-GC-APP
Chicago general contractor licence — Class E (contracts over $500,000), annual
DOB application verbatim: '$300'; the floor of the Chicago value ladder — and the class whose § 4-36-090 insurance floor is $1,000,000 per occurrence.
$300S-IL-CHI-GC-APP
Chicago plumbing contractor licence — annual (MCC ch. 4-336)
Codifier § 4-5-010 indexed snippet verbatim: 'Plumbing Contractor (Chapter 4-336). – $150.00 (1 year). $150.00 (1 year)'; § 4-336-040: 'The license fee shall be as set forth in Section 4-5-010 of this code.' This City fee STACKS on the $150 IDPH state registration (FEE-IL-PC-ANNUAL-001) — two $150 duties for the same Chicago plumbing business.
$150S-IL-CHI-4-5-010
Chicago electrical contractor licence — annual, all classifications (MCC ch. via § 4-5-140)
Codifier § 4-5-140 annual-adjustment snippet verbatim: 'Electrical Contractor, all classifications … $150.00 (1 year). $150.00 (1 year)'. The chapter number and the Electrical Supervisor / journeyman / master fees could NOT be machine-read this session (research §O.7) — flagged, never guessed.
$150S-IL-CHI-4-5-010
Plumber licence — fee after passing the state examination
IDPH 'Retired Plumber's License Application' verbatim (read via the official page's indexed text 2026-10-11): 'apply for the plumber examination with the proper fee ($100) and successfully pass the exam. After passing the exam, the fee for a plumber license is $100.' The plumber and apprentice RENEWAL prices are not on any page read this session (research §O.4) — no renewal fee row is seeded.
$100S-IL-PHL-LIC-FEE
Plumbing contractor registration — annual (initial and renewal alike)
Application body verbatim: '$150 annual registration fee (Registration fees are non-refundable.)'; the IDPH page independently states that 'All plumbing contractors must register with the state and pay an annual fee'. The company registers, the named Plumber of Record carries the competency.
$150S-IL-PC-APP
Plumbing contractor registration — reinstatement / late fee
Form footer verbatim: 'Reinstatement/Late Fee: $100'. The form warns that a late filing suspends the registration and forces re-registration at that penalty; the footer also prints 'Returned Check Fee: $200'.
$100S-IL-PC-APP
Plumbing contractor registration — returned check fee
Form footer verbatim: 'Returned Check Fee: $200'.
$200S-IL-PC-APP
Plumber state examination — application fee (Illinois apprentice route)
Official IDPH examination application verbatim: 'FEES ARE NON-REFUNDABLE. Application Fee for Illinois Licensed Apprentice Plumber: $175.' The parallel line for plumbers registered/licensed in Chicago or out of state is CUT in the retrieved snippet (research §O.3) — no second amount is asserted. Due 30 days before the examination date (225 ILCS 320/10(d)); retakes use the separate Examination Retake Form plus the applicable fee.
$175S-IL-PHL-EXAM
Cook County contractor registration — annual renewal, per trade
County service page verbatim: 'To keep your registration active, there is an annual fee of $75 per trade due by December 31 each year. If you have not renewed your registration in at least two years, please contact the Department…' — the two-year gap is when the registration is treated as lapsed rather than merely late.
$75S-IL-COOK-REG

Municipal permit fees are LOCAL_AUTHORITY_REQUIRED and are not published here.