States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
All states →
Projects
152 project guides — open the list

Solar Installation — North Dakota license requirements

Verified 2026-10-055 official sources3 classification relations4 scope assertionsIndexation gate: passed

01 The project

The starting point is the work itself — Solar Installation in North Dakota. The job determines which trades are involved, and the trades determine which license classifications may be required.

ComponentTrade
Solar energy systemSolar
Electrical interconnectionElectrical

02 Jurisdiction

This project is evaluated for North Dakota — the four-class license state. A construction contractor holds a ch. 43-07 contractor license in a class (A/B/C/D) covering the single-contract value once a job exceeds $4,000, with liability insurance and WSI but no exam and no state bond; electrical (ch. 43-09) and plumbing (ch. 43-18) run through their own credentials, and the building permit is local. North Dakota jurisdiction page.

Limitation — local permit rules stay unknown; the owner question is open

Permit fees, local construction rules and any municipal licensing were not researched and remain LOCAL_AUTHORITY_REQUIRED. The owner-occupant exemption basis is open (CONFLICT-ND-001) and returns NOT_DETERMINED when it is not confirmed — never a guess. State requirements are not the complete story for any locality.

03 Trade → license

Relations below are recorded per state — only this jurisdiction's classifications are shown.

Trades involved: Solar, Electrical.

  • May require ELECTRICAL-CONTRACTING — Electrical Contracting (master, class B or power limited electrician contracting) reported S-ND-SEB-ELEC-CONTRACTING rule ND-SOLAR-CREDENTIAL
    The default answer: there is NO standalone solar license in North Dakota, so a hired rooftop PV install is electrical work — a contracting master (or power limited) electrician plus the ch. 43-09 business prerequisites. 'reported' because the conclusion is assembled from the electrical scope plus the absence of a solar credential (SCOPE-ND-NO-SOLAR), not a single verbatim sentence (research §N.4).
  • Component basis MASTER-ELECTRICIAN — Master Electrician (may contract electrical work) confirmed S-ND-SEB-ELEC-CONTRACTING rule ND-ELEC-CONTRACT
    The individual who must contract and be responsible for the wiring — a master or power limited electrician (NDSEB).
  • Alternative path CLASS-B — Class B Contractor License (single contract up to $500,000) confirmed S-ND-43-07-02 rule ND-LICENSE-REQUIRED
    The general building scope of a PV project (racking, roof work, general construction) may also require a ch. 43-07 contractor license of a covering class when the single-contract value exceeds $4,000.

04 Scope

What the official sources say about the work involved — typed assertions, never a boolean "covers". Interpretations are marked as such.

  • Officially excluded CLASS-B Single Contract Projects Above 500000 (may_not_perform) NDCC 43-07-07(1)(b) S-ND-43-07-07
    The class ceiling decides public-bid eligibility too (43-07-12).
  • Officially included CLASS-B Single Contract Projects Up To 500000 (may_perform) NDCC 43-07-07(1)(b) S-ND-43-07-07
    The positive half of the class-B ceiling; the exclusion is SCOPE-ND-CLASS-B-LIMIT.
  • Requires another classification solar-installation Electrical Contracting Credential No Solar Specific License (requires) NDCC ch. 43-09; NDSEB Electrical Contracting Guidelines S-ND-SEB-ELEC-CONTRACTING
    Project-scope row (no solar classification exists to attach to). 'reported' because the conclusion is assembled from the electrical scope plus the absence of a solar credential, not from a single verbatim sentence (research §N).
  • Officially included ELECTRICAL-CONTRACTING Electrical Wiring Installation Under A Master Or Power Limited Electrician (may_perform) NDCC ch. 43-09; NDSEB Electrical Contracting Guidelines S-ND-SEB-ELEC-CONTRACTING
    Electrical contracting is its own credential family — the contractor license alone does not authorize it (rule ND-ELEC-CONTRACT).

05 Requirements

RequirementKindStatementSource
No standalone solar license — PV installation is electrical contracting
NDSEB Electrical Contracting Guidelines + Secretary of State Contractors page (read 2026-10-05)
licenseNorth Dakota issues no solar-specific contractor credential: the NDSEB licensing scheme covers electrical wiring and apparatus installation and the Secretary of State's list of specialized licenses names only the Electrical Board, the Plumbing Board and other non-solar programmes. A hired rooftop photovoltaic install is therefore electrical work that requires a contracting master (or power limited) electrician and the electrical-contracting business prerequisites under ch. 43-09, not a 'solar license' that does not exist.S-ND-SEB-ELEC-CONTRACTING
Source S-ND-SEB-ELEC-CONTRACTING — North Dakota State Electrical Board (NDSEB)

NDSEB — Electrical Contracting & Non-Contracting Guidelines & Requirements — NDSEB Electrical Contracting Guidelines + Secretary of State Contractors page (read 2026-10-05)

https://www.ndseb.com/licensing/electrical-contracting-non-contracting-guidelines-requirements/

Retrieved 2026-10-05 · last verified 2026-10-05

Read in full 2026-10-05 (official). 'A contract, agreement, or undertaking with another person for the installation of electrical wiring or power limited wiring … may not be entered by anyone other than a master electrician or power limited electrician. A class B electrician may not enter a contract … except for; farmstead electrical wiring or residential electrical wiring in one or two family dwellings located in a city with a population of two thousand five hundred or fewer.' A master/class B/power limited electrician may act for no more than ONE shop or business and must comply with ch. 43-07 contracting with the Secretary of State. To be a contracting electrician the business must register + hold a ND contractor license, then file the Application for Electrical Contracting + E-Cert + certificate of liability insurance 'Policy limits of at least five hundred thousand dollars' with the NDSEB, complete contractor orientation, and pay a $50 (master/power limited) or $40 (class B) license fee. License statuses: contracting / master or electrician of record / non-contracting. Backs REQ-ND-ELEC-CONTRACTING-001, REQ-ND-ELEC-BUSINESS-001 and the electrical insurance and classification rows.

Only a master or power limited electrician may contract electrical work
NDSEB Electrical Contracting Guidelines verbatim (read 2026-10-05)
licenseNDSEB verbatim: 'A contract, agreement, or undertaking with another person for the installation of electrical wiring or power limited wiring … may not be entered by anyone other than a master electrician or power limited electrician. A class B electrician may not enter a contract … except for; farmstead electrical wiring or residential electrical wiring in one or two family dwellings located in a city with a population of two thousand five hundred or fewer.' A master, class B or power limited electrician may exercise privileges for no more than one shop or business and must comply with ch. 43-07 contractor contracting with the Secretary of State.S-ND-SEB-ELEC-CONTRACTING
Source S-ND-SEB-ELEC-CONTRACTING — North Dakota State Electrical Board (NDSEB)

NDSEB — Electrical Contracting & Non-Contracting Guidelines & Requirements — NDSEB Electrical Contracting Guidelines verbatim (read 2026-10-05)

https://www.ndseb.com/licensing/electrical-contracting-non-contracting-guidelines-requirements/

Retrieved 2026-10-05 · last verified 2026-10-05

Read in full 2026-10-05 (official). 'A contract, agreement, or undertaking with another person for the installation of electrical wiring or power limited wiring … may not be entered by anyone other than a master electrician or power limited electrician. A class B electrician may not enter a contract … except for; farmstead electrical wiring or residential electrical wiring in one or two family dwellings located in a city with a population of two thousand five hundred or fewer.' A master/class B/power limited electrician may act for no more than ONE shop or business and must comply with ch. 43-07 contracting with the Secretary of State. To be a contracting electrician the business must register + hold a ND contractor license, then file the Application for Electrical Contracting + E-Cert + certificate of liability insurance 'Policy limits of at least five hundred thousand dollars' with the NDSEB, complete contractor orientation, and pay a $50 (master/power limited) or $40 (class B) license fee. License statuses: contracting / master or electrician of record / non-contracting. Backs REQ-ND-ELEC-CONTRACTING-001, REQ-ND-ELEC-BUSINESS-001 and the electrical insurance and classification rows.

Electrical contracting business: SOS registration + contractor license + NDSEB application + $500,000 insurance
NDSEB Electrical Contracting Guidelines verbatim (read 2026-10-05)
licenseNDSEB: to operate as a contracting master, class B or power limited electrician the business must first register and be licensed as a contractor with the Secretary of State (ch. 43-07), then submit to the NDSEB an Application for Electrical Contracting, an E-Cert application and 'Certificate of Liability Insurance - Policy limits of at least five hundred thousand dollars', and complete a contractor orientation; a $50 license fee (master/power limited) or $40 (class B) applies to a new license. A master of record is responsible for the business's adherence to the wiring standards and may not work on other property.S-ND-SEB-ELEC-CONTRACTING
Source S-ND-SEB-ELEC-CONTRACTING — North Dakota State Electrical Board (NDSEB)

NDSEB — Electrical Contracting & Non-Contracting Guidelines & Requirements — NDSEB Electrical Contracting Guidelines verbatim (read 2026-10-05)

https://www.ndseb.com/licensing/electrical-contracting-non-contracting-guidelines-requirements/

Retrieved 2026-10-05 · last verified 2026-10-05

Read in full 2026-10-05 (official). 'A contract, agreement, or undertaking with another person for the installation of electrical wiring or power limited wiring … may not be entered by anyone other than a master electrician or power limited electrician. A class B electrician may not enter a contract … except for; farmstead electrical wiring or residential electrical wiring in one or two family dwellings located in a city with a population of two thousand five hundred or fewer.' A master/class B/power limited electrician may act for no more than ONE shop or business and must comply with ch. 43-07 contracting with the Secretary of State. To be a contracting electrician the business must register + hold a ND contractor license, then file the Application for Electrical Contracting + E-Cert + certificate of liability insurance 'Policy limits of at least five hundred thousand dollars' with the NDSEB, complete contractor orientation, and pay a $50 (master/power limited) or $40 (class B) license fee. License statuses: contracting / master or electrician of record / non-contracting. Backs REQ-ND-ELEC-CONTRACTING-001, REQ-ND-ELEC-BUSINESS-001 and the electrical insurance and classification rows.

Contractor license required when a job's cost, value or price exceeds $4,000
NDCC 43-07-02(1) + Secretary of State Contractors page (read 2026-10-05)
licenseNDCC 43-07-02(1) verbatim: 'A person may not engage in the business nor act in the capacity of a contractor within this state when the cost, value, or price per job exceeds the sum of four thousand dollars nor may that person maintain any claim, action, suit, or proceeding in any court of this state related to the person's business or capacity as a contractor without first having a license as provided in this chapter.' The Secretary of State restates the trigger: 'When the cost, value, or price of a job exceeds $4,000, the person doing the work must be licensed as a contractor in North Dakota (NDCC ch. 43-07). This includes subcontractors, general contractors, public contractors, and nonresident contractors.' Acting without the license is a class A misdemeanor (43-07-02(2)).S-ND-43-07-02
Source S-ND-43-07-02 — North Dakota Legislative Branch — Century Code (ndlegis.gov)

NDCC 43-07-02 — License required — Construction fraud — Penalty (FindLaw mirror) — NDCC 43-07-02(1) + Secretary of State Contractors page (read 2026-10-05)

https://codes.findlaw.com/nd/title-43-occupations-and-professions/nd-cent-code-sect-43-07-02/

Retrieved 2026-10-05 · last verified 2026-10-05

Read in full 2026-10-05. (1) 'A person may not engage in the business nor act in the capacity of a contractor within this state when the cost, value, or price per job exceeds the sum of four thousand dollars nor may that person maintain any claim, action, suit, or proceeding in any court of this state related to the person's business or capacity as a contractor without first having a license as provided in this chapter.' (2) unlicensed contracting is a class A misdemeanor plus a civil penalty up to three times the 43-07-07 fee. (3)-(5) construction fraud (deception in obtaining payment, willful failure to pay suppliers, willful abandonment per the 60/90/180-day tests, with return-of-payment / legal-excuse / outside-control defenses) graded by amount: under $10,000 class C felony; $10,000-$50,000 class B felony; over $50,000 class A felony. Backs REQ-ND-LICENSE-REQUIRED-001, REQ-ND-REG-TO-SUE-001 and REQ-ND-CONSTRUCTION-FRAUD-001.

Building permits are issued locally; the state license number rides on the permit
NDCC 43-07-24 + Secretary of State Contractors page (read 2026-10-05)
permitNDCC 43-07-24 makes the contractor supply its state license number when applying for a building permit and the permit-issuing official enter it, which means the building permit itself is issued by a local unit of government; the chapter does not create a statewide building-permit document. The specific permit rules, fees and any local licensing of cities and counties were not researched to a conclusion here and are marked LOCAL_AUTHORITY_REQUIRED.S-ND-SOS-CONTRACTORS
Source S-ND-SOS-CONTRACTORS — North Dakota Secretary of State — Contractor Licensing

Secretary of State — Contractors (license, classes, fees, renewal, FirstStop lookup) — NDCC 43-07-24 + Secretary of State Contractors page (read 2026-10-05)

https://www.sos.nd.gov/business/licensing-registration/contractors

Retrieved 2026-10-05 · last verified 2026-10-05

Read in full 2026-10-05 (official). Verbatim: 'When the cost, value, or price of a job exceeds $4,000, the person doing the work must be licensed as a contractor in North Dakota (NDCC ch. 43-07). This includes subcontractors, general contractors, public contractors, and nonresident contractors.' Application documents = certificate of liability insurance naming the Secretary of State as certificate holder + WSI certificate of payment (or letter of good standing if no in-state employees). Full fee table: A $450 / B $300 / C $225 / D $100; renewal A $90 / B $60 / C $45 / D $30. Renewal: on or before March 1 each year via FirstStop, including a list of projects over $50,000, certification that payroll taxes/WSI/UI premiums are paid, and a certificate of liability insurance. 'In addition to a contractor's license, you may need to obtain other licenses or permits … Licenses issued by the ND State Electrical Board [and] the ND State Plumbing Board.' Official lookup = FirstStop. Backs the class, fee, renewal and insurance rows.

06 Rule: ND-SOLAR-CREDENTIAL

North Dakota issues no standalone solar license: rooftop photovoltaic installation is electrical work under ch. 43-09, requiring a contracting master or power limited electrician and the electrical-contracting business prerequisites. This rule returns NOT_DETERMINED when the solar-work fact is missing. Marked 'reported' because the conclusion is assembled from the electrical scope plus the absence of a solar credential.

OutcomeConclusionCaveats
solar-electrical-requiredelectrical_contracting_credential_required
  • The general building scope of a PV project may also need a ch. 43-07 contractor class when the single-contract value exceeds $4,000.
  • No solar tax or interconnection rule was researched (NOT_VERIFIED).
solar-credential-heldelectrical_credential_held—
not-solarnot_solar_work—

Rule confidence: reported. Missing inputs produce NOT_DETERMINED — never a forced answer. Sources: S-ND-SOS-CONTRACTORSS-ND-SEB-ELEC-CONTRACTING

07 Rule: ND-ELEC-CONTRACT

NDSEB / NDCC ch. 43-09: only a master or power limited electrician may enter a contract to install electrical wiring; a class B electrician may only contract farmstead wiring or one/two-family residential wiring in cities of 2,500 or fewer. A contracting electrical business must also register and hold a ch. 43-07 contractor license and file the NDSEB electrical-contracting application with liability insurance of at least $500,000. Missing facts yield NOT_DETERMINED.

OutcomeConclusionCaveats
master-contractsmay_contract_electrical—
class-b-limitedclass_b_limited_contracting
  • Outside that scope a contracting master or power limited electrician is required.
no-electrical-credentialelectrical_contracting_credential_required—

Rule confidence: confirmed. Missing inputs produce NOT_DETERMINED — never a forced answer. Sources: S-ND-SEB-ELEC-CONTRACTING

08 Rule: ND-LICENSE-REQUIRED

NDCC 43-07-02(1): a person may not act as a contractor in North Dakota when the cost, value or price PER JOB exceeds $4,000 without a state contractor license from the Secretary of State, nor maintain a claim or suit on that work. The definition of 'contractor' is broad (43-07-01(1)) and includes subcontractors, public contractors and nonresident contractors. Acting without the license is a class A misdemeanor plus a civil penalty up to three times the 43-07-07 fee. Exemptions and the owner question are SEPARATE rules (ND-MINOR-4K, ND-OWNER-PROPERTY). Missing facts yield NOT_DETERMINED.

OutcomeConclusionCaveats
license-requiredcontractor_license_required
  • Test ND-MINOR-4K first — a single job at or below $4,000 does not itself trigger the duty.
  • Test ND-OWNER-PROPERTY — the owner-occupant question is OPEN (CONFLICT-ND-001) and returns NOT_DETERMINED when the exemption basis is not confirmed.
  • The class must cover the single-contract value (rule ND-CLASS-SCOPE) and public bids must enclose the class license (43-07-12).
  • Electrical and plumbing work need their OWN trade credentials on top (rules ND-ELEC-CONTRACT, ND-PLUMB-MASTER).
license-heldlicense_already_held
  • Holding a contractor license is not holding a trade credential — electrical (ch. 43-09) and plumbing (ch. 43-18) work needs its own credentials.
within-thresholdno_license_trigger_at_or_below_4000
  • Repeated jobs can still be 'engaging in the business of construction' (43-07-01(1)) — evaluate ND-MINOR-4K's second branch.
  • Electrical/plumbing work is regulated separately regardless of price (ND-ELEC-CONTRACT, ND-PLUMB-MASTER).
not-a-contractoroutside_chapter_43_07
  • 43-07-08 exceptions remain the only enumerated ones: government representatives and unaffixed fabricated products.

Rule confidence: confirmed. Missing inputs produce NOT_DETERMINED — never a forced answer. Sources: S-ND-43-07-02S-ND-43-07-01S-ND-SOS-CONTRACTORS

09 No solar license — the electrical credential

QuestionNorth Dakota answerSource
Generic solar licensenone exists — the credential is electrical (rule ND-SOLAR-CREDENTIAL)S-ND-SEB-ELEC-CONTRACTING
Default credential patha contracting master or power limited electrician plus the electrical-business prerequisites (rule ND-ELEC-CONTRACT)S-ND-SEB-ELEC-CONTRACTING
General building scopemay also need a ch. 43-07 class license above $4,000 (rule ND-LICENSE-REQUIRED)S-ND-43-07-02
Business prerequisitesSOS registration + contractor license + NDSEB Application for Electrical Contracting + $500,000 insuranceS-ND-SEB-ELEC-CONTRACTING

10 Permit and verification layer

North Dakota separates the credential from the permit: the STATE decides who may work (the ch. 43-07 license and the ch. 43-09 / ch. 43-18 trade credentials), while the city or county issues the building permit. NDCC 43-07-24 makes the contractor supply its license number and the issuer enter it, and 43-07-12 makes public bids enclose the class license. The permit and its rules are local — LOCAL_AUTHORITY_REQUIRED. S-ND-43-07-24

Verify the credential that actually applies on the official lookup before relying on any outcome here: Secretary of State FirstStop contractor search (the NDSEB and the State Plumbing Board are the trade-credential authorities). S-ND-SOS-CONTRACTORS

Source S-ND-43-07-04 — North Dakota Legislative Branch — Century Code (ndlegis.gov)

NDCC 43-07-04 — License — How obtained — Failure to grant — Revocation for not in good standing (FindLaw mirror) — NDCC 43-07-04(1) + 43-07-10(1) + Secretary of State Contractors page

https://codes.findlaw.com/nd/title-43-occupations-and-professions/nd-cent-code-sect-43-07-04/

Retrieved 2026-10-05 · last verified 2026-10-05

Read in full 2026-10-05. (1) an applicant 18+ files an application under oath 'containing a statement of the applicant's experience and qualifications as a contractor', with a certificate of liability insurance and a statement from North Dakota workforce safety and insurance; the registrar may require criminal-history information; the application must specify the CLASS sought. (2) refusal for incomplete information with a 10-day cure and district-court appeal. (3)(4) 'not in good standing' for failure to maintain liability insurance or required business registrations; the contractor must cease soliciting or entering new projects and the license may be revoked. The application document list (insurance + WSI, NO bond) backs REQ-ND-APPLICATION-001, REQ-ND-INSURANCE-LIABILITY-001 and REQ-ND-NO-BOND-001.

Evidence

S-ND-43-07-01statute
North Dakota Legislative Branch — Century Code (ndlegis.gov)
NDCC 43-07-01 — Definitions (FindLaw mirror of the Century Code)
https://codes.findlaw.com/nd/title-43-occupations-and-professions/nd-cent-code-sect-43-07-01/
verified 2026-10-05retrieved 2026-10-05
S-ND-43-07-02statute
North Dakota Legislative Branch — Century Code (ndlegis.gov)
NDCC 43-07-02 — License required — Construction fraud — Penalty (FindLaw mirror)
https://codes.findlaw.com/nd/title-43-occupations-and-professions/nd-cent-code-sect-43-07-02/
verified 2026-10-05retrieved 2026-10-05
S-ND-43-07-07statute
North Dakota Legislative Branch — Century Code (ndlegis.gov)
NDCC 43-07-07 — Classes of licenses — License fees — License renewal fees (FindLaw mirror)
https://codes.findlaw.com/nd/title-43-occupations-and-professions/nd-cent-code-sect-43-07-07/
verified 2026-10-05retrieved 2026-10-05
S-ND-SEB-ELEC-CONTRACTINGboard page
North Dakota State Electrical Board (NDSEB)
NDSEB — Electrical Contracting & Non-Contracting Guidelines & Requirements
https://www.ndseb.com/licensing/electrical-contracting-non-contracting-guidelines-requirements/
verified 2026-10-05retrieved 2026-10-05
S-ND-SOS-CONTRACTORSboard page
North Dakota Secretary of State — Contractor Licensing
Secretary of State — Contractors (license, classes, fees, renewal, FirstStop lookup)
https://www.sos.nd.gov/business/licensing-registration/contractors
verified 2026-10-05retrieved 2026-10-05

Verification

Page last verified
2026-10-05
newest verification date across the sources this page depends on
Policy reviewed
2026-10-05
policy: index — Distinct, honest evidence: NO standalone solar license exists (verified absence), so rooftop PV is electrical work under ch. 43-09 with a contracting master/power limited electrician and the business prerequisites; the general building scope may also need a ch. 43-07 class; the conclusion is labeled 'reported' where it is assembled rather than verbatim — no solar tax/interconnection claim is made (NOT_VERIFIED).
Rules applied
3
ND-LICENSE-REQUIRED, ND-ELEC-CONTRACT, ND-SOLAR-CREDENTIAL