States
CaliforniaAvailable
FloridaAvailable
ArizonaAvailable
TexasAvailable
GeorgiaAvailable
NevadaAvailable
ColoradoAvailable
WashingtonAvailable
North DakotaAvailable
MaineAvailable
MarylandAvailable
MassachusettsAvailable
AlabamaAvailable
OhioAvailable
OklahomaAvailable
OregonAvailable
PennsylvaniaAvailable
Rhode IslandAvailable
South CarolinaAvailable
New HampshireAvailable
MichiganAvailable
VermontAvailable
IdahoAvailable
LouisianaAvailable
MinnesotaAvailable
MississippiAvailable
AlaskaAvailable
VirginiaAvailable
ArkansasAvailable
New YorkAvailable
South DakotaAvailable
North CarolinaAvailable
TennesseeAvailable
All states →
Projects
167 project guides — open the list

Solar Installation Requirements in Tennessee

Tennessee solar installation: no solar installer credential exists (assembled absence, confidence reported) — the work is electrical and building at once. At $25,000 or more it is the contractor's licence with the CE electrical family (trade exam on CE-B buildings) and the S-specialty 'Solar Panel Installation' code on the building side; below the line the Limited Licensed Electrician answers in Fire Prevention localities; DC wiring, permits and interconnection run through the local electrical inspector, because Tennessee has no electrical board at all. Every claim sourced.

Verified 2026-10-105 sourced requirements3 credential linksIndexation gate: passed

01 The requirements, sourced

  • Contractor's licence required before bidding on any project of $25,000 or more — A contractor's licence must be in hand BEFORE contracting — 'including bidding, offering to engage, or negotiating a price' — for any project of $25,000 or more when acting as a prime contractor, certain subcontractor, or construction manager/consultant (Board page verbatim; § 62-6-103). The threshold counts the total project cost including materials, equipment and labor. An owner who contracts directly is a 'prime contractor' by statute (§ 62-6-102); the Board may allow an exception only up to 10% of the monetary limit (§ 62-6-103(a)(1)). S-TN-BLC-CONTRACTOR
  • No standalone solar installer licence exists (verified absence) — Tennessee issues no solar-specific credential. Solar installation is the NO-EXAM specialty classification S-Solar Panel Installation on the same contractor licence (≥ $25,000 or whenever contracting at the threshold), with the electrical work carried by CE — or LLE below $25,000 in localities using the Division of Fire Prevention. Utility interconnection and local permitting sit outside the Board's reach. S-TN-BLC-OUTLINE
  • Limited Licensed Electrician for electrical work under $25,000 — only in Fire Prevention localities — 'The Limited Licensed Electrician (LLE) license is only required by electricians performing work in a municipality utilizing the Division of Fire Prevention for permits or inspections and covers work less than $25,000 per project. Always first check with your local government … The LLE license is issued to individuals passing the LLE trade exam' (licence page verbatim). Statutory hooks: § 62-6-102(d) (definition), § 68-102-150 (registration with the state fire marshal). § 62-6-130: an LLE 'is not a contractor'. Initial fee $50; exam via Prov. S-TN-BLC-LLE
  • No statewide electrical board exists (verified absence) — Tennessee has NO electrical commission or board. Electrical work is regulated through the SAME Board for Licensing Contractors via two classifications — CE (electrical contracting, ≥ $25,000, trade exam for the full and building/transmission/substation/alarm>70V/roadway/meter classes) and LLE (individual, < $25,000, only in localities using the Division of Fire Prevention) — plus whatever licensing the local electrical inspection authority imposes below and above the line. S-TN-TDCI-BOARDS
  • Below $25,000 — and for every municipal rate — the local building department is the authority — Sub-threshold work, building permits, local electrical/plumbing/mechanical licensing and inspection fees are governed by city/county codes departments. Three official surfaces fix the boundary: the Board's guidance to 'Always first check with your local government' on the LLE and LLP pages; § 62-6-406 preserving 'Municipal and county licenses' for plumbing; and the nine-county adoption structure of the Home Improvement law (§ 62-6-501 et seq.). No municipal code or fee schedule was opened, so every city/county fact stays LOCAL_AUTHORITY_REQUIRED (research §O/§P). S-TN-BLC-LLE

02 Which credentials this project can touch

CredentialRelationRuleSource
Solar Panel Installationmay requireTN-BLC-LICENSES-TN-BLC-OUTLINE
Full Electrical Contracting (CE)component basisTN-CES-TN-BLC-OUTLINE
Limited Licensed ElectricianalternativeTN-LLES-TN-BLC-LLE

Each row is one (project, classification, relation) triple the research record can source — the rendered sections and the seeded evidence can never disagree.

03 Deterministic rules applied

  • TN-BLC-LICENSE
  • TN-CE
  • TN-LLE
  • TN-NO-TRADE-LICENCE
  • TN-LOCAL

04 What it costs

FeeAmountSource
Home Improvement licence — duplicate
Fees page verbatim: 'Duplicate license — $10'.
$10S-TN-BLC-FEES
Contractor licence — initial, reinstatement or ownership change
Fees page table row verbatim: 'Initial / Reinstatement / Ownership Change — $250' (machine-read 2026-10-10 with the Contractor accordion open). The contractor page separately states 'Application fee: $250' and points at CORE (core.tn.gov); the fee is non-refundable. Majority ownership change, merger or reorganisation requires this fresh application (renewal page).
$250S-TN-BLC-FEES
Contractor licence — biennial renewal
Fees page verbatim: 'Renewal — $200'. Renewal documents: financial statement (Compiled by a licensed CPA above $1.5M, self-prepared balance sheet below), GL certificate, WC proof or CSP/handyman, SOS active status (renewal page). Coming out of retirement also costs this $200 plus full documents.
$200S-TN-BLC-FEES
Contractor licence — late renewal penalty, per month
Fees page verbatim: 'Late renewal penalty, per month — $20 (maximum of 12 months)'. Renewal page verbatim: 'The grace period for renewal is 12 months. A $20/month late fee will be applied' — after the grace, full re-application at $250.
$20S-TN-BLC-FEES
Contractor licence — mode of operation change
Fees page verbatim: 'Mode of Operation Change — $100'. Renewal page: the change must be filed within 90 days, no new bidding until the revised licence issues, existing contracts may continue (Rule 0680-01-.02).
$100S-TN-BLC-FEES
Contractor licence — retirement, per year of renewal
Fees page verbatim: 'Retirement, per year of renewal — $25 (maximum of 7 years)'; renewal page adds the '$200 renewal fee every seven (7) years' RESET and that exiting retirement costs the $200 renewal plus full documents.
$25S-TN-BLC-FEES
Contractor licence — duplicate
Fees page verbatim: 'Duplicate license — $25'.
$25S-TN-BLC-FEES
Home Improvement licence — initial, reinstatement or ownership change
Fees page (Home Improvement table) verbatim: 'Initial / Reinstatement / Ownership Change — $250'; the HIC licence page repeats 'initial fee of $250' applied for at core.tn.gov.
$250S-TN-BLC-FEES
Home Improvement licence — renewal
Fees page verbatim: 'Renewal — $200'. Renewal adds current bond/GL/WC/SOS evidence (renewal page). The renewal TERM length was not published on any page read — withheld by name (research §O).
$200S-TN-BLC-FEES
Home Improvement licence — late renewal penalty, per month
Fees page verbatim: 'Late renewal penalty, per month — $10 (maximum of 3 months)'.
$10S-TN-BLC-FEES
Limited Licensed Electrician — late renewal penalty, per month
Fees page verbatim: 'Late renewal penalty, per month — $10 (maximum of 3 months)'.
$10S-TN-BLC-FEES
Limited Licensed Electrician — duplicate
Fees page verbatim: 'Duplicate license — $5'.
$5S-TN-BLC-FEES
Limited Licensed Plumber — initial or reinstatement
Fees page (LLP table) verbatim: 'Initial / Reinstatement — $75'; the LLP licence page repeats 'initial license fee of $75'. Exam fee payable to Prov is withheld by name (§O).
$75S-TN-BLC-FEES
Limited Licensed Plumber — renewal
Fees page verbatim: 'Renewal — $50'; 3-month grace at $10/month. Cycle not published on any page read (§O).
$50S-TN-BLC-FEES
Limited Licensed Plumber — late renewal penalty, per month
Fees page verbatim: 'Late renewal penalty, per month — $10 (maximum of 3 months)'.
$10S-TN-BLC-FEES
Limited Licensed Plumber — duplicate
Fees page verbatim: 'Duplicate license — $5'.
$5S-TN-BLC-FEES
Pre-license Course Provider — initial licence
Fees page (Course Provider table) verbatim: 'Initial — $1,500'. One of the Board's five regulated professions; providers also carry a $50,000 surety bond (Insurance Resources matrix).
$1,500S-TN-BLC-FEES
Pre-license Course Provider — renewal
Fees page verbatim: 'Renewal — $1,000'.
$1,000S-TN-BLC-FEES
CMC / CMC-A exam pre-approval — Board fee
Exam page verbatim: 'Pre-approval is required by the Board to take the plumbing CMC-A or full mechanical CMC exam … $50 fee'. The ONLY exam-related amount Tennessee publishes — actual Prov/PSI exam fees are withheld by name (§O).
$50S-TN-BLC-EXAM
Limited Licensed Electrician — renewal
Fees page verbatim: 'Renewal — $50'; 3-month grace at $10/month. Cycle not published on any page read (§O).
$50S-TN-BLC-FEES
Limited Licensed Electrician — reinstatement
Fees page verbatim: 'Reinstatement — $80' — the ONE profession where the Board's table prices reinstatement ABOVE its initial fee (LLP's table combines initial/reinstatement at $75).
$80S-TN-BLC-FEES
Limited Licensed Electrician — initial licence
Fees page (LLE table) verbatim: 'Initial — $50'; the LLE licence page repeats the $50 initial fee. Exam fee payable to Prov is withheld by name (§O) — the $50 here is the BOARD's licence fee, not the exam.
$50S-TN-BLC-FEES

Municipal permit fees are LOCAL_AUTHORITY_REQUIRED and are not published here.